Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Cross-Borehole Geophysical Probing For Site Characterization

    By R. J. Lytle

    INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to

    Jan 1, 1979

  • SME
    Rehabilitation and Expansion of the Central City Tunnel System in Minneapolis, MN

    By Greg Sanders, Bill Lueck, Michael Gilbert, Mahmood Khwaja

    "The city of Minneapolis contracted with CDM Smith to update and provide a conceptual design for improvements to mitigate surcharge flooding in the Central City Storm Water Tunnel System (CCSTS). As a

    Jun 1, 2019

  • SME
    Future Supply Of Silver And Gold

    By Gordon M. Miner

    When I was originally invited to speak to this audience on the subject of the future supply of precious metals I was somewhat apprehensive and suggested that the Program Chairman select someone with m

    Jan 1, 1980

  • SME
    Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022

    By R. Aliberti, E. Comis, M. Wone

    DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov

    Dec 1, 2022

  • SME
    Wetting Phenomena In Oil Sand Systems And Their Impact On The Water-Based Bitumen Extraction Process

    By J. Drelich

    The highly-efficient and economically-feasible technology for bitumen recovery from US oil sands using a water extraction approach was developed at the end of the last century. This water-based bitume

    Jan 1, 2007

  • SME
    Large Underground Coal Mines Of The 1990?s

    By David D. Eyer

    Since the decade of the 1990s is nearly upon us, I have focused on what I see are the likely trends featured in new large underground coal mines 10 years from now. I do this from the vantage point of

    Jan 1, 1988

  • SME
    A Generalized Multiperiod MIP Model For Production Scheduling And Processing Facilities Selection And Location ? Introduction

    By Ralph W. Barbaro

    In the mineral industry, the objective of a mining venture is to extract, process, and market a mineral commodity in such a manner that the profit of the venture is maximized. In a mining venture, a c

    Jan 1, 1983

  • SME
    Allegheny River Tunnel Crossing Project

    By Paul A. Roy

    The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narro

    Jan 1, 2008

  • SME
    California High Speed Rail: Driving the Next Level in Dynamic Tunnel Design - Project Description

    By Carrie Pourvahidi

    The California High Speed Rail Authority (Authority) was created by the State of California through legislation in 1996. The purpose of the Authority is to plan, construct, finance and operate a state

    Jan 1, 2008

  • SME
    Sublevel Stoping of the EB Massive Reefs at Loraine Gold Mines, Ltd. No. 3 Shaft

    By R. D. H. Bedd

    GEOLOGICAL NOTES The area under discussion is situated approximately 150 m north of Loraine No. 3 shaft at ± 1500 m below surface. The block being mined extends from about halfway between 50 and 52 l

    Jan 1, 1982

  • SME
    Handling Infiltration Into Underground Structures

    By Edward D. Graf

    Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont

    Jan 1, 1987

  • SME
    Interaction Of Grade And Metallurgy Simulations In Assessing Uncertainty For Ore Routing Determinations In The Gold Quarry Deposit

    By M. Baumann

    Introduction Gold Quarry is one of the largest gold deposits in Nevada, located along the Carlin Trend, approximately seven miles north of Carlin, NV. Owned and operated by Newmont Mining Corporati

    Jan 1, 2007

  • SME
    Overview Of The US Bureau Of Mines' Research In Position And Heading Systems For Mine Machine Guidance

    By C. C. Jobes, J. J. Sammarco, D. L. Anderson

    Computer-aided control of a mining machine places its operator in a safe, remote location, thus reducing health and safety risks. Sensing systems that provide machine position (xy coordinates) and hea

    Jan 1, 1993

  • SME
    A comparison of globe, wet and dry temperature and humidity measuring devices available for heat stress assessment

    By S. Hardcastle

    Various controlled and ambient tests were undertaken to evaluate the performance of a variety of digital heat stress monitors, psychrometers and simpler temperature/relative humidity data loggers that

    Jan 1, 2009

  • SME
    Middle Tertiary Mineralization Related To Metamorphic Core Complexes And Detachment Faults In Arizona And California - Introduction

    By N. E. Lehman

    Cordilleran metamorphic core complexes in the southwestern United States are areas where middle to late Tertiary low-angle normal faulting has uncovered rocks that were at temperatures sufficient for

    Jan 1, 1987

  • SME
    Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories

    By Stephen Phillips, Luigi P. Gonano

    Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.

    Jan 1, 1983

  • SME
    The Contribution of the on-line Coal Analysers to the Sustainability of Greek Lignite Mining Sector

    By M. Galetakis, C. Roumpos

    A sustainable coal industry needs to achieve a number objectives concerning mainly with superior utilisation of deposits and improved environmental performance. Modern quality control systems, which a

    Jan 1, 2005

  • SME
    Getting the Right Contract Package

    By W. W. Edgerton

    Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid

    Jan 1, 2008

  • SME
    Overview of NFPA 502 Standard for Road Tunnels, Bridges and Other Limited Access Highways, 2008 Edition

    By William Connell

    NFPA 502, Standard for Road Tunnels, Bridges and Other Limited Access Highways establishes minimum fire protection and fire life safety requirements for road tunnels, bridges and other roadways where

    Jan 1, 2008

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002