Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pit Slope Design And Risk ? A View Of The Current State Of The ArtBy T D. Sullivan
Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit
Jan 1, 2006
-
A Follow-Up Report on Longwall Coal Mining at Durban Navigation Collieries (Pty.) LimitedBy M. J. Deats
INTRODUCTION To prepare the reader adequately, reference should be made to the paper 'The Pioneering of Fully Mechanized Longwall Coal Mining in South Africa' by R. T. Naude and M. J. Deats
-
A Century Of Migrant Labour In The Gold Mines Of South AfricaBy J. S. Harington
Our purpose is to record and to explain the widely changing numbers of the huge total of black workers on the gold mines of South Africa over the century from 1896 to 1996. These men were recruited fr
Jan 1, 2004
-
Minable coal reserve estimation by incorporating tonnage and calorific value uncertainties by successive multiple-point and two-point geostatistical simulation algorithmsBy S. Chatterjee, F. Suparno, A. Paithankar
Estimating reserves and quantifying resources stand as pivotal and intricate endeavours within the realm of coal mining operations. Intricate geological formations compound the challenges in resource
Oct 2, 2025
-
Selective dispersion-flocculation and flotation studies on a low grade copper ore, L. Mweene and S. SubramanianBy S. Subramanian, L. Mweene
A siliceous low-grade copper ore from Mpanda Mineral Field (MMF), located in south west Tanzania consisting of SiO2 (58.3%), Fe (10.4 %) and Cu (0.9 %) was initially subjected to selective dispersion-
Jan 1, 2020
-
Optimized dolomite upgrading, T. Mütze, T. Fraszczak, O. Ortlepp, and U.A. PeukerBy T. Fraszczak, U. A. Peuker, T. Mütze, O. Ortlepp
Dolomite is a calcium carbonate sedimentary rock that can be found all over the world. In its calcined form it is employed for water treatment or as an additive in iron production. Calcined dolomite i
Jan 1, 2020
-
A Review Of The Sequential Grid Mining Method Employed At Elandsrand Gold MineBy M. F. Handley
Sequential grid mining has been employed as the primary mining strategy at the AngloGold West Wits Elandsrand Mine since the inception of stoping operations from the sub-vertical shaft system in 1988.
Jan 1, 2000
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? SynopsisBy T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
The Beneficial Effects Of Feeding Dry Copper Concentrate To Smelting Furnaces And Development Of The DryersBy S. L. Chen
Keywords: copper, concentrate drying, steam dryer, dryers By placing additional demands on energy and gas flow, the moisture content of a copper concentrate has an adverse effect on the smelting p
Jan 1, 2006
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
Using Stochastic Discounted Cash Flow And Real Option Monte Carlo Simulation To Analyse The Impacts Of Contingent Taxes On Mining Projects (60baa2dd-98b0-4282-96fe-2cac78fa8756)By M. R. Samis
The great variability of mineral and energy prices has motivated some governments to incorporate a windfall profits tax into their mineral taxation regimes. Windfall profits taxes are a means for gove
Jan 1, 2007
-
Auburn Furnace ServicesBy R. S. McDonald
Auburn began operations 40 years ago with an office in Sudbury, Ontario, Canada, to provide services to Inco Limited. Over the next 40 years, operations expanded considerably, with projects being und
Jan 1, 2006
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003
-
Gold - The Ultimate MetalBy R. A. Plumbridge
The Honourable Mr Molefe, Premier of the North- West Province; Or Scot-Russel, Chairman of the CMMI's XV Congress; Mr Loton, Chairman of the CMMI; distinguished guests, ladies and gentlemen. At
Jan 1, 1994
-
Coupled hydromechanical modelling of surface subsidence in crystalline rock masses due to tunnel drainageBy C. Zangerl, K. F. Evans, S. Loew
ABSTRACT: Settlements above fractured crystalline rock masses are rarely observed and in the past, geotechnical engineers would not expect substantial subsidence to occur in association with a deep tu
Jan 1, 2003
-
Development of an explosive energy distribution optimization system to accommodate drilling errors by adjusting blasthole charges APCOM 2021By M. S. Shishvan, S. Klerkx, J. Sattarvand
The inaccurately drilled blastholes from the planned locations cause changes in the spatial distribution of explosive energy; some areas of the blast may receive a surplus of explosive energy, while o
Sep 1, 2021
-
Reductant Characterisation And Selection: Implications For Ferroalloys ProcessingBy R. Khanna, M. Dubikova
A variety of carbonaceous reducing materials are being used for the production of ferroalloys. Reductant materials include not just carbons such as coke, coal, char but also bio-carbons in form of cha
Jan 1, 2004
-
The Development Of A Standalone Computer Simulation Tool For The Optimization Of Gypsum Recovery At AfmineBy C. Maree
Paper written on project work carried out in partial fulfilment of B. Eng (Chem. Eng.) This paper describes the development and use of a process simulator to optimize gypsum recovery at Afmine, a s
Jan 1, 2005
-
UG2 pillar strength: Verification of the PlatMine formulaBy B. P. Watson, A. Carpede, W. O. Kekana, N. Fernandes, W. Theron, M. P. Mahlangu, G. Betz
The research described in this paper was done to confirm the Upper Group 2 (UG2) PlatMine peak pillar strength formula (Watson et al., 2007), which was determined from a back-analysis of failed and un
Aug 1, 2021
-
Surface Auger Mining At Rietspruit Mine Services (Pty) LtdBy M. J. Lukhele
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree A number of high wall mining methods were developed over the years to mine coal reserves expos
Jan 1, 2002