Search Documents

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2000

  • ISEE
    Transition of the Seismograph from a Tool of Litigation to a Tool of Production Efficiency

    By David S. Bowling

    The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air

    Jan 1, 1990

  • SAIMM
    Kriging estimation of block densities in Ahmavaara PGE-deposit

    By E. Laine

    Rock density determinations are necessary for ore resource evaluations from estimated block grades in g/t. Rock density depends on the mineral composition and, thus, it is specific for each rock type.

    Jan 1, 2003

  • SME
    Placement Of Concrete Lining For Water Tunnel No. 3, Manhattan Portion

    By Robert Labbe

    The final tunnel lining for this project involved pumping vast quantities of concrete over large distances under the extremely busy streets of lower Manhattan. Approximately 68,000 cubic meters (89,00

  • TMS
    A Study on Nickel Containing Iron Alloy Production From West Anatolian Region Lateritic Ores

    By Cem Colakoglu

    In this study, nickel containing iron alloys were produced by carbothermal reduction of lateritic nickel ores obtained from Manisa - Caldag region of Turkiye in order to investigate the reaction mecha

    Jan 1, 2009

  • CIM
    Comparison of Flotation Grade Dynamics Enabled By Real-Time Measurement

    By F. E. du Plessis

    "The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota

    Jan 1, 2012

  • NIOSH
    OFR-207-84 Accident Cost Indicator Model Reference And User Manual

    By Daniel G. Di Canio

    Reference information and user instructions for Version 3.0 of the Accident Cost Indicator Model (ACIM) software package are presented. ACIM estimates the tangible costs of occupational injuries, illn

    Jan 1, 1983

  • AIME
    Drilling - Equipment, Methods and Materials - Fracture Gradient Prediction and Its Application in Oilfield Operations

    By B. A. Eaton

    The subject of many discussions and technical papers in the last 20 years has been the prediction of the well-bore pressure gradients that are required to induce or extend fractures in subsurface form

    Jan 1, 1970

  • SME
    International Education Of Mining Engineers - An Update On The Australian Experience And International Opportunities For Collaboration - Preprint 09-003

    Collaboration between education providers is the key to long-term sustainability and improved quality in mining education. The mining industry is now, more than ever, an industry doing business on a

    Jan 1, 2009

  • NIOSH
    Helium (2af1a135-8295-4649-857e-48f24312c552)

    By Edwin M. Thomasson

    HELIUM SHIPMENTS in 1964 exceeded the volume shipped during the previous year for the 15th successive time. Shipments from Bureau of Mines helium plants were 667.4 million cubic feet,2 about 6 percent

    Jan 1, 1965

  • SME
    Single Bore Solution For Transit Tunnels

    By Verya Nasri

    The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is

    Jan 1, 2010

  • SAIMM
    The Strategic And Tactical Value Of A 3D Geotechnical Model For Mining Optimization, Anglo Platinum, Sandsloot Open Pit

    Sandsloot open pit is situated on the northern limb of the Bushveld Complex, 250 km north east of Johannesburg, South Africa. Sandsloot is currently the largest open pit platinum mine in the world and

    Jan 1, 2006

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles

    By M. C. Bétournay

    Hydrogen fuel cells are a known technology, having been applied to stationary (e.g. equipment, buildings, and power plants) and vehicle applications (e.g. transit buses and space shuttles). There is c

    May 1, 2005

  • CIM
    Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)

    By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson

    "Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu

    Jan 1, 2005

  • AUSIMM
    The effect of high geo-temperature environment on spontaneous combustion – an experimental study

    By Y Xiao, C Lei, C Shu, W Wang, K Wang, J Deng

    To investigate the effect on coal spontaneous combustion with high geo-temperature, an experimental apparatus was developed to measure characteristic parameters of two kinds of coal samples at differe

    Aug 28, 2017

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • SME
    Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift Method

    By John F. MacDonald

    This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp

    Jan 1, 1985

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • SME
    On The Lateral Stiffness Of Gearless Mill Bearings

    By R. L. Guerguerian

    Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.

    Jan 1, 2000