Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modelling of the Gold Mineral Associations and Size Distribution of a Grinding Mill ProductBy M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin
Batch grinding tests conducted on a gold ore indicated that gold is not randomly distributed within the size fractions of the ground ore. Since gold leaching performances were found to be dependent of
Jan 1, 2011
-
Back To Basics - The Road to Recovery: Milling Practice at Brunswick MiningBy R. J. Grant, D. W. Scott, M. A. Cooper, E. R. Shannon
"The Brunswick No.12 site concentrator processes 10,500 tonnes per day of a complex lead, zinc, copper and silver ore producing four concentrates by differential flotation. Research over the years has
Jan 1, 1993
-
Flowsheets of the FutureBy Marko Lampi, Ross Andrews, Jouni Pihlasalo, Robert Matusewicz
With widespread discussion on reducing carbon, sulphur and other emissions, use of sustainable energy sources and the pivotal circular economy theme, consideration needs to be given to pyrometallurgic
Jan 1, 2019
-
Characterization of Solid Phases in the Iron-Sulfate-Water System Where Silver is PresentBy D. B. Dreisinger, A. A. Gunaratnam
A pressure oxidation (POX)-hot cure (HC)-lime boil (LB) process is used in industry to recover silver from refractory gold sulfide ores containing minerals such as pyrite and arsenopyrite. Pressure ox
Jan 1, 2017
-
Geophysics Applied to the Exploration and Development of Copper and Molybdenum Deposits In British ColumbiaBy David K. Fountain
"The growth of the mining industry in British Columbia in the last ten years has been largely the result of the development of large low-grade copper and molybdenum deposits. There are two problems wh
Jan 1, 1968
-
Characterization and Electrorefining of a Copper Anode with High Lead, Arsenic and BismuthBy M. S. Moats, C. M. Campbell
Samples of a high impurity (90.05 wt. % Cu, 4076 ppm Pb, 1939 ppm As and 635 ppm Bi) commercial copper anode were characterized and then electrorefined in a laboratory scale cell. Anode inclusions wer
Jan 1, 2019
-
The Flash Recycle System for the Cooling of Autoclaves Process Design and OperationBy F. Crundwell, N. Steenekamp
"The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle
Jan 1, 2012
-
Copper and Cadmium Removal from Zinc Sulphate SolutionBy R. G. Helberg, S. M. Rebelo
"Copper and cadmium are removed from the zinc sulphate solution in primary purification by cementation reaction followed by filtration. The solids are sent to the cake leach section where zinc and cad
Jan 1, 2012
-
Energy Management Assessments: Cost Effective Carbon ManagementBy A. Taylor, E. Thorn Corthay, J. Farrell, L. A. Westfall, S. Borchardt
Mining and metallurgical industries need to minimize their greenhouse gas (GHG) emissions; Hatch specializes in conducting mining and metallurgical energy management assessments and optimizing product
Jan 1, 2010
-
Resource Expansion at the Renard Diamond Project, QuébecBy Matt Manson
Renard?1-10 kimberlite pipes and ?Lynx-Hibou?kimberlite dyke system within ?Foxtrot?property 50/50 JV with SOQUEM, Stornoway operator 2001: Discovery of the Renard kimberlite pipes 2003: Discovery
May 1, 2010
-
A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution CircuitBy J. A. Drozdiak
In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or
Jan 1, 2012
-
Preparation of Pure Zirconyl Compounds from Zircon Caustic FritBy Hyung Sup Choi
The preparation of high-purity zirconyl compounds was studied in order to develop an economical process for obtaining pure zirconium via the caustic fritting of zircon sand. The direct dissolution of
Jan 1, 1965
-
Pinchi Lake Mercury Reduction PlantBy R. Bainbridge
THE cinnabar deposits of the Consolidated Mining and Smelting Company's Pinchi Lake property, situated near Fort St. James, B.C., were discovered and reported on by a Dominion Government geologic
Jan 1, 1945
-
The founding of the Canadian zinc industryBy J. E. Dutrizac
Canada is currently the world's largest supplier of zinc concentrates and is also a major producer of zinc metal. This dominant position in the world's zinc market is a fairly recent circums
Jan 1, 1999
-
Plant Layout and LogisticsBy Jeffrey T. McGinty, Frank M. Wheeler
Plant layout is the arrangement of equipment, process areas, departments, infrastructure, and support facilities. Plant logistics is the flow of parts, people, resources, and information throughout th
Jan 1, 2015
-
Sulphide Precipitation and Ion Exchange Technologies for Cost Effective Removal of Selected Metals in WastewaterBy A. Consigny
New "clean technologies" to treat mining and metallurgical effluents containing dissolved metals have been successfully applied at mine sites in North America and Asia, treating water flows up to 24,0
Jan 1, 2011
-
Enabling Progressive Energy Management Practice in Minerals OperationsBy K. Bullock, M. Levesque, G. Lyle, D. L. Millar
ABSTRACT The options for reducing the carbon footprint of energy use in mining fall into three categories of activity: i) reducing demand, ii) improving energy utilization, and iii) adopting low carbo
Jan 1, 2012
-
A Novel Model for Risk Assessment of Adjacent Buildings in Tunnelling EnvironmentsBy Limao Zhang
This paper presents a novel model to assess the risk of adjacent buildings in tunnelling environments based on Extended Cloud Model (ECM). ECM is an organic integration of Extension Theory (ET) and Cl
Aug 1, 2013
-
Suppression of Abnormal Grain Growth in Friction-Stir Welded 6061-T6 Aluminum Alloy by Pre-Strain RollingBy S. Malopheyev, I. Vysotskiy, R. Kaibyshev, S. Mironov
"In this work, the effect of pre-strain rolling on the annealing behavior of friction-stir welded 6061-T6 aluminum alloy was studied. To this end, the as-welded material was rolled to 10 or 20 pct. of
Jan 1, 2018
-
Towards a Practical Stope Reconciliation Process in Large-Scale Bulk Underground Stoping Operations, Olympic Dam, South Australia"This paper deals with the reconciliation of open stope performance at Olympic Dam, South Australia, with a focus on stope stability, recovery, and operational aspects of stope reconciliation in relat
Jan 1, 2015