Interpretation of Seismic Response Data from Full Scale Helical Pile TestsBy A. B. Cerato, M. K. ElSawy, A. Elgamal
"Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru
Jan 1, 2017
-
Session 23 "Grout in Rock and Mining"By John Davie
We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is
Feb 10, 2003
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009
-
The Nonlinear Constitutive Behaviour of Coode Island SiltBy Rae Mackay, Kaveh Ranjbar Pouya, Ali Tolooiyan
"A major part of Melbourne’s central business district is underlain by a very soft silty clay deposit known as Coode Island Silt (CIS). Due to the low strength of CIS, most construction in the region
Jan 1, 1900
-
Current State of Practice of Corrosion Protection in Europe with Hollow Bars - Comparison to Methods Being used in North AmericaBy Alice Y. Tseng, Dan MacLean
"Corrosion protection of all deep foundation systems made of steel is THE issue when considering durability of the element in the long term. Protecting steel from corrosion and maintaining the steel t
Jan 1, 2017
-
Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning EnvironmentBy Waddah Akili
This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well TechnologyBy Paul Suver
The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Evaluation Of Pile Load Test ResultsBy Rasin Duzceer
In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed
Jan 1, 2002
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Army Corps Megaprojects: The Benefits of Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This article focuses on lessons learned from innovative designs including in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers (USACE)
Jan 1, 2016
-
Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, MissouriBy Adrian M. Keller
Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer
Jan 1, 2010
-
New Pile for Reduced Underwater NoiseBy Dardis J. T. II, P. G. Reinhall
"Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n
Jan 1, 2017
-
Vibrations Caused by Pile DrivingBy K. Rainer Massarsch
"Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can
Jan 1, 2004
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - SynopsisBy George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000