Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • DFI
    The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? Synopsis

    By M. Tominaga

    An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco

    Jan 1, 2010

  • DFI
    CPT - Guided Installation Of Pressure-Grouted Displacement Piles

    By Mark M. Petersen

    As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven

    Jan 1, 2002

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous Sands

    By James A. Schneider

    The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si

    Jan 1, 2006

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Eglinton Crosstown, a New Step in Toronto’s Subway System

    By Lars Richter, Franz-Werner Gerressen

    "The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation

    Jan 1, 2017

  • DFI
    Secant Pile Walls - Design, Construction And Case History

    By Ketan H. Trivedi

    This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install

    Jan 1, 2006

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation

    By David C. Kraft

    A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki

    Jan 1, 2003

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods

    By Derrick D. Dasenbrock

    Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,

    Jan 1, 2006

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014