Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ventilation And Climatic Simulation Of Drift/Stope In Metal Mines (79b7ea50-1959-4187-8956-bc551a79c260)

    By R. Gunda

    Due to the rapidly increasing production rates and deepening of mine working areas, there is a drastic rise in the number of thermal issues to be addressed for maintaining a safe mine environment. As

    Jan 1, 2011

  • SME
    Developments In Continuous Vat Leaching

    By V. I. Lakshmanan, Dan A. Mackie

    Traditional vat leaching methods have had limited success, primarily due to the high cost of loading and unloading the vats. In general, such batch methods are labor-intensive and costly. Heap lea

    Jan 1, 1990

  • SME
    Beneficiation Of Brazilian Diatomite For Filtration Application Industry

    By S. C. A. Franca, M. T. Millqvist, A. B. Luz

    Laboratory experiments were performed on a Brazilian diatomite from Bahia State to produce an industrial product for use as a filter aid. Bench and pilot plant tests were conducted consisting of: diat

    Jan 1, 2002

  • SME
    Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine Lands

    By B. Samoski

    In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands

    Jan 1, 2002

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • SME
    A Simple Method To Select A Pit In The Presence Of Grade Uncertainty

    Mine planners must select a single pit for design with the knowledge that the grades on which this selection is made are uncertain. This uncertainty is often ignored through the use of deterministic m

    Feb 27, 2013

  • SME
    Maximizing Air Quality Inside Enclosed Cabs With Uni-Directional Filtration And Pressurization System - Preprint 09-099

    By A. B. Cecala

    Enclosed cabs have been used on surface mining equipment for many years to protect equipment operators from health and safety hazards. The surface mining and quarrying process is a highly mechanized

    Jan 1, 2009

  • SME
    Desulphurisation Of Fine Graphite Powder By HGMS

    By Y. Wang, K. S. E. Forssberg, A. Johansson, X. Lu

    This paper presents the desulphurisation of a fine graphite powder below 80 µm by high gradient magnetic separation. The removal of pyrite (FeS2) and pyrrhotite (Fe1-xS) from the fine graphite powder

    Jan 1, 2002

  • SME
    Long-Range Planning Commission - Report of the Management and Organization Committee

    By A. Tobey Yu, W. Joseph Schlitt, Alfred Weiss, Frederic L. Kadey, Louis Kuchinic

    Introduction The February and April 1984 issues of MINING ENGINEERING have already provided introduction to the long-range planning efforts of the Society of Mining Engineers (SME). These efforts are

    Jan 6, 1984

  • SME
    Technology News – Automated-Plow Longwall Ordered for Chinese Coal Mine

    German manufacturer DBT signed a contract to supply a sixth automated-plow long-wall system to Shenyang Coal in Liaoning province in northeastern China. This most recent order occurred just weeks aft

    Jan 1, 2004

  • SME
    Membrane Vs. Chemical Treatment To Remove Mine Water Contaminants ? Determining Which Process Works Best For Mine Water Treatment Needs ? Introduction

    By H. C. Liang

    Reverse osmosis (RO) and nanofiltration (NF) are widely regarded as being best available technologies (BATs) for removing contaminants of concern from water. In recent years, NF or RO treatment has i

    Jan 1, 2012

  • SME
    Arsenic Leaching From A Mine Tailing By Acidithiobacillus Ferrooxidans: Role Of Temperature, Ph, And Pulp Density

    Arsenic (As) removal behavior from Changgoon mine tailings was investigated using Acidithiobacillus ferrooxidans (A. ferrooxidans) in well-controlled batch reactors by varying pulp density (0.5?4%, pH

    Feb 27, 2013

  • SME
    Performance of NATM Hard Rock Tunnelling for Large Span Mined Tunnel Underneath Cross Harbour Tunnel

    By Lawrence Tsang, Conrad Ng, Tim Leung, Peter Poon

    "The Mined Tunnel is part of the Central-Wan Chai Bypass and Island Eastern Corridor Link (CWB), which is a strategic road along the northshore of Hong Kong Island targeted to alleviate the heavy traf

    Jan 1, 2016

  • SME
    A review of heat issues in underground metalliferous mines

    By T. Payne

    Underground heat issues are mainly focused on the detrimental effects to a workers health. However, working in hot, humid conditions has other negative effects. Studies have shown that safety, product

    Jan 1, 2009

  • SME
    Assessment of stability of flow in a modified mine ventilation network considering a presence of fire hazards

    By W. Dziurzynski

    The present article sets forward the results of field tests that made it possible to validate the mathematical model used in the VENTGRAPH ventilation engineer programmes. The case considered relates

    Jan 1, 2009

  • SME
    Three-Dimensional Cfd Modeling Of Purging From Refuge Chamber

    The MINER Act of 2006 mandated that all underground coal mines must install and maintain refuge chambers. Refuge chambers serve as a temporary shelter in case of emergency. Several factors affect the

    Feb 27, 2013

  • SME
    Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - Introduction

    By M. Botz

    Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the

    Jan 1, 2011

  • SME
    Influence Of Environmental Regulations On The Design Of Barrick Goldstrike’s Roaster Off-Gas Cleaning Circuit (59b0e343-de58-4518-9d0e-e7d0bcede677)

    By A. Cole, F. Porretta

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    Jan 1, 2002

  • SME
    Experimental Protocol Enabling The Use Of X-Ray Photoelectron Spectroscopy In Concentrators. Case Study: Regrinding Stage

    By G. Montes-Atenas

    Throughout the years, research studies have reached a consensus in acknowledging the relevancy of surface chemistry phenomena on minerals separation and metals extraction. Many techniques, and notably

    Feb 27, 2013

  • SME
    Simulation Of A 14,000 T/D Mill-An Aid To Process Design And Plant Optimization

    By M. D. Bath

    Minproc Engineers Inc. (Minproc) recently completed the construction and start-up of a process facility to treat 14,000 t/d of gold-silver ore at Kori Kollo, Bolivia. The comminution circuit consists

    Jan 1, 1994