Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
The Pre-Feasibility Study – Big Choices, Little TimeBy D J. Logan, J Jackson
"As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin
Mar 8, 2016
-
Practical Considerations for Multimine Grade ReconciliationThis paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described
Mar 1, 2010
-
The MTM copper processBy R W. Shaw
The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de
Aug 24, 2022
-
-
Is the Python Right for Me? PythonGekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr
Aug 1, 2010
-
A Practical Approach to Truck Dispatch for Open Pit MinesBy D M. Silva, J C. Alves
According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di
Sep 26, 2011
-
Results of Self-Heating Tests of Australian Coals Conducted in a 16 m<sup>3</sup> ReactorA research and testing facility has been developed at Simtars to allow the spontaneous combustion testing of coal on a large scale. In this adiabatic reactor, the coal particle sizing is closer to tha
Jan 1, 2005
-
Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case StudyBy R Carreau
The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately
Jan 1, 2003
-
JORC and Mineral Resource Classification SystemsThe JORC Code contains a mandatory classification system for Mineral Resource and Ore Reserve estimates for public reporting. The classification is a statement of the Competent PersonÆs confidence in
Sep 26, 2011
-
Environmental Performance Evaluation ù Proposed Methodology and Procedures for Application in Mining DevelopmentsBy L Soares, W T. Hennies, F Fujimura
A methodology of environmental performance evaluation in mining developments is proposed, as well as guidelines and procedures for obtaining information to improve their environmental performance. Env
Jan 1, 2003
-
Advances in Rotating Magnetic Field Separation Since 1997Since the announcement of early experimental work on rotating magnetic field (RMF) separation at the Sixth Mill OperatorsÆ Conference in 1997, the concept of RMF separation has been developed and test
Jan 1, 2000
-
What category cyclone is devastating your plant?By T G. Vizcarra, B Wong
Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y
Aug 29, 2018
-
Steam Winding EnginesWINDING engines are one of the most important units in the equipment of a mine. Upon the winding machinery depends not only the output of the mine, but it supplies in most cases the only means by whic
Jan 1, 1911
-
Blast design and execution drives mine site profitsBy J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
Why Reinvent the Wheel when there are Established Methodologies to Aid the Design and Assessment of Restored Natural Ecosystems on Mined Land?By R N. Humphries
The aim of this paper is to question the need to develop bespoke monitoring and assessment methodologies and criteria, thereby ‘reinventing the wheel’, when designing and assessing the success of impo
Jul 16, 2014
-
Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large BoreholesIn high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo
Nov 25, 2010
-
Negotiating Mining Agreements with Pacific CountriesThis paper briefly discusses the negotia- tion of the more important provisions in agree- ments for exploration and mining rights with Pacific countries. LAND RIGHTS Land rights are complicated and s
Jan 1, 1987
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
Measuring the Effectiveness of Change through Best Practice ReconciliationBy G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016