Search Documents

  • SME
    Effects of Longwsll Subsidence on Escarpment Stability

    By Valois R. Shea-Albin

    Increasing pressure from State and Federal agencies to mitigate mining-induced subsidence damage to overlying structures has presented a unique problem to the coal industry in the western United Stat

    Jan 1, 1986

  • SAIMM
    Checks and Measures of Performance for Kriging Estimates

    By J. L. Deutsch

    Block model estimates are commonly calculated by the well-established technique of kriging. The mathematics are well established, but implementation details require site-specific considerations. Check

    Jan 1, 2014

  • CIM
    Oil Sands Projects In Alberta; a Survey

    By David W. H. Ellis

    This presentation will discuss over 2 dozen past, present and future oils sands projects in Alberta. The very early projects as well as the most recent along with the ones that never got off the groun

    May 1, 2004

  • ISEE
    Pre-Splitting With The New AIRDEK Technique

    By David G. Borg, John Bussey

    The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application

    Jan 1, 1988

  • SAIMM
    Large-scale 3D characterisation of in-situ stress field in a complex mining district prone to rockbursting

    By J. P. Josien, J. F. Noirel, F. Lahaie, P. Bigarre, M. Al Heib

    ABSTRACT: In June 2001, a fatal rockburst affected a longwall face in the Houillères du Bassin de Lorraine (HBL), France. Subsequently, a large operation of in situ stress measurements by overcoring w

    Jan 1, 2003

  • AUSIMM
    Metallurgical Factors Controlling the Capacity of Lead Sinter Plants

    Updraft sintering of lead concentrates was introduced at Port Pirie in 1955 and since that time a considerable amount of investigational work has been carried out in the laboratory and on the plant wi

    Jan 1, 1964

  • AUSIMM
    Quantifying Domain Uncertainty for an Iron Ore Deposit

    By A Jewbali, J Phillips, C Boyle

    Normal practice in the mining industry is the creation of a single geological model. These models provide a single interpretation of the geological and mineralisation domains. These interpretations in

    Aug 12, 2013

  • NIOSH
    OFR-106(2)-85 Cost-Effectiveness Of Dust Controls Used On Unpaved Haul Roads - Volume II -- Data

    By Keith D. Rosbury

    The basic objective of this project was to determine the cost-effectiveness of dust control used on unpaved mine haul roads. Field testing was conducted at three surface coal mines (two in Wyoming, on

    Jan 1, 1983

  • IIMP
    Evaluación de las alternativas de planeamiento a largo Plazo en la Mina Toquepala

    By Tomás Gonzáles

    El presente trabajo describe la metodología usada para evaluar las estrategias de las alternativas del planeamiento a largo plazo en la explotación del mineral y el lixiviable en la Mina Toquepala.

    Aug 25, 2002

  • NIOSH
    RI 7070 New England Beryllium Investigations

    By William R. Barton

    Sampling to determine development potential of beryllium deposits was conducted at 31 New England localities. A total of 54 additional areas where the geochemical environment appeared favorable were s

    Jan 1, 1968

  • AUSIMM
    Life Cycle Assessment of Process Options for Copper Production

    By Y Zhuang, S La Brooy

    The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi

    Jan 1, 2002

  • SME
    Small Mine Contractor Safety - Case Studies

    By F. Calizaya

    The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind

    Jan 1, 2008

  • ISEE
    "Journal: GPS Signal Accuracy Improves"

    By Larry Schneider

    Are you one of the thousands of hunters, fisherman, or hikers who purchased handheld GPS systems over the past several years and then been disappointed in their accuracy and performance. Or maybe you

    Jan 1, 2001

  • AIME
    Discussion of Papers Published Prior to September 1963 - New Concepts in Thickener Design, Underflow Pump Arrangement and Automatic Controls

    By D. L. King, C. D. Rubert, R. W. Christy, B. A. Schepman

    R. W. Christy (Manager of Sales, Sanitary Engineering Equipment, Link-Belt Co.) and C.D. Rubert (Barrett, Haentjens & Co.) — Messrs. King and Schepman have presented an excellent paper which outlin

    Jan 1, 1963

  • SME
    Strata Control

    By Christopher J. Bise

    INTRODUCTION Perhaps no other area reflects the art as well as the science of mining-engineering design quite as obviously as strata control. This is due to the fact that the design of mining stru

    Jan 1, 1986

  • NIOSH
    RI 3425 Progress Reports -Metallurgical Division ? 27. Ore-Testing Studies, 1937-38 (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.)

    By C. W. Davis

    This report follows the same general scheme as did its predecessors; it begins with a dissertation on some phase of ore-testing, continues with results of investigations of ore-treatment methods and o

    Jan 1, 1938

  • NIOSH
    RI 3425 Progress Reports - Metallurgical Division ? 27. Ore-Testing Studies, 1937-38 - (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.) ? Introduction And Summary

    By C. W. Davis

    This report follows the same general scheme as did its predecessors; it begins with a dissertation on some phase of ore-testing, continues with results of investigations of ore-treatment methods and o

    Jan 1, 1938

  • SME
    Helping Banks To Manage Mineral Land Trusts

    By S. M. Pickering

    Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties

    Jan 1, 2002

  • SAIMM
    Comparison Of Operator Line-Of-Sight (LOS) Assessment Techniques: Evaluation Of An Underground Load-Haul-Dump (LHD) Mobile Mining Vehicle

    By J. West

    For many years line-of-sight (LOS) issues for underground mobile equipment is a growing focus of research. This research is a result of the numerous fatalities and injuries which occur in the mining i

    Jan 1, 2007

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003