Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
IC 6605 Milling Methods And Costs At The Pecos Concentrator Of The American Metal Co., Tererro, N. Mex. - IntroductionBy H. D. Bemis
This paper describing the milling practice of the American Metal Co. at its Pecos con¬centrator is one of a series on milling methods and costs being prepared by the United States Bureau of Mines.
Jan 1, 1932
-
Design Considerations For Mining Thick Seams And Seams Lying In Close Proximity To One AnotherBy J. W. Wilson, S. Nakajima, B. D. Singh
According to the Project Independence blueprint, a 270 percent increase in coal production is expected from western coal fields compared to an increase of 100 percent for the nation as a whole. Furthe
Jan 1, 1977
-
Numerical and Physical Modelling of Tundish Slag Entrainment in the Steelmaking ProcessBy S. Bradshaw, A. Mabentsela
"Physical and numerical modelling methods were followed to identify mechanism(s) for tundish slag entrainment in a bare tundish and one with a flow control device (FCD).The physical and numerical mode
Jan 1, 2017
-
High Capacity Barrettes In A Region Of Old Underground QuarriesBy F. Schlosser
The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz
Jan 1, 1989
-
Geologist's Gordian Knot: To Cut Or Not To CutBy I. S. Parrish
As noted by McKinstry (1948), "How to deal with erratic high samples is one of the knottiest problems in ore estimation." He described a variety of approaches and methods to alleviate the problem thro
Jan 1, 1997
-
Radar guided blasthole drilling improves product recoveryBy I Mason, M van de Werken, B Zhou, J Hargreaves, W Stasinowsky
A critical step in open cut coal mining is clean removal of the overburden. This is usually achieved by drilling, blasting and digging. A key part of this process being successful is to stop drilling
Sep 1, 2024
-
Tailings Revegetation and Arsenic Levels in the EnvironmentBy D Craw
Oceana Gold as part of their environmental strategy are looking at various methods for cost-effective revegetation of their tailings dams. Under the concept of revegetating the tailings this study loo
Jan 1, 2006
-
Navigating Operational Hurdles in SAG Mills: Identifying and Addressing Common Challenges - SME Annual Meeting 2024By Kevin Erwina, Rajiv Chandramohana, Connor Meinkea
This paper explores prevalent operational challenges encountered globally in SAG mills, including suboptimal throughput, liner wear, excessive energy consumption, and SAG mill load stability. The pape
Feb 1, 2024
-
Grade Control Blending And Selectivity For Optimal Process Performance At The Skorpion Zinc Mine, NamibiaBy G B. Gnoinski
The Skorpion Zinc Mine and Refinery is situated approximately 25 km north of Rosh Pinah, south-western Namibia. The supergene zinc oxide deposit at Skorpion is hosted in a volcano-sedimentary success
Jan 1, 2007
-
Study on Mineral Processing for a Cassiterite Ore in Southwest ChinaStudy on Mineral Processing for a Cassiterite Ore in Southwest China
Sep 13, 2010
-
The Efects of Rock Mass Strength and Joint Orientation on Pillar Stability in Underground Coal MinesBy S. M. Hossaini, M. Ataei, H. Moosavi
The abstract highlights the importance of pillar stability in underground coal mines and the influence of rock mass strength and joint orientation on pillar behavior. The study employs numerical model
Apr 4, 2022
-
Mine Cars of CanadaBy G. C. Lipsyy
ALL mineral production? of Can11.da is transported in a mine car at some stage during its extraction. There are as many types and varieties of mine cars as there are of mines. Many of the cars in use
Jan 1, 1945
-
Froth zone design optimisation – the key to enhancing recovery in large flotation cells, P.R. Brito-Parada, D. Mesa, J. Karvonen, R. Grau, D. Davoise, and A. LópezBy D. Mesa, J. Karvonenb, A. López, P. R. Brito-Parada, R. Grau, D. Davoise
The froth zone in flotation cells plays an important role in determining metallurgical performance. This is even more critical as cell sizes increase, since larger bursting surface areas can easily re
Jan 1, 2020
-
Crushing Practice at AjoBy David Cole
THE New Cornelia Copper Co. is mining and treating a 'monzonite " porphyry" copper deposit that is all hard rock. The oxidized surface shell, which constitutes the leachable part of the orebody,
Jan 1, 1925
-
RI 7271 Vapor Pressures Of Liquid Titanium (2,008° To 2,379° K) And Liquid Platinum (2,045° To 2,442° K)By R. K. Koch
The vapor pressures of liquid titanium and liquid platinum were studied under the Bureau of Mines program for the determination of thermochemical data on the transition elements. Beating was done in a
Jan 1, 1969
-
Two-Stage Program Boosts Pima To 30,000 TPDBy George A. Komadina
From its modest beginning in 1957 with one mill grinding section handling 3000 tpd Pima has steadily expanded. In July 1966, work was completed that allowed the concentrator to treat in excess of 18,0
Jan 11, 1967
-
Pebbles MillsBy B. S. Crocker
Introduction Pebble mill grinding can be defined as wet or dry grinding in a tumbling mill with pebbles used as grinding media instead of metal balls. To clarify the terminology, which may differ i
Jan 1, 1985
-
Optimisation Challenges in Underground Mine Planning and DesignUnderground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab
Dec 6, 2010
-
The Application of AS 61508 to Road Tunnel Fire and Life Safety SystemsBy M Taylor
The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf
Mar 8, 2011
-
IC 7680 Methods And Costs Of Sinking A Shaft Through A Fractured, Water-Bearing Formation At Friedensville. Pa, - Introduction And SummaryBy Warren Hastings
This paper describes the methods and costs, in units of labor end materials, of sinking a 7 compartment vertical shaft 1,261 feet through a fractured, water-saturated formation. The shaft, designed fo
Jan 1, 1954