Search Documents

  • TMS
    Phosphorus Removal Of Oolitic High Phosphorus Iron Ore Using Biomass Char

    By Tengfei Qi, Liqiang Fan, Huiqing Tang

    A new method to process the oolitic high phosphorus iron ore for phosphorus removal has been proposed in this research. It is an integration of direct reduction and melting separation with carbon-cont

    Jan 1, 2015

  • AIME
    Production Engineering - Determination and Application of Depth Pressures in the Yates Field (With Discussion)

    By Dale Nix

    DuRing the past year approximately 400 depth pressures have been recorded in the Yates field. Of these, 315 were "shut-in depth pressures," observed for the purpose of adjusting well potentials withou

    Jan 1, 1932

  • AUSIMM
    Hydrometallurgy into the Next Millennium

    Hydrometallurgy has a history of over 300 years with copper leachingand cementation having been exploited in Spain as far back as 1670.Since then, hydrometallurgy has become an integral, expanding bra

    Jan 1, 2001

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • CIM
    Reducing respirable dusts and fines through shearer drum design in coal mines

    By B. Tiryaki, M. Ayhan, O. Z. Hekimoglu

    Coal shearers are one of the major sources of dust and fines in underground coal mines. Despite considerable research investigations, no comprehensive in situ investigations coupled with extensive lab

    Jan 1, 2002

  • SME-ICGCM
    Practical Strata Management, Beltana No. 1 Mine, Australia

    By Shane McDonald

    Australia produces approximately 84 million tonnes of coal per annum from 30 longwalls in New South Wales and Queensland, operating at an average depth of around 300m. Industry trends and expectations

    Jan 1, 2008

  • SME
    Reducing 'Total Transportation' Costs

    By Phillip J. Maddex

    After the presentation of a co-authored paper, "The Cost of Transporting Ores and Raw Materials in World Markets", at the February SME meeting, one questioner commented, "You have been talking about t

    Jan 1, 1967

  • SME
    Optimization In Large Tunnels

    By H. S. Rathor

    NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is

    Jan 1, 2005

  • AUSIMM
    Ventilation rules of thumb – friend or foe? Focusing on design upcast air velocities for shafts and raise bores

    By A S. Derrington

    There are several long-standing rules of thumb that are often quoted in mine ventilation studies. They include airway ‘carrying velocities’ and the critical upcast air velocity range that must be avoi

    Aug 28, 2017

  • ISEE
    Smooth Blasting with the Electronic Delay Detonator

    By Yoshiharu Tanaka, Toshiyuki Ichijo, Masaaki Yamamoto

    We utilized electronic detonators (EDs) to investigate the effect of high detonator delay accuracy on overbreak, remaining rock damage, and surface smoothness, in comparison with that of long-period d

    Jan 1, 1995

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • ISEE
    Comparative Study of Blasting Techniques in Dimensional Stone Quarrying

    By Sushil Bhandari, S. S. Rathore

    Controlled drilling and blasting continue to be an important method of block production and for block splitting. Drill and blast technique has disadvantage that sometimes, it produces cracks in uncont

    Jan 1, 2002

  • AUSIMM
    Multislice Longwalling for Thick Seam Extraction – Properties of Goaf in the Roof and Gate Roads Behaviour

    By Z Lubosik, S Prusek, M Plonka, B Syrek

    "The most commonly used method of thick coal seam extraction in Polish deep mines is multislice longwall (MSL). In MSL stability of goaf in the roof as a result of previous extraction in upper slice i

    Nov 5, 2014

  • SME
    Production Estimating Techniques For Underground Mining Using Roadheaders

    By D. M. Neil

    Road-headers are one of the most popular mechanized excavators used in mining and civil under-ground construction. These machines are primarily used in soft to medium hard rocks. This paper reviews th

    Jan 1, 1994

  • DFI
    Determination of Initial Stiffness of Drilled Shafts for the Analysis of Settlements under Service Loads

    By Carlos A. Prato, Federico Pinto

    "ABSTRACTThe design of drilled shafts often incorporates large factors of safety, for which settlements under service loads are highly influenced by the initial elastic stiffness. In the case of group

    Jan 1, 2014

  • SME
    Safe Closure of Tailings Storage Facilities: Application of GISTM for Responsible Management - SME Annual Meeting 2026

    By Germán Toledo

    The closure of TSF represents a critical milestone in the life cycle of mining operations, requiring the integration of technical, environmental, and social dimensions to ensure long-term safety and s

    Feb 22, 2026

  • IMPC
    Development of Gold Extraction Technology at Base Metals Ore Processing

    By Elena L. Chanturiya, Vladimir A. Bocharov, Roman A. Amosov

    "In many volcanogenic base metal deposits of Russia the gold is closely associated with copper sulphides and pyrite. The recovery of gold associated with pyrite is especially difficult problem.Investi

    Jan 1, 2003

  • IMPC
    Visualization of the Process of Raw Materials Separation in the Separator with Ferromagnetic Liquid (ABSTRACT PAGE)

    By M. Brozek, W. Pawlos

    "The separation of raw materials in the separator with ferromagnetic liquid occurs due to differences in magnetic and gravitational properties of respective components in relation to each other and to

    Jan 1, 2003

  • AIME
    New York Paper - The No. 2 Unit of the Mill of the Bunker Hill & Sullivan Mining & Concentrating Co.

    By R. S. Handy

    The No. 2 unit of the West Mill of the Bunker Hill & Sullivan Mining & Concentrating Co., which went into commission Apr. 17, 1912, is structurally a twin of the No. 1 unit, which was started Nov. 9,

    Jan 1, 1913

  • NIOSH
    RI 2454 Transportation Systems at Lime-Plant Quarries

    By Oliver Bowles

    This paper is the fourth of the current series issued by the Bureau of Mines on lime- plant problems . It is hoped that the information presented in these reports will develop sufficient interest amon

    Mar 1, 1923