Machine Design Parameters For High Seam Truss Bolting ApplicationsBy G. Bucelluni
An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar
Jan 1, 1982
-
Basics on the Dimensioning and the Extraction of Shaft Safety ZonesBy Anton Sroka
The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th
Jan 1, 2005
-
Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal MinesBy Matthew J. DeMarco
Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t
Jan 1, 1993
-
Implementation and Evaluation of Roof Bolting in MICARE Mine IIBy Gustavo Herrera Rico
As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr
Jan 1, 1997
-
In-Situ Investigation Into The Causes Of Falls Of Roof In South African CollieriesBy J. Nielen van der Merwe
The main objective of the research described in the paper was to determine the causes of falls of roof in South African coal mines. The south African Colliery Manager's Association and the member
Jan 1, 2001
-
Subsidence Studies In Thick And Steep Coal Seam MiningBy M. Y. Fisekci
This paper concentrates on subsidence measurements, applied over the thick and steep seam mining in the Rocky Mountains Region of Western Canada. The studies to date indicate that two new subsidence m
Jan 1, 1981
-
Critical Appraisal Of Pillar Design As Required By Coal Mines Regulations Of India VIS-VIS Latest Rock Mechanics FormulaeBy S. K. Sharma
The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae, Equivalent material modelling was the approach
Jan 1, 1992
-
Some Technical Considerations When Mining Under Bodies Of WaterBy John W. Fredland
Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun
Jan 1, 1982
-
Determination Of Basis For The Double Use Of Rectangular Rockbolted Roadways In The D/C Seam At The Auguste Victoria MineBy Karl H. Brandt
In the Auguste Victoria mine a bolted rectangular roadway has been kept open for the first time in the seam D/C after retreat. The target of the project was to gain a basis for planning and experie
Jan 1, 2001
-
Longwall Surface Subsidence Prediction Through Numerical ModellingBy Noor Mohammad
Comprehensive numerical modelling of the subsidence associated with longwall mining in UK Coal Measures strata has been conducted and validated against UK data. The Rock Mass Classification System (RM
Jan 1, 1997
-
Applications Of Reflection Seismics To Mapping Coal Seam Structure And DiscontinuitiesBy T. L. Dobecki
As a means of demonstrating the effectiveness of reflection seismology in determining continuity of coal seams, three U. S. field projects are reviewed. The three projects involve coals of varied thic
Jan 1, 1981
-
Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall MineBy Kevin MacPherson
After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache
Jan 1, 1999
-
Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)By S. I. Al-Ameen
Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes
Jan 1, 1992
-
Subsidence Prediction Influence Assessment and Damage ControlBy Y. Luo
An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t
Jan 1, 1997
-
The Formation And Effects Of Transient Abutment Stress During Nonuniform Face AdvanceBy George J. Karabin
Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room
Jan 1, 1982
-
A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West VirginiaBy Paul L. Tyrna
The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa
Jan 1, 2001
-
Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected ExamplesBy Axel Preusse
To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem
Jan 1, 2000
-
Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)By Pier Paolo Manca
The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T
Jan 1, 1999
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine
Jan 1, 1998
-
Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NMBy P. E. Christensen
Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f
Jan 1, 1998