Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Soft Ground Tunnelling On Staten Island

    By Christopher P. White, John R. Wagner

    This paper will discuss the complex and difficult soil conditions encountered in the sinking of 15 shafts of 18m to 27m depth and the excavation and lining of 6700m of 2.74m dia. interceptor sewer on

    Jan 1, 1991

  • SME
    Optimal Choice of the Parameters for Ventilation and Methane Drainage in a Longwall Face with Caving

    By Stanislaw Nawrat, Waclaw Dziurzynski

    An increasing concentration of coal production, especially in the circumstances of intensive methane inflow makes the coal mine managing staff apply new techniques of safe mining. It paves also the wa

    Jan 1, 1995

  • SME
    Centrifuge Physical Modeling of Paste Fill Sillmats

    By Euler De Souza, Jason Chew, Aldrich Philip Dirige

    Sillmats are structural elements upon which the safety and economics of underfill mining or sill pillar recovery in stopes of moderate width with steeply dipping ore zones, depend. The traditional sta

    Jan 1, 2001

  • SME
    New mine climate simulation algorithm applied to the sensitivity of selected input parameters

    By M. J. McPherson, P. Mousset-Jones, G. Danko

    Ventilation and refrigeration fortune climate modification contributes significantly to the operating costs of a deep hot mine. Mine climate simulation programs can he used to minimize the impact of t

    Jan 1, 1987

  • SME
    Effect Of Roof-Bolting Parameters On The Stability Of An Opening In A Frozen Ground Placer Mine

    The stability of mine roofs in permafrost zones is determined mainly by temperature and ice content. The deformation resulting from creep and temperature-dependent physical properties of frozen rock m

    Jan 1, 1997

  • SME
    The Effect Of Time-Dependent Properties Of Altered Rock On Tunnel Support Requirements

    By A. J. Hendron, G. Mesri, R. M. Semple

    Squeezing ground conditions in hard-rock tunneling are associated with fault zones containing brecciated rock and gouge. Gouge is a stiff clay-like soil that exhibits a propensity to creep. The ground

    Jan 1, 1974

  • SME
    A Geostatistical Study Of Lignite Spatial Variations In The Multilayer Deposit Of The Amyndeo Mine In Northern Greece

    By A. Pavlides

    The purpose of this work is to conduct a preliminary analysis of the spatial variations of the thickness of lignite layers in the area of the Amyndeo mine, and to estimate the lignite reserves of the

    Jan 1, 2007

  • SME
    A Flexible Expert System to Assist Choice of Countermeasures for Prevention of Emergency in Underground Coal Mine

    By Yuusaku Tominaga

    A flexible expert system for a personal computer has been developed to take countermeasures for prevention of emergency in underground coal mines. The system makes a diagram to estimate maximum airflo

    Jan 1, 1992

  • SME
    Metal Recovery Aids In Heap Leaching Appucations

    By James H. Nulty, Joseph S. Roti

    Wetting agents used for heap leach gold applications would appear to have technical merit in aiding in recovering higher levels of precious metal. Many questions, however, remain as to whether they wi

    Jan 1, 1998

  • SME
    Shafts And Tunnels: Damen Avenue To Roosevelt Road

    By William C. Paschen

    Damen Avenue to Roosevelt Road, the Tunnel and Reservoir Plan (TARP), a Deep Tunnel Project for the Metropolitan Sanitary District of Greater Chicago consists of 25,189 lin. ft. of 32 ft. tunnel with

    Jan 1, 1979

  • SME
    Update of the Support Technology Optimization Program: New Features and a New Interface

    By T. M. Barczak, Zach Agioutantis

    The Support Technology Optimization Program (STOP) has been developed by the National Institute of Occupational Safety and Health (NIOSH) to provide a comprehensive tool for evaluating the performanc

    Jun 25, 2024

  • SME
    Turning Crosscuts With Remote Control Continuous Miners -Improving Safety

    By Michael Gauna, William J. Gray, Joseph C. Zelanko

    Mechanized mining in the underground coal industry has continued to evolve since the introduction of the remote control mining machine. Remote control continuous mining machines without an onboard ope

    Jan 1, 2005

  • SME
    Ground Support Prediction Model RSR Concept

    By Henry R. Tiedemann, Eugene H. Skinner, George E. Wickham

    Improving the state-of-the-art of tunneling is a continuing challenge to those involved in underground construction. New methods and procedures are usually evolved over a relatively long period of tim

    Jan 1, 1974

  • SME
    The Development Of A Total Maintenance System

    By Joseph W. Kupfner

    It is a recognized fact that a good maintenance program is a pre-requisite for minimum delay costs and maximum availability of equipment. To develop such a program and to make it effective, one must e

    Jan 1, 1986

  • SME
    Ventilation Of An Underground Testing Facility In Salt (5ff6f90b-f560-41cb-9026-760af7f90788)

    By W. S. Sadik

    This paper presents the ventilation design for an underground testing facility in a salt medium. The underground workings consist of two-12 ft. (3.66 m) diameter watertight shafts and approximately 60

    Jan 1, 1988

  • SME
    Adsorption and Conformation of Polysaccharide Depressants on Minerals

    By P. Somasundaran, D. R. Nagaraj, Jing Wang

    Polysaccharides have been widely used as depressants in mineral processing for decades. They constituent one of the most abundant family of biopolymers. However, only a small number of them have been

    Jan 1, 2005

  • SME
    Implications Of Rock Mechanics To Carr Fork Project Mine Design

    By J. J. Krizek, A. H. Ditto

    INTRODUCTION The Carr Fork property is situated in the Bingham Mining District located on the east slope of the Oquirrh Mountain range in Utah. The mine is adjacent to and lies west of Kennecott&ap

    Jan 1, 1977

  • SME
    Nast Tunnel Excavation History

    By Dewey W. Geary

    Nast Tunnel is the first granitic rock tunnel to be excavated by a machine for the U. S. Bureau of Reclamation. The machine has excavated 7500 ft of the tunnel at this writing. There have been a few g

    Jan 1, 1997

  • SME
    Discussion - Lime substitutes for the treatment of acid mine drainage - by G.W. Heunisch Technical Papers, MINING ENGINEERING, Vol. 39, No. 1 January 1987, pp. 99-96

    By L. B. Anderson, G. A. Carmody

    We wish to comment on the paper by G.W. Heunisch (MINING ENGINEERING, January 1987), which raised several important points regarding treatment of acidic waste waters. This paper confirms, in part, tes

    Jan 1, 1988

  • SME
    Temporary Tunnel Support By Precast Segments

    By Werner A. Ruemmele, Steven R. Wardwell

    INTRODUCTION The first phase of the Los Angeles Metro Rail Project consists of 7.1 km (4.4 miles) of subway and stations running through downtown Los Angeles from Union Station to MacArthur Park. S

    Jan 1, 1989