Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Optimal Sizing Of Conventionally-Sunk Ventilation Shafts Based Upon Capital And Operating Criteria (e05ee128-628b-45f8-8a69-2e8e36ccc831)

    By Y. J. Wang

    The selection of a shaft size for ventilation purposes is a classic problem of concern to mining engineers. This presentation is concerned with the sizing of conventionally-sunk circular shafts with c

    Jan 1, 1977

  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986

  • SME
    A Tunneled Solution for the Cemetery Brook Drain in Manchester, New Hampshire - NAT2022

    By Frederick McNeill, John Harper, Mahmood Khwaja, Shawn Lavoie, Timothy Cloughert, David Polcari

    City of Manchester, NH, is implementing a 20-year plan to control and significantly reduce overflow of its sewer system. The long-term control plan had called for large scale box culvert installation

    Dec 1, 2022

  • SME
    Discussion - Using Geostatistics to Predict the Characteristics of Washed Coal

    S.L. Barua and Y.C. Kim M. Armstrong's paper is very interesting and can be regarded as a pioneering work of applying geostatistics on washed coal. The density levels used in her study are uni

    Jan 1, 1985

  • SME
    The Extraction Of Precious Metals From Geological Brines - I. Background

    By T. G. Legare

    It is now well documented that trace amounts of silver, gold, and platinum group metals occur in certain geothermal brine deposits. A significant body of literature has been generated over the last tw

    Jan 1, 1985

  • SME
    SME Annual Conference & Expo

    By Georgene Renner, Chee Theng, William Gleason

    "With more than 900 booth spaces sold and 630 exhibiting companies displaying their wares, there was something for all 7,804 attendees on the exhibit floor of the 2015 SME Annual Conference & Expo in

    Jan 1, 2014

  • SME
    Predicting and Optimising the Strength of Cemented Paste Fills

    By Kanhaiya Mishra, Phanil. K. Mandal, S. K. Behera, P. S. Paul, Prashant Singh, C. N. Ghosh

    The techno-economic and social benefits of cemented paste backfill (CPB) resulted in its wide acceptance by the mining industry. The Ordinary Portland Cement (OPC) remains the key binder but to dimini

    Jul 14, 2022

  • SME
    Mechanized Rock Excavation In Mining

    By George H. K. Schenck

    In this decade of the 1.970's it is forecast that eight billion cubic yards of rock will be excavated from 400, 000 miles of new tunnels, drifts and other underground workings in the western worl

    Jan 1, 1974

  • SME
    Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, India

    By William Brundan

    INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide

  • SME
    Fan Stall And Multiple Operating Points In Multiple-Fan Ventilation Systems (845c948b-5ed5-4f84-af0f-8c01f7ddc63e)

    By Y. J. Wang

    Stall or aerodynamic stall of axial-flow fans has long been recognized as an important operational problem in mine ventilation. To develop a technique for characterizing fan stall in multiple-fan vent

    Jan 1, 1991

  • SME
    Computer-Based Monitoring And Control Of A Mast-Type Roof Drill

    By M. P. Hoffman

    The U.S. Bureau of Mines is developing a roof bolter with a computer-controlled drill head that will increase the safety of roof bolting in underground coal mines by allowing miners to be relocated to

    Jan 1, 1994

  • SME
    Automation of Roof Bolting in Underground Coal MinesThrough Electrohydraulic Control

    By Kevin Saeler, Patrick Willaman

    Utilizing automation is one way to improve competitiveness. Roof and rib bolting in underground coal mines has not changed significantly for more than 40 years. Most roof bolting is still a largely ma

    Jul 1, 2023

  • SME
    Suspension Of Apatite Particles In A Self-Aerated Denver Laboratory Flotation Cell

    By O. A. Lima

    Effective solids suspension is a necessary precondition for particle collection, and solids suspension is largely dependent on the hydrodynamics of the flotation cell. This study attempted to correlat

    Jan 1, 2009

  • SME
    Tunneling Through a Buried Valley with a Hard Rock EPB Compatible TBM - RETC2021

    By William Hodder, Ehsan Alavi, Nader Ghasempour, Daniel Cressman

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north

    Jun 13, 2021

  • SME
    Polygon Set Manipulations For Interactive Mine Planning

    By F. H. Seymour

    Central to Newmont Gold's Mine planning system is the ability to interactively perform cut and fill operations on topographic contours and to accurately evaluate grades and tonnages within contou

    Jan 1, 1990

  • SME
    Mechanism of Mechanical Entrainment in Chalcopyrite Flotation: Effects of Clay Minerals - Mining, Metallurgy & Exploration (2024)

    By Hasan Ali Taner, Vildan Onen

    One of the problems in flotation is mechanical entrainment and the other is the presence of complex gangues (especially clay minerals). In the present study, it was aimed to determine the effects of c

    Dec 29, 2023

  • SME
    Fundamental Aspects of Fine Coal Filtration

    By J. A. Mejia

    The combination of high-resolution X-ray microtomography (HRXMT) image analysis and Lattice-Boltzmann Method (LBM) simulations has demonstrated the ability to describe real multiphase flow problems in

    Feb 23, 2014

  • SME
    The Role Of Recuperation Functions In The Early Stages Of The Mine Planning Of An Iron Orebody

    By Fernando Humberto Muge

    One of the problems that arises in the early stages of the mine planning before the determination of the mining exploitation method is to predict what will be the recoverable ore reserves in tonnage,

    Jan 1, 1982

  • SME
    A Novel Approach To Processing Coal Combustion Ash And Organic Bio-Solids - Introduction And Background - Preprint 09-110

    By R. Mensah-Biney

    The NC State University Minerals Research Laboratory (MRL) and Waste Reduction Partners (WRP) of the Land of Sky Regional Council joined efforts in 2000 to initiate a technically sound and practical p

    Jan 1, 2009

  • SME
    Sinking And Commissioning Of The Eastern Twin Shaft System At Buffelsfontein Gold Mining Company Limited ? Introduction

    By G. L. Smit

    The Buffelsfontein Gold Mining Company is situated in the Klerks-dorp district of the Province of the Transvaal in the Republic of South Africa, approximately 100 miles west of Johannesburg. Gold p

    Jan 1, 1964