Members, Junior Members, Associate Members, Student Associates - Alphabetical ListAALL, Christian H.,(M'49), Asst Res Dir Monsanto Chemical Co Anniston, Ala AALSETH, Earl P ,(J,51), Amerada Petr Corp Geological Dept Williston N Dak AAMOT, Olav Crone, (M'29), Met Pacific
Jan 1, 1952
-
Blasting Solutions For Rapid Mine ExpansionBy Stephen Mansfield, Johannes Schoeman
In August 2006 a technical alliance was formed between Orica Mining Services and Century Mine to provide blasting solutions. The alliance is in the form of a Rock to Specification (R2S™) service, one
Jan 1, 2010
-
Construcción de modelos geológicosBy Fernando Linares Quiroa
El diseño y operación de la mina es un proceso importante para la construcción de un modelo de cuerpo mineralizado. En este sentido, el presente texto describe la trascendencia del modelo geológico,
Jul 31, 2003
-
A preliminary evaluation of potential perfluoromethylcyclohexane release vessel designs for tracer gas studies in underground mines - SME Transactions 2015By K. D. Luxbacher, E. C. Jong
Perfluoromethylcyclohexane (PMCH), a member of the perfluorocarbon tracer group of compounds, has been shown to be a viable supplement to the widely used tracer gas sulfur hexafluoride (SF6). This via
Jan 1, 2015
-
Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case StudiesBy Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact
Jan 1, 2016
-
Considerations For Blending Low-Rank And High-Rank CoalsBy M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Jan 1, 1997
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Geochemical profile of till from Longlac, Ontario to Somerset IslandBy William W. Shilts
"In carrying out a geotechnical survey of a proposed gas pipeline route from the Arctic Islands south to Longlac, Ontario, the Polar Gas Consortium contracted the drilling of several hundred 2- to 2D-
Jan 1, 1980
-
Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep MineBy Leigh Sharpe
Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o
Jan 1, 1998
-
Environmental Governance - The Homestake WayBy Jack E. Thompson
I have spent my entire life in the mining industry pursuing what I believed was an honorable profession that provided products that were critical for our social and economic well being. Now I am told
Jan 1, 1997
-
Uranium In Situ Leaching: Its Advantages, Practice, Problems, And Computer SimulationBy Bill A. Hancock
In Situ leaching for the recovery of uranium from low grade sandstone deposits is one of the newest technological advances in the mineral industry. It is rapidly developing into a commercially feasibl
Jan 1, 1977
-
Synergistic Effects of the Jetti Chalcopyrite Leach Catalyst and Biooxidation—A Bioreactor Example - SME Annual Meeting 2025By Monserrat Rebolledo, John L. Uhrie, Candice Simms
Jetti Resources has developed a catalyst which overcomes the passivation of primary sulfides, enhancing the heap leach recovery of copper from chalcopyrite. It is important to emphasize that heap leac
Feb 1, 2025
-
Meeting The Requirements Of The Surface Mining Control And Reclamation Act ? IntroductionBy James R. Jones
The Surface Mining Control & Reclamation Act is a complex piece of legislation signed into law on August 3, 1977. It is the culmination of more than six years of debate by the Congress over the need f
Jan 1, 1979
-
Deep Shaft Construction in Unconsolidated Material and Water-Bearing FormationsBy Del Brock, Dan Wooton
The design/build of two adjacent vertical mine shafts in difficult ground conditions at a mining complex in the midwestern United States required innovative construction techniques. Construction of th
Jan 1, 2003
-
RI 9218 Thermal Characteristics of Energized Coal Mine Trailing CablesBy M. R. Yenchek
The Bureau of Mines conducted research to determine the relationship between cur-rent load and temperature rises in coal mine trailing cables. Six low-voltage, unshielded, portable power cables were c
Jan 1, 1988
-
OFR-78-76 Research And Development Program On The Disposal Of Retorted Oil Shale--Paraho Oil Shale Project - Phase V - Interim Report On Field Compaction Studies Using Direct Heat Retorted Shale From Semi-Works Plant - I Introduction - 1. GeneralA preliminary research and development program dated April 25, 1974, was prepared for Development Engineering, Inc. (DEI) for laboratory, field and other engineering studies on the disposal of retorte
Jan 1, 1976
-
The Rhodesian Copper DepositsBy Alan Bateman
Introduction A few years ago the name Katanga recalled, to those interested in copper, a far-off country in central Africa where deposits of huge size were beginning to pour a stream of copper into
Jan 1, 1930
-
SPOTLIGHT on the 27th Annual Hendrik van der Bijl Memorial LectureBy A. N. Brown
The Hendrik van der Bijl Memorial Lecture is arranged annually under the auspices of the Pretoria Engineers Liaison Committee. This is a multidisciplinary Committee with representatives from eleven so
Jan 1, 1989
-
Role of Applied Potentials on Bioleaching of Chalcopyrite Concentrate and Growth of Acidithiobacillus FerrooxidansBy K. A. Natarajan, Abha Kumari
"The effect of applied DC potentials on the bioleaching of a chalcopyrite concentrate in the presence of Acidithiobacillus ferrooxidans is discussed. Copper dissolution was the highest at an applied p
Jan 1, 2015
-
RI 9130 Utilization of Scrap Preheating and Substitute Slag Conditioners for Electric Arc Furnace SteelmakingBy Elger. G. W.
The Bureau of Mines investigated preheating of continuously fed, fragmented ferrous scrap charges by furnace offgases and utilizing substitutes for imported fluorspar to condition electric steelmaking
Jan 1, 1987