Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A New Rockbolt Axial Load Measuring Device

    By Hani Mitri

    A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a

    Jan 1, 2001

  • SME-ICGCM
    The Use of Pneumatic Stowing in Germany Considering Subsidence Aspects

    By Axel Preusse

    Stowing or waste fill is common in the German mining industry since the beginning of mining activities, With increasing mechanization, flat and gently inclined seams (0 -- 18) were mined. These mines

    Jan 1, 2002

  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    A Simple Finite Element Model For Predicting The Behaviour Of Hydraulically Powered Coalmine Supports

    By Brian G. D. Smart

    A scheme is presented whereby the complexities of design and operation of a hydraulically powered coalmine support are modelled using the finite element method. This enables predictions to be made of

    Jan 1, 1992

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    Effect of the Approaching Longwall Faces on Barrier and Entry Stability

    By Klaus-Dieter Beck

    RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred

    Jan 1, 2004

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    Analysis Of The Seam Inclination Effect On Roof Stability

    By Hanjie Chen

    Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a

    Jan 1, 2000

  • SME-ICGCM
    Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M

    By Klaus Opolony

    The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p

    Jan 1, 2002

  • SME-ICGCM
    Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground Mines

    By Lorraine Kent

    Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var

    Jan 1, 2002

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Field Testing of the Fully Grouted Thrust Tensioned Bolts

    By Kot Unrug

    Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati

    Jan 1, 2002

  • SME-ICGCM
    Ground Control In Multiple Seam Mining

    By Robert A. Stansbury

    The No. 14 Mine of United States Steel Corp- oration is located at Munson, West Virginia, in &Dowell County. The mine was originally assigned 7,530 acres of Pocahontas 3, 4 and 5 Seams. Production beg

    Jan 1, 1981

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope Entries

    By John Stankus

    Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans

    Jan 1, 2011

  • SME-ICGCM
    The Response Of Massive Structures Inferred From Tidal Tilt Monitoring (a922d488-04e7-4665-bcdd-a85115c8db5e)

    At any given lime, the tidal force subjects massive regions to a spatially uniform load. The deformation of any large structure due to these forces is proportional to the elastic properties of the str

    Jan 1, 1992

  • SME-ICGCM
    Weak Claystone Floors And Their Implications To Pillar Design And Settlement (e297de16-ba6b-46bd-8383-22a15beca7b5)

    By Ross W. Seedsman

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The instrume

    Jan 1, 1992