One-Step Electrolytic Process Regenerates Chromic Acid Solutions - Problem DescriptionEtching solutions containing hexavalent chromium ions (e.g., chromic acid) are used in brass finishing, printed circuit board etching, preparation of plastic for plating, anodizing, and various other
Jan 1, 1980
-
Excavation Support And Groundwater Control Using Soil-Cement Mixing Wall For Subway ProjectsBy David S. Yang, Osamu Taki
The innovative Soil-Cement Mixing Wall Technique, developed independently in Japan, consists of mixing in-place soils with cement grout using multi-axis augers and mixing paddles to construct overlapp
Jan 1, 1989
-
Factors affecting nickel recovery from slags produced during platinum smeltingBy L. Andrews
Nickel is recovered as a by-product of the platinum-producing process operated by Anglo Platinum. The metal is mined mainly as sulphide minerals contained in platinum ores. These pass through the conc
Jan 1, 2004
-
Seismic Design Of Underground StructuresBy A. J. Hendron, J. E. Monsees
INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr
Jan 1, 1985
-
Life of Coal Pillars and Design ConsiderationsFollowing the Coalbrook Colliery disaster in 1960, Salamon and Munro (1967) established the well known empirical coal pillar strength formula in South Africa. This formula has prevented further violen
Nov 25, 2010
-
Continuation Methods for the Simulation of Rock Fracture with Cohesive ElementsBy M. L. F. Paullo, S. Cristian Mejia, D. Roehl
"Rock fracture simulation most often presents non-linear behaviour due to loss of material integrity and strain concentration in the fracture zone. These strains generate local instabilities that prop
Jan 1, 2015
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 IntroductionBy Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
OFR-103(2)-77 U. S. B. M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section II: Permeability TestingBy Adrian Brown
Pilot Hole ?X? was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. Five permeability tests were performed at
Jan 1, 1977
-
RI 2355 Determination of the Relative Comfort of Mine Working Places by Means of the KatathermometerBy G. E. McElroy, D. Harrington
In connection with the cooperative metal-mine dust and ventilation investigations of the U. S. Bureau of Mines and the U. S. Public Health Service , some underground data have been obtained with inten
May 1, 1922
-
Suppressing Dust during Tunnel Construction Using Automated Mist TechnologyBy Mike Lewis
"Descending several stories down a metal staircase into a shaft spanning a quarter city block -- soon to become Roosevelt Light Rail Station in Seattle, WA -- visitors are greeted with four perfectly
Jan 9, 2017
-
Repair Methods For Corroded Steel PilesBy C. Vipulanandan
With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als
-
A Process for the Recovery of Cobalt from SpeissBy Fennell B
A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.
Jan 1, 1983
-
The Pit Falls Of Benchmarking And How To Avoid ThemBy K. Hanson
When done properly, benchmarking is an extremely effective tool for assessing ones performance, finding areas for improvement, and identifying strengths. However, when done improperly it can be an ex
Jan 1, 2011
-
RI 4103 Argentena Zinc-Lead Mine, Clark Co. Nev.By Robert W. Geehan
"INTRODUCTION A preliminary examination of the Argentena mine was made in 'January 1945 by an engineer of the Bureau, who recommended investigation by diamond drilling. The Bureau conducted a core-dri
Jul 1, 1947
-
The use of waste material in underground coal mines - SME Transactions 2010By R. Brown, A. J. S. Spearing, M. Treinen, M. Theisinger
The mining and use of coal creates a significant amount of waste material that needs to be safely disposed of. It is likely that in the medium term, the Environmental Protection Agency (EPA) in the U.
Jan 1, 2010
-
RI 7657 - Effect Of A Surface Borehole On Longwall Gob Degasification (Pocahontas No. 3 Coalbed)By M. G. Zabetakis, T. D. Moore
The use of a partially slotted 6.5-inch-inside-diameter vertical pipe to remove methane from a longwall gob area at a depth of 2,260 feet in the Pocahontas No. 3 coalbed ms investigated. The value of
Jan 1, 1972
-
Microporosity and its Effect on the Fatigue Behavior of 7050-T7451 Thick PlateBy CH. Liu, H. X. Jiang, X. Xiao
"A study has been conducted to characterize the fatigue life in 7050-T7451 thick plate by the comparison between an experimental alloy and commercial alloy. The fracture origins were specified and the
Jan 1, 2018
-
Determination of iron ore mineralogy using Fourier transform infrared spectroscopy and machine learningBy L Dixon, J Carter, K Auyong
Fourier transform infrared (FTIR) spectroscopy and other near infrared (NIR) tools have been used in the bauxite industry for many years. Infrared spectroscopy exploits the differences in chemical com
Jul 24, 2017
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Development of the Design Build Philosophy—Tren Urbano to Second Avenue SubwayBy Chris Bennett, Drupad Desai, Kirit Mevawala
INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg
Jan 1, 2005