Search Documents

  • AUSIMM
    Integration of Oil Sands Mine Planning and Waste Management Using Goal Programmin

    By E Ben-Awuah

    Mine planning is the backbone of all mining enterprises and determines the profitability or otherwise of any mining investment. Providing high quality ore and tailings containment at the right time ar

    Sep 26, 2011

  • IIMP
    Sink and float. Aplicación y futuro en el Perú

    By Alfonso Guzmán da Silva

    El análisis del trabajo señala la importancia y aplicación del proceso Sink & Float en la aceleración de la industria minera metálica, la no-metálica y la del carbón del Perú. Dicho procedimiento que

    Jun 20, 1954

  • AUSIMM
    Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°C

    By E Jak, G Khartcyzov, M Shevchenko

    The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco

    Jun 19, 2024

  • IIMP
    Optimización en el ore control de la unidad Yauli

    By Jesús Ylazaca

    El presente trabajo describe el método de control de calidad del mineral o el denominado "Ore control", realizado en la unidad minera Yauli, cuya finalidad es maximizar el valor del mineral minado par

    Sep 12, 2005

  • SME
    The Priceless Ingredients

    By Grant P. Cordon

    Our subject, "Safety, Legal, and Contracting," is a range of topics which covers a broad spectrum, but is obviously Intended to focus our attention upon certain particular aspects of tunnel problems.

    Jan 1, 1974

  • NIOSH
    IC 7835 Shaft-Sinking Methods And Costs At The T. L. Shaft, Eureka Corp., Ltd., Eureka, Nev. ? Summary

    By A. C. Johnson

    The T. L. shaft of the Eureka Corp., Ltd., near Adams Hill, Eureka, Nev., was sunk in 1954 and 1955 to permit exploration and development of the lead-zinc-silver ore that had been indicated by drillin

    Jan 1, 1958

  • SME
    East Arlberg Highway Tunnel, Austria

    By Hans Treichl

    1. INTRODUCTION For Europe the Arlberg road tunnel signifies the elimination of the largest traffic barrier between Bucharest and Paris in the east-west transversal. Apart from that the tunnel will

    Jan 1, 1979

  • SME
    Exploration of Beach-Placer Heavy Mineral Deposits in the San Juan Basin in New Mexico

    By A. Robison, V. T. McLemore

    "The San Juan Basin, New Mexico contains many heavy mineral beach-placer sandstone deposits of Cretaceous age. Beach-placer sandstone deposits are concentrations of heavy minerals that formed by mecha

    Jan 1, 2016

  • AUSIMM
    A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting process

    By A Kamaraj, M Mohanasundaram, R Kumar, P Tikare

    This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig

    Aug 21, 2024

  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • NIOSH
    Effects Of Repeated Vibration Exposures In Muscle Tissue - Introduction

    By Claud Johnson, G. Roger Miller, Kristine M. Krajnak, Stacey Waugh, Oliver Wirth

    Workers exposed to vibrating hand tools are at risk of developing symptoms such as cold-induced vasospasms, loss of tactile sensitivity, and loss of grip strength in the fingers and hands. These symp

    Jan 6, 2006

  • CIM
    Integrated Operations for Maximizing Results

    By D. Schleiss

    Reduced access to knowledgeable workers is creating challenges for operations. We are doing more 4D Operations - dirty, dull, dangerous, and distant. Personnel costs in these environments are high, an

    Jan 1, 2014

  • SME
    Workshop Attendees Compare Ore Modeling and Mine Planning Software Systems

    By Betty Gibbs

    The Ore Body Modeling and Mine Planning Worshop, sponsored by the Society for Mining, Metallurgy, and Exploration, Inc. (SME), was held Feb. 22-24, 1991 before the SME Annual Meeting and Exhibit in De

    Jan 1, 1991

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • CIM
    Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec

    By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson

    Abstract -The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is loca

    Jan 1, 1993

  • NIOSH
    IC 9416 A Chromium Consumption And Recycling Flow Model

    By Jr. Gabler

    The U.S. Bureau of Mines (USBM) has developed a computerized commodity flow model for strategic and critical materials This flow model is generic and applicable to most commodities and amenable to upd

    Jan 1, 1994

  • CIM
    Monitoring Thickener Operation Using a Conductivity Probe

    By A. Probst, N. Moores, J. A. Finch

    "In 1994 McGill and INCO (Sudbury operation) initiated transfer of technology originally developed to detect level in flotation columns to thickeners. A conductivity probe was installed in a concentra

    Jan 1, 1998

  • CIM
    High-Speed Development of a 2,000-foot 12-degree Decline

    By M. D. Lawton, P. Steen

    "Drilling results from the established levels at AngloRouyn Mines Limited had indicated inadequate tonnages to meet the planning schedule. It was decided to develop the main zone of the orebody below

    Jan 1, 1971

  • AUSIMM
    Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9

    By R Justa Cámara, L M. Pinillos Lorenzana

    Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L

    Sep 17, 2014

  • SAIMM
    Effects of anisotropy and heterogeneity of rock mass on in-situ permeability tests

    By Y. Mitani, M. Zhang, M. Takeda, T. Esaki

    Despite their inadequacy, assumptions of isotropy and homogeneity are often applied to the analyses of in situ permeability tests. In this paper, we exam the effects of anisotropy and heterogeneity on

    Jan 1, 2003