Search Documents

  • SAIMM
    Large-scale infrastructure projects. Application of rock mechanics in geotechnical engineering to avoid delays in constrution time and increases of costs—case studies

    By W. Wittke

    SUMMARY: Geotechnical problems often lead to an increase of construction time and costs for large highway and railway projects. Some reasons, which have led to failures and thus to a delay of construc

    Jan 1, 2003

  • AUSIMM
    Comprehensive Models of In-Situ and Dump Leaching

    By Beavis FC, Box JC

    The important chemical and fluid flow phenomena in heap, dump and in situ leaching are summarised. Published, quantitative models of these processes are critically reviewed, and their potential app

    Jan 1, 1981

  • NIOSH
    IC 9035 Principal Deposits Of Strategic And Critical Minerals In Nevada

    By N. T. Lowe

    This Bureau of Mines publication presents salient deposit information in abstract form on 119 principal mineral deposits in the State of Nevada. Commodity coverage addresses 17 critical and strategic

    Jan 1, 1985

  • NIOSH
    Bulletin 234 Screen Sizing of Coal Ores and Other Minerals

    By Thomas Fraser, E. A. Holbrook

    The data in this bulletin were obtained during an investigation of screening practice by the University of Illinois engineering experiment station and the United States Bureau of Mines under a coopera

    Jan 1, 1925

  • CIM
    The North American Energy Dilemma - What Does It Mean for the Mining Industry?

    By J. M. Whiting

    "North America has entered a period when greatly increased attention must be given to energy .supply and demand by government, industry and individuals. Such increasing concern about energy will be a

    Jan 1, 1973

  • NIOSH
    OFR-151-77 The Physical And Chemical Characteristics Of Available Materials For Filling Subsurface Coal Mines

    By James R. Dunn

    Samples were taken of industrial mineral waste materials which are potentially capable of being used for filling underground coal mines for subsidence control in the Pittsburgh and the Scranton-Wilkes

    Jan 1, 1977

  • NIOSH
    OFR-178(2)-82 Mine Power Systems - Volume II

    By Lloyd A. Morley

    This eight-chapter document is the second volume of a two-volume report that presents a comprehensive outline of coal-mine electrical power systems from theory to practice. Together, the two volumes c

    Jan 1, 1982

  • NIOSH
    OFR-76(2)-79 Development Of Highwall Mining Equipment (Phase I) Volume II

    By Mandius C. Lundal

    This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner's susceptibilit

    Jan 1, 1977

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • AIME
    Mining - Mechanics of Rock Slopes

    By D. H. Trollope

    In engineering in general, close agreement between theoretical predictions and structural performance is rare—this is particularly true in rock slopes. Since the complexity of natural arrangements mak

    Jan 1, 1961

  • NIOSH
    IC 6964 Reconnaissance Of Mining Districts In Clark County, Nev. ? Introduction

    By William O. Vanderburg

    This paper 3/gives the results of a reconnaissance of mining districts in Clark County, Nev., made from November 18 to December 22, 1936, and from February 9 to March 8, 1937-in all, 63 days. While th

    Jan 1, 1937

  • NIOSH
    IC 7095 Aerial Tramways In The Metal-Mining Industry - Part 2. Construction And Operating Costs ? Introduction

    By O. H. Metzger

    This is the second of two papers dealing with the construction and use of aerial tramways in the metal-mining industry. The first paper3/described aerial tramways in a general way and discussed the en

    Jan 1, 1940

  • NIOSH
    OFR-85-75 Develop And Test Canopy Air Curtain Devices - 1 Introduction And Summary

    By William J. Krisko

    This contract final report summarizes the design, fabrication and testing of canopy air curtain devices under Bureau of Mines Contract H0232067. The canopy air curtain device is designed to reduce the

    Jan 1, 1975

  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • NIOSH
    OFR-6(5)-81 Mine Electrical Power Systems - Transients Protection, Reliability Investigation, And Safety Testing Of Mine Electrical Power Systems - Vol. V - Periodic Inspection Of Mine Electrical Power Systems

    By E. K. Stanek

    This report contains the results of an investigation into the feasibility of periodically measuring parameters of the insulation for a mine electrical power system in order to detect incipient faults.

    Jan 1, 1979

  • NIOSH
    OFR-99-75 Study Of Worker Acceptance And Attitudes Toward Mining Equipment Modifications

    By Maurice E. Bailey

    The purpose of this study is to determine worker acceptance of modified mine equipment at various intervals during a twelve month period. A survey instrument was administered to the workers by two exp

    Jan 1, 1975

  • NIOSH
    OFR-46(7)-81 Risk Analysis For Rock Slopes In Open Pit Mines - Final Technical Report - Appendices A Through M Detailed Geologic Data Underlying Developments

    By Herbert H. Einstein

    Appendices A through M contain information that is the basis for many developments reported in the main text (Parts I through V); this information is, however, not needed in applying the research resu

    Jan 1, 1979

  • SME
    Sound Transit Link Light Rail Northern Extension

    By Paul M. Godlewski, Joseph P. Gildner, David S. McAllister

    With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill

    Jan 1, 2005

  • NIOSH
    OFR-94-79 Innovative Machine Design Concepts - Conventional Loader, Auger Cutter, Ranging Head Miner, Rib Clean Up Machine

    By A. Baldwin

    Reports technical progress in designing four machines to be used in mining coal underground, applying innovative concepts at the design stage (instead of add-ons). A study phase was followed by design

    Jan 1, 1976

  • NIOSH
    Flood Prevention In Anthracite Mines, Western Middle And Southern Fields - Anthracite Region Of Pennsylvania - Project No. 2 - Summary

    By S. H. Ash

    THIS REPORT covers the second in a series of five projects into which the Conowingo tunnel system has been divided for geographical and practical reasons. It outlines the construction work contemplate

    Jan 1, 1955