Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reliability of the Non‑linear Modeling in Predicting the Size Distribution of the Grinding Products Under Different Operating Conditions - Mining, Metallurgy & Exploration (2023)By Konstantinos Komnitsas, Evangelos Petrakis, Emmanouil Varouchakis
During the modeling of grinding systems, population balance modeling (PBM) which considers a constant breakage rate has been widely used over the past years. However, in some cases, PBM exhibited some
Jun 24, 2023
-
The Effect Of CO2 Sparging On The Flocculation And Filtration Rate Of Concentrated Hematite SlurriesBy H. Haselhuhn
Filtration of hematite ore slurries can be a bottleneck in some hematite processing plants due to inadequate filtration rates caused by the dispersion of fine particles. Flocculation of fine particles
Jan 1, 2012
-
Technology News – Boxhole Borer Has Safety, Operational and Cost AdvantagesA machine that improves safety during the cutting of boxholes (ore-passes) and travelways in underground mining operations has delivered impressive results in trials conducted at a South African plati
Jan 1, 2006
-
The Financing Of Mass Transit In The United StatesBy Charles A. Gargano
The current state of the mass transit industry in America will be examined. How and why this important urban activity shifted entirely, or almost entirely, from the private sector to the public sector
Jan 1, 1983
-
Mountain States Employers Council Projects Mining Pay Increases at 3.9% in 1990By Joy Sandberg
The 1989 mining industry compensation survey done annually by the Denver-based Mountain States Employers Council shows the "average" or "typical" employee in the mining industry is projected to receiv
Jan 1, 1990
-
User Friendly Finite Element Design Of Shafts And TunnelsBy William G. Pariseau, Mark K. Larson, Heather E. Lawson
Rational design based on engineering fundamentals is essential for the layout of safe, stable shafts and tunnels. Shafts and tunnels including winzes, raises, adits, and crosscuts are lifelines to the
-
Projecting Copper Extractions And Shut-Down Criteria For Column TestingBy E. Iasillo, R. R. Carneiro
Independent of the method chosen to forecast production, an accurate method to project metal extraction is needed in order to accommodate leach cycles that exceed leach data on hand and thus be able t
Jan 1, 2001
-
Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\By Massimo Concilia, Remo Grandori, Paolo Nardone
Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excav
Jan 1, 2001
-
Leadership Versus Management: Observations On The Successes And Failures Of Cost Reduction ProgramsBy B. Cavender
Mining managers trying to rapidly reduce production costs tend to implement a traditional set of top-down managerial practices: layoffs of employees, renegotiation of supplier contracts, cancellation
Jan 1, 2000
-
Application of the Ground Response Curve for Understanding the Overburden Load Transfer MechanismBy Ihsan Berk Tulu, Ted Klemetti, Deniz Tuncay, Cicek Sena, Zhao Haochen
"Analysis of Longwall Pillar Stability (ALPS) and Analysis of Retreat Mine Pillar Stability (ARMPS) treat the pillar as a passive structure that is designed to carry overburden dead-weight. This dead-
Jan 1, 2019
-
Modeling Chalcocite LeachingBy S. Dixon
The Phelps Dodge - PD/PERI Heap2D Model is a phenomenological stockpile leaching model that has been used to investigate the best operating practices for leaching chalcocite. The model was used to in
Jan 1, 2006
-
Mining In Minnesota: Balancing Environmental Protection And Economic Development (93c1efa5-9836-488f-b32e-e83ac099d4e8)By W. C. Brice
A cooperative study was undertaken by representatives of the environmental community, the mining industry, and state government to identify and resolve environmental issues associated with base and pr
Jan 1, 1990
-
Underground Mining: A Challenge to Established Open-Pit OperationsBy Timothy D. Arnold
Barrick Gold’s Bullfrog underground mine, near Beatty, NV, was established as an after-thought to the main open pit. As open pit ore dwindles, the underground mining became increasingly more importan
Jan 1, 1996
-
Long-Range Planning Commission - Report of the Educational Activities CommitteeBy Thomas V. Falkie, Howard L. Hartman, Bruce R. Palmer, Donald W. Gentry, John E. Frost, Peter T. Luckie, Michael K. McCarter, Lee W. Saperstein
Education in the mineral engineering professions is in the same flux and turmoil as is the entire minerals industry. Overcapacity in some areas, undercapacity in others, and the constant fear of subst
Jan 6, 1984
-
Problems With Appraising Electric Utility Assets After Deregulation (9b7f9b1b-6191-4f06-b182-7adc8e5b7333)By J. Kern, M. Cain, T. Torries
Until recently, the generation of electricity was regulated in all states and the value of generation assets in a regulatory environment for ad valorem taxation were based largely on the book value of
Jan 1, 2001
-
Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling SystemsBy H. Sevim
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to
Jan 1, 1996
-
Discovery and Geology of the Turquoise Ridge Gold DepositBy E. J. Berentsen
The Turquoise Ridge gold deposit is located near the Getchell Mine, 72 km (42 miles)northeast of Winnemucca, NV (Fig. 1). The deposit is owned by Getchell Gold Corp. The host rocks consist of Ordovic
Jan 1, 1996
-
Case studies illustrate the need for a new concept of coal pillar designBy Syd S. Peng
Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust
Jan 11, 1986
-
Discussion - New look at underground coal mine safetyBy E. M. Spokes
A.B. Rushton The work and resulting publications of the Committee on Underground Coal Mine Safety and The President's Commission on Coal were appropriate at the time of publication. The statis
Jan 6, 1986
-
A Second Case Study of Field Test Results for Comparison of Roof Bolter Dry Collection System with Wet Collection SystemBy G. Roberts, S. S. Klima, W. R. Reed, J. Deluzio, G. Ross, A. Mazzella
The abstract discusses the problem of silicosis among roof bolter operators in coal mines due to respirable quartz dust (RCS) exposure. It presents a study comparing a new wet box collection system to
May 11, 2022