Auburn Furnace ServicesBy R. S. McDonald
Auburn began operations 40 years ago with an office in Sudbury, Ontario, Canada, to provide services to Inco Limited. Over the next 40 years, operations expanded considerably, with projects being und
Jan 1, 2006
-
Development of an explosive energy distribution optimization system to accommodate drilling errors by adjusting blasthole charges APCOM 2021By M. S. Shishvan, S. Klerkx, J. Sattarvand
The inaccurately drilled blastholes from the planned locations cause changes in the spatial distribution of explosive energy; some areas of the blast may receive a surplus of explosive energy, while o
Sep 1, 2021
-
A Review Of The Sequential Grid Mining Method Employed At Elandsrand Gold MineBy M. F. Handley
Sequential grid mining has been employed as the primary mining strategy at the AngloGold West Wits Elandsrand Mine since the inception of stoping operations from the sub-vertical shaft system in 1988.
Jan 1, 2000
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? SynopsisBy T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
UG2 pillar strength: Verification of the PlatMine formulaBy B. P. Watson, A. Carpede, W. O. Kekana, N. Fernandes, W. Theron, M. P. Mahlangu, G. Betz
The research described in this paper was done to confirm the Upper Group 2 (UG2) PlatMine peak pillar strength formula (Watson et al., 2007), which was determined from a back-analysis of failed and un
Aug 1, 2021
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
Selective dispersion-flocculation and flotation studies on a low grade copper ore, L. Mweene and S. SubramanianBy S. Subramanian, L. Mweene
A siliceous low-grade copper ore from Mpanda Mineral Field (MMF), located in south west Tanzania consisting of SiO2 (58.3%), Fe (10.4 %) and Cu (0.9 %) was initially subjected to selective dispersion-
Jan 1, 2020
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003
-
Reductant Characterisation And Selection: Implications For Ferroalloys ProcessingBy R. Khanna, M. Dubikova
A variety of carbonaceous reducing materials are being used for the production of ferroalloys. Reductant materials include not just carbons such as coke, coal, char but also bio-carbons in form of cha
Jan 1, 2004
-
Gold - The Ultimate MetalBy R. A. Plumbridge
The Honourable Mr Molefe, Premier of the North- West Province; Or Scot-Russel, Chairman of the CMMI's XV Congress; Mr Loton, Chairman of the CMMI; distinguished guests, ladies and gentlemen. At
Jan 1, 1994
-
Coupled hydromechanical modelling of surface subsidence in crystalline rock masses due to tunnel drainageBy C. Zangerl, K. F. Evans, S. Loew
ABSTRACT: Settlements above fractured crystalline rock masses are rarely observed and in the past, geotechnical engineers would not expect substantial subsidence to occur in association with a deep tu
Jan 1, 2003
-
The Development Of A Standalone Computer Simulation Tool For The Optimization Of Gypsum Recovery At AfmineBy C. Maree
Paper written on project work carried out in partial fulfilment of B. Eng (Chem. Eng.) This paper describes the development and use of a process simulator to optimize gypsum recovery at Afmine, a s
Jan 1, 2005
-
Surface Auger Mining At Rietspruit Mine Services (Pty) LtdBy M. J. Lukhele
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree A number of high wall mining methods were developed over the years to mine coal reserves expos
Jan 1, 2002
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
Continuous Blasting Improvements At Landau Colliery ? SynopsisBy M. Rakoma
Following the blasting fatality on 17 December 2009, Landau Colliery was forced to change from the blasting practices that had been utilized since the start-up of the mine. Since then, attempts have b
Jan 1, 2013
-
Risk In Project Preparation - ?Determining The Project Needs And The Effects On The Management Strategy?By A. M. Clegg
In general, overall experience has shown that the approach to the appointment of a project manager is given much attention, but little specific attention is given first to the risk associated with the
Jan 1, 2005
-
"Pipeline Integrity Using The External Corrosion Direct Assessment (Ecda) Methodology: A Case Study" - 1. IntroductionBy Chris Ringas
The safe operation of gas transmission pipelines is increasingly coming under the spotlight. Increasing environmental pressure is also forcing pipeline owners and operators to ensure the integrity of
Jan 1, 2006
-
Iron slag dump material and leachate treatmentBy A. C. Moorgas, J. Divall
This study investigates the feasibility of using waste iron slag, the by-product from a mineral sands processing works, in road construction. The study includes the different options investigated for
Jan 1, 2003
-
Modelling of fluid flow phenomena in Peirce-Smith copper converters and analysis of combined blowing conceptBy D. K. Chibwe, P. Taskinen
"Typical operation of industrial Peirce-Smith converters (PSCs) used in copper smelting results in several common phenomena such as excessive splashing, slopping, tuyere blockage, and low converter ca
Jan 1, 2014
-
Case Studies Of Simultaneous Mining And Mineral Processing Optimization Applied To Platinum And Nickel OperationsBy S. Burks
This paper develops the themes explained at the previous SAIMM Platinum conference by Whittle and Burks1. Optimization techniques can be used to significantly increase the value of mining businesses b
Jan 1, 2012