    Caterpillar With Tunnel Boom Boosts Productivity On Swiss Project

    A dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the

    Jan 1, 2009

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • SME
    Using CO2 Fracturing to Weaken Roofs During the Initial Phase of Longwall Coal Mining - Mining, Metallurgy & Exploration (2023)

    By Yunxing Cao, Xinsheng Zhang, Bingbing Meng, Shuaifang Guo, Li Wang, Junsheng Zhang

    During the initial process of mining a longwall working face, it is often found that the roof will not collapse readily, which increases the risk of later roof collapse disasters. Explosive and hydrau

    Nov 23, 2023

  • SME
    The Structure And Characteristics Of Adsorbed Surfactants As Revealed By AFM Imagery

    By V. K. Paruchuri, J. D. Miller, J. Nalaskowski

    The phenomenon of surfactant adsorption at mineral surfaces is of significant importance in many particulate processes ranging from mineral flotation and enhanced oil recovery to pharmaceutics, paint

    Jan 1, 2001

  • SME
    Model And Experimental Study Of The Effect Of Impeller Rotational Speed On The Flotation Rate From A Small-Scale Flotation Cell - Implications For The Effect Of Bubble Velocity

    A series of flotation experiments were carried out in a 2.25-dm3 laboratory-scale Rushton turbine cell using hydrophobic quartz particles. Flotation was performed at a constant mean bubble diameter ov

    Jan 1, 2007

  • SME
    Modeling Metal Ion Removal In Alkylsulfate Ion Flotation Systems (d6f5ac24-85e9-412a-bdb7-096496820a4d)

    By F. M. Doyle

    Metal removal kinetics and metal ion selectivity in ion flotation were studied from a thermodynamic perspective. Surface tension data could be used with the Gibbs adsorption equation to quantitativel

    Jan 1, 2000

  • SME
    Cathodoluminescence (Cl) Microscopy Application To Refractories And Slags

    By R. E. Moore

    Refractories are unique ceramic materials, which are used in large quantities in steel making furnaces, metal smelting vessels, and glass melting tanks. They are required to possess high thermal shock

    Jan 1, 2001

  • SME
    Coal Surface Mine Reclamation Pacific Coast Utilities Objectives & Practices The Centralia Project

    By McCarthy. Richard E.

    The prime movers of the Centralia Project, the surface coal mine and the power plant, private utilities are very aware of public attitudes. They have established and maintain the reputation for leader

    Jan 1, 1971

  • SME
    Mine Stope Coverage Cuts Acid Mine Drainage

    By Joseph J. Feiler

    Historical mining operations in Colorado and other western states have resulted in thousands of remnant mine openings. Many are sources of metals loading and acid water generation in surface and grou

    Jan 1, 2006

  • SME
    Advances In The Practical Implementation Of Indicator Geostatistics

    By Clayton V. Deutsch

    Indicator Kriging (IK) is being commonly applied to mineral resource assessment problems. More recently, indicator simulation has also been used for sensitivity analysis and difficult change of suppor

    Jan 1, 1992

  • SME
    Real Time Integration Of Mining And Metallurgical Information For Efficient Use Of Energy And Water - Preprint 09-133

    By O. A. Bascur

    The lack of integration of mining and metallurgical information with sufficient detail for analysis causes inefficient operation and hence sub-optimal energy and water use. It is difficult to analyze

    Jan 1, 2009

  • SME
    Roadheader Performance On The Caldecott 4th Bore Tunnel

    By D. Kwietnewski

    The 4th bore of the Caldecott Tunnel is a 50-ft horseshoe shaped highway tunnel located in the hills east of Oakland, California. Tunnel excavation was mostly completed using one of the world?s large

    Feb 27, 2013

  • SME
    Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, Turkey

    By S. Yerel

    In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule

    Jan 1, 2007

  • SME
    Critical Considerations in Robotic Seabed Drilling

    By Steve Stuart

    Deep-sea mineral SMS deposits present some of the world’s most challenging conditions for drilling equipment. As robotic seabed drilling services mature so too the ways that clients engage with servic

    Sep 1, 2014

  • SME
    Statistical Evaluation Of The Effect Of Conditioning Time And Slurry Concentration On The Flotation Performance Of Siliceous Phosphate

    By S. Al-Thyabat

    Conditioning of flotation feed is an important prerequisite for efficient flotation. This process depends on parameters such as conditioning time, slurry concentration and slurry pH. The objective of

    Jan 1, 2008

  • SME
    Effect Of Longwall Face Advance On Spontaneous Heating In Longwall Gob Area - Preprint 09-053

    By L. Yuan

    To reduce fire hazards from spontaneous combustion of coal in longwall gob areas, a series of computational fluid dynamics (CFD) simulations were conducted by National Institute for Occupational Safet

    Jan 1, 2009

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • SME
    Technology News – Atlas Copco Introduces Hydraulic Breaker

    The HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn

    Jan 1, 2006

  • SME
    An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal Mine

    By Yoginder P.

    ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study

    Jan 1, 1986

  • SME
    Excavating New York?s East Side Access Project

    By Desiree Willis

    One of New York City?s largest subway projects is under way 43 m (140 ft) beneath the surface of downtown Manhattan. The East Side Access project, more than 30 years in the making, was halted after a