Numerical Simulations of Jet Break-up Phenomena for the High Pressure Die Casting ProcessBy Valerio Viti
In High Pressure Die Casting a molten metal is injected through a thin gate into the cast cavity. High injection pressures and high gate velocities create atomization phenomena which can negatively af
Jan 1, 2006
-
Experimental Shaft Machine for Nuclear Waste DisposalBy Dennis Ofiara, Michael Lewis
An experimental 1.75 meter Shaft Boring Machine was designed and manufactured by The Robbins Company. The drill was used by contractor Drillcon Raise AB to drill test shafts at an SKB underground test
Jan 1, 2005
-
Notes on the Geology, Quartz Reefs and Minerals of the Waihi GoldfieldThe rocks of Waihi and the surrounding district are almost entirely rhyolitic and ande5itic in character. Sedimentary rocks, with the exception of some surface deposits of clay loosely compacted congl
Jan 1, 1902
-
OFR-40-72 Research In Advanced Power Systems For Mining Health And SafetyBy E. S. Chalpin
On 25 August 1971, the U.S. Bureau of Mines contracted with the Aerojet Liquid Rocket Company to perform an engineering research program to be completed on 25 May 1972. The program objective was to ev
Jan 1, 1972
-
Innovation Drivers And Opportunities Across The Gold Metallurgy Value StreamBy N. S. Phala
Declining gold grades, mineralogical complexity of ore bodies, increasing input costs, more stringent conditions in the licenses to operate, and uncertain gold price dynamics combine to exert signific
Sep 1, 2012
-
Notes on SamplingThis paper is intended partly as a summary of the conclusions that have been arrived at by various authorities on this matter, and also with a view to initiate some discussion on the subject, especial
Jan 1, 1904
-
OFR-47(8)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 8. Soil AlgaeBy Thomas L. Starks
Surface soil/spoil Samples (0-10 cm) from experimental test sites in western North Dakota were aseptically collected during August 1975 and each month (May through September) during 1076 and 1977. Sel
Jan 1, 1982
-
The Coolest Job There Ever WasI once read an æarticleÆ in FHM Magazine entitled æThe Coolest Jobs There Ever WasÆ. It was about a group of guys who were pursuing careers that any person on the planet would just kill for. I distinc
Jan 1, 2005
-
Roscommon Quarry - An Upgrade of the Comminution Circuit: The Installation of a Nordberg 7ft Symons and HP 300 Cone CrusherIn line with DML Resources continual forward management policies, the Roscommon Quarry operation has recently installed and commissioned a Nordberg 7 ft Symons cone crusher and a HP 300 cone crusher.
Jan 1, 1994
-
Training and industry -Another Gap!By J. E. Terry
This paper outlines the steps that are being taken to close the gap between training and industry and indicates areas in which more work needs to be done. Although based on experience in the Maritime
Jan 1, 1970
-
RI 3674 Cushioned Blasting - II. Preliminary Studies of Gallery TestingBy A. R. T. Denues
"INTRODUCTION The orienting phases of the current investigation of cushioned blasting in the Explosives Division of the Bureau of Mines were indicated in a previous publication (5) 3/. Pertinent liter
Jan 1, 1943
-
Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
Exploration activities and results for the Fort a la Corne diamond project, SaskatchewanBy Brent C. Jellicoe, Phil Robertshaw, J. Murphy, Peter Williamson
Kimberlites and associated diamonds have been the focus of extensive exploration in central Saskatchewan since 1988. During 1989, Uranerz Exploration and Mining Limited identified 71 shallow magnetic
Jan 1, 2001
-
OFR-3-73 Bureau Of Mines Environmental Action Programs For Northeastern Pennsylvania - Refuse Bank Removal Subsidence MonitoringBy R. W. Bee
This project, sponsored by the U.S. Bureau of Mines, Division of Environment, addresses two major subjects: refuse removal and subsidence monitoring. The refuse removal task consisted of developing a
Jan 1, 1972
-
OFR-82(2)-75 Probe Drill Guidance System - Volume 2 - Appendix A - Computer ProgramBy Llewellyn A. Rubin
ROUTINES AND SUBROUTINES A- 1 Wait Loop (Wait) A- 2 Receiver Processing (RCVP) A- 3 Control Panel Sequence (CPNL) A-4 Interrupt Routine (INTRP) A- 5 Math Processing Routine (PROC) A-6 Input
Jan 1, 1973
-
All-In Sustaining Cost Analysis: Pros and ConsBy A. G. Yapo, T. W. Camm
"All-in sustaining cost is a metric used by mining companies to reflect the cost of gold mining in a consistent format useful to both investors and mining professionals. Cost reporting focused on the
Jan 1, 2017
-
RI 3911 Electrolytic Manganese in Low-Carbon Steel Tests at the Stanley Works, Bridgeport, ConnBy F. Sillers, R. T. C. Rasmussen
"INTRODUCTION This is the third report of investigations by the Bureau of Mines in cooperation with industry to establish the value of electrolytic manganese in the manufacture of ferrous and nonferro
Jul 1, 1945
-
OFR-78-78 Feasibility Study Of Electric Shock PreventionBy Gordon R. Sima
The contract is concerned with feasibility studies, design and fabrication of a group of prototype hand-held test instruments and machine-mounted test instruments for measurement of electrical shock h
Jan 1, 1977
-
Plastic Deformation In Metal-Powder CompactsBy Morris Steinberg, John Wulff, Robert Kamm
IN powder metallurgy it has often been observed that shrinkage may occur in one direction and growth in another during sintering. Even in long-time sintering experiments the rate of shrinkage may be d
Jan 1, 1947
-
Cement and Concrete Are Not What They Used to BeBy Raymond E. Davis
LET'S imagine we are at the Grand L Coulee Dam, where daily 15,000 barrels of low-heat Portland cement and 27,000 tons of processed aggregate in various sizes are mixed to produce 30,000 tons of
Jan 1, 1939