Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Adsorption Of Heavy Metal Ions On Manganese Oxide-Coated MediaBy Ping K. Di
A naturally aged and synthesized manganese oxide-coated granular media was found in our laboratory to have the capability of the removal of soluble Mn(H) from mine drainage by adsorption and oxidation
Jan 1, 1995
-
SHORT-TERM PLANNING OF OPEN PIT MINES WITH SEMI-MOBILE IN-PIT CRUSHER - SME Annual Meeting 2023By E. Ben-Awuah, H. Askari-Nasab, N. Al Habib
Open pit mines are getting deeper with time and transportation expenses are increasing because of the increasing haulage distance. In-pit crushing and conveying (IPCC) is getting popular in deeper ope
Feb 1, 2023
-
Geology Of The San Luis Gold Deposit New Developments, Costilla County, ColoradoBy R. G. Benson
The San Luis deposit of Costilla county, Colorado contained 11,021,000 tonnes (12,149,000 tons) of ore at 1.4 g/t (0.040 oz/st) gold in two minable zones. Gold mineralization is associated with silici
Jan 1, 1994
-
Quantitative correlation of production and seismic response at PTFI Grasberg DMLZ and GBC block caves - RASIM 2022By Wieda Azani, Alexander Tarigan, Willem de Beer
In block caving, the rates and sequencing of undercut production blasting, drawbell blasting, and mucking are the key levers for attempting to manage cave performance. Cave performance encompasses a r
Apr 26, 2022
-
Sulpher Markets and Sulpher Recovery at Falconbridge, OntarioBy C. F. Johnson
Nearly all of the sulphur produced in the world today is converted to sulphuric acid and 49 % is used in the manufacture of fertilizers. In the last few years we have seen the beginning of another cha
Jan 1, 1972
-
Block Cave Production Scheduling Using PCBCBy T. Diering
Gemcom PCBCTM is a software package which has been developed over the last 22 years for the planning and scheduling of block cave mines. This paper presents an update of the various research and devel
Jan 1, 2010
-
Value Addition to Ilmenite Using Carbonized Waste Coconut Shells: a Mechanochemical Approach Aided with Powdered Seashells as a Rate Raiser - Mining, Metallurgy & Exploration (2021)By Amila Sandaruwan Ratnayake, T. Dilmi. U. Wijewardhana, H. C. S. Subasinghe
The value addition potential of ilmenite was examined using several characterization techniques. Raw ilmenite is composed of 93.65 wt.% of FeOTiO2, 3.55 wt.% of SiO2, 1.22 wt.% of Al2O3, and the remai
Mar 29, 2021
-
Deposition Rates Of Coal Dust In Mine AirwaysBy R. Bhaskar
An airborne dust cloud is an ensemble of particles of varied size, density, shape and states of aggregation. An understanding and quantifying of the dispersion and deposition of the dust generated in
Jan 1, 1990
-
Successes And Failure Of VCR Mining At HomestakeBy J. C. Haptonstall
Stoping methods at the Homestake Gold Mine through 1978 had been traditional overhand cut-and-fill, shrinkage or square set. High costs, low-productivity and safety concerns prompted the mine to searc
Jan 1, 1986
-
Precious MetalsBy Nathaniel Herz, R. J. Adamson, C. M. Romanowitz, Frank W. Jr. McQuiston, C. D. Hoyt, Robert S. Shoemaker, P. H. O’Neil
1. INTRODUCTION In this section, precious metals are defined as gold, silver, and the platinum group metals comprised of platinum, palladium, iridium, osmium, and rhodium. If the first three years
Jan 1, 1985
-
Selection Of Agglomeration Process Variables For Increasing The Ltd And Reducibility Of A Magnetite-Based Acid Pellet (b945a117-88cd-4d43-a242-36e4f511aaa3)By Madhu G. Ranade
A statistically designed pot grate- kiln test program was conducted to determine the agglomeration process variables necessary for increasing the low temperature disintegration resistance (LTD) and re
Jan 1, 1985
-
Ground Treatment for Risk Mitigation during Tunnelling at the Port of MiamiBy Roger Storry, Donald Bruce, Arnaud Hochart
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
Refractory Gold Concentrate Pretreatment By Alkaline Sulfide Leaching And Nitrogen Species Catalyzed Pressure OxidationBy C. G. Anderson
The treatment of materials for the recovery of the precious metals imposes many processing and environmental challenges. Sunshine Mining and Refining Company has developed hydrometallurgical technolog
Jan 1, 1996
-
Bituminous Coal Consumption Estimating Its Long Term Growth And Annual Variation ? IntroductionBy W. Gibson Jaworek
It has become apparent in recent years to everyone intimately concerned with the future of the American fuels industries that the growth in demand for energy has become a topic receiving considerable
Jan 1, 1960
-
Development of an equation describing signature waveform based on the Fourier series for blast vibration prediction - SME Transactions 2012By B. T. Lusk, J. J. Silva Castro
Currently, there are several methodologies to assess ground vibrations from blasting. Of all available methodologies, one that is becoming more important is the waveform superposition or signature hol
Jan 1, 2012
-
Coal Division - Underground Coal Mine Design and Planning ? Estimating Mine Pillar Strength From Compression TestsBy Louis A. Panek
Using an approach based on the theory of similitude, the author develops a general equation and related concepts that provide new insights to an old problem. The load-bearing capacity (strength) of a
Jan 1, 1979
-
The Globe Hill Breccia-Hosted Gold Deposit, Cripple Creek District, Colorado - IntroductionBy A. D. Trippel
The Cripple Creek Mining district is located in Teller County, Colorado, 30 km west of Colorado Springs and 9 km southwest of Pikes Peak (Fig. 1). Since its discovery in 1891, the district has produce
Jan 1, 1986
-
Early Contractor Involvement and Observational Method Supported with Artificial Intelligence for Equitable Risk Management - NAT2024By David J. Hatem, K. Bhattarai
Effective risk management in major subsurface projects involves ways to mitigate adverse impacts to final design and construction approaches due to changed subsurface conditions. An Early Contractor I
Jun 23, 2024
-
P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024By Jerry Luttman, Mark Dubay, Anvesha Dogra, Elizabeth Dwyre, Wei Hu
The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes desi
Jun 23, 2024
-
Open Pit Production Planning Through Pit-Generation And Pit-Sequencing (9f1bec4e-18ef-4677-bf91-9c98a79e9b13)In this paper, the logic and the capabilities of a long term production planning method for open pit mining are presented. The method is the first attempt in obtaining simultaneous solutions to the fo
Jan 1, 1993