Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Drilled Shaft Load Testing Program for Design of Foundations for an Automated People Mover

    By Samer Rabab’ah, John C. Niedzielski, Jason Valeria

    The PHX Sky Train is an automated people mover system located at Phoenix Sky Harbor International Airport. Phase II of the PHX Sky Train includes the design of over 150 drilled shafts for support of f

    Jan 1, 2019

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • DFI
    Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)

    By John D. Nelson

    Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot

    Aug 1, 2013

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017

  • DFI
    Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier

    By A. David Miller, Douglas M. Barber

    "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust

    Jan 1, 2015

  • DFI
    Liner Piles Used As Support To Kentledge For Initial Compression Load Test

    By Venugopal B, M Kumaran, Thomas John, Vetriselvan A

    The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t

    Nov 1, 2022

  • DFI
    RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And Performance

    By Matthew Janes

    The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A

    Jan 1, 2006

  • DFI
    Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches

    By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu

    "Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b

    Jan 1, 2016

  • DFI
    Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations

    By Ryan Weaver, Travis Coleman

    The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b

    Jan 1, 2019

  • DFI
    Simulation of Soil Plug Effects in Open Steel Pipe Piles Considering the Complex Soil-Structure-Interaction during Installation

    By Johannes Labenski, Christian Moormann, Johannes Aschrafi

    "Open steel pipe piles are used for various applications in costal engineering, port structures and increasingly important for offshore structures. During the installation of open steel pipe piles the

    Jan 1, 2017

  • DFI
    Micropiled Foundations of Telecommunication Towers

    By Racquel Nottingham, Marc Mastrantuono, Freddy Lopez

    In the digital era that we live in, connectivity and mobility play a decisive role in our daily activities. In this context, insufficient telecommunication infrastructure gives origin to the so called

    Sep 8, 2021

  • DFI
    Water Powered Percussive Downhole Hammers – Energy Savings And Productivity

    By Shyam Chengalath, Johan Jeansson, Magnus Hörman

    Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm

    Sep 1, 2022

  • DFI
    Westlink Projects – Geotechnical Challenges During The Execution Phase

    By Robert Thurner, Albin Norrman, Sami U. Raja

    The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s

    May 1, 2022

  • DFI
    High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USA

    By Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka

    "The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine

    Jan 1, 2017

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    The Use of Rigid Inclusions to Support Large Spans

    By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic

    Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr

    Jan 1, 2019

  • DFI
    Complex Deep Foundation System for Tall Tower in New York City

    By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f

    Jan 1, 2017

  • DFI
    Evaluation And Testing Of Distressed Pile Foundations Supporting Oil Storage Tanks

    By Michael W. Oakland

    Weidlinger Associates was retained to evaluate the foundations supporting ten oil storage tanks at a tank farm on the east coast. The tanks were constructed over the site of a landfill which was unde

    Jan 1, 2009