FE Modelling Of Mining-Induced Energy Release And Storage RatesThis paper describes a simple finite element (FE) modelling approach which leads to the computation of seismic energy release rate (ERR) and strain energy storage rate (ESR) which result from mining.
Jan 1, 1999
-
A Practical Approach To Plant-Scale Flotation Optimization - SynopsisDecision-making regarding plant-scale reagent dosage regimes and air rates is a topic of ongoing investigation and high importance. The current work explains some techniques that have proven useful in
Jan 1, 2013
-
Numerical simulation of multiphase flow in a Vanyukov furnaceBy Y. M. Chen, H. L. Zhang, W. U. Bing, C. Q. Zhou
Multiphase flow in the widely used Vanyukov furnace was numerically studied. An unsteady three-dimensional and three-phase flow model was firstly built using the computational fluid dynamics (CFD) sof
Jan 1, 2015
-
Effect of Reclaimed Bauxite on Andalusite-Based Refractory Castables for Tundish ApplicationsBy E. Matinde, S. L. Msibi
"The robust nature of alumina refractory materials presents opportunities for their in-process reclaiming and re-use in non-critical applications. Virgin refractories can be substituted with different
Jun 1, 2019
-
Strength, Deformability, and Micromechanics of Brittle Fracture in a Crystalline Rock Under True Triaxial Compressive StressesBy B. Haimson
A new loading apparatus was fabricated and used to conduct true-triaxial compression tests on KTB amphibolite, a crystalline basement rock. Tests in dry jacketed samples reveal that the intermediate p
Jan 1, 2003
-
Mathematical Solutions To The Multiple-Fan Ventilation SystemsBy S. Sarac
In this study, graphical and mathematical methods used to determine operating points in single or multiple fan ventilation systems are summarized. The problem is mathematically formulized for parallel
Jan 1, 2000
-
A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop CollieryBy R. Lombard
"Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po
Jan 1, 2015
-
Effect of Yield Strength on Wear Rates of Railway WheelsBy J. W. van der Merwe, A. S. Bolokang, M. J. Phasha, V. J. Matjeke, C. Moopanar
"Excessive wear rates on railway wheels can result in rolling-stock derailments. If wear is detected early the possible derailments can be prevented by prematurely replacing wheelsets, although the in
Jan 1, 2016
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
The Design Of Stable Pillars In The Bushveld Complex Mines: A Problem Solved? - SynopsisBy D. F. Malan
This paper gives an overview of the difficulties associated with determining the strength of hard-rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re
Jan 1, 2011
-
LHD optimization at an undergroundchromite mineBy W. Mbhalati
"Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat
Jan 1, 2015
-
Trends in Productivity in the South African Gold Mining IndustryBy T. Tholana, P. N. Neingo
"Mining companies globally are currently facing severe economic and financial challenges. In addition to global challenges, the South African mining industry has to face other operational challenges t
Jan 1, 2016
-
Bindura Nickel Smelter - From Decommissioning, Care And Maintenance, To Plant Re-StartBy A. Mboma
Keywords: Furnace, decommissioning, care and maintenance, re-start, funding, nickel Bindura Nickel Corporation (BNC) operates two nickel mines, and treats concentrates from these mines as well as
Jan 1, 2011
-
Seismology And Slope Stability In Open Pit MinesBy R A. Lynch, D A. Malovichko
The implementation of routine real-time micro-seismic monitoring of open pit mine slopes has been discussed. Some examples of seismic arrays have been given, and a recommendation of suitable seismic
Jan 1, 2006
-
Improvement of the Cobalt Process at the Chemicals of Africa (Chemaf) Usoke Plant – Effect of Seed RecycleBy Jo Katembo, Patty Bwando, Patient K. Ilunga, Yves Kalubi, Emman Mulaj
"From 2010, the dolomite concentration in the ore fed to the Usoke Plant increased, resulting in a significant increase in the gangue acid consumption and Mg build-up in the circuit, and thus an incre
Jan 1, 2015
-
The Distribution Of Metallic Elements In Granulated Nickel Converter Matte PhasesBy E. L. Thyse
Keywords: Pyrometallurgy, converter, nickel, matte, distribution Metallic elements occupy a wide range in granulated nickel converter matte phases. The distribution of these metallic elements, pa
Jan 1, 2011
-
Modeling of factors influencing the extent of mud infiltration in a fractured rock massBy C. Tan, C. Detournay
Wellbore stability is a major concern for drilling in naturally fractured formations. The infiltration of drilling mud into the fractures is a factor, which may compromise wellbore integrity due to t
Jan 1, 2003
-
Preparation, characterisation, and application of spent tyre-derived activated carbon chars for total organic carbon removal from wastewaterBy P. O. Osifo, K. Premlall, X. Goso, R. H. Matjie, M. R. Mulaudzi, J. R. Bunt, K. Mphahlele
This study investigates the transformation of pyrolytic spent tyre-derived char and crumb rubber into high-performance activated carbon chars for industrial wastewater remediation. Utilising an in-hou
Mar 30, 2026
-
Management of the Nkomati Mine Crusher Slope FailureBy R. Armstrong
Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run
Jan 1, 2014
-
Process mineralogy: adding the value in the minerals value chain, D. ChettyBy D. Chetty
Process mineralogy forms an integral part of geometallurgy, with ore body characterisation being but one piece of the puzzle in optimising value derived from ore. This value is not only financial, but
Jan 1, 2020