Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Study of Linear Waves on Linear Shaped Charges

    By G. Walsh, M. T. Wild

    In this paper the performance effects of linear shaped charges will be discussed. Different sized charges were tested and reviewed based on their performance used with a typical detonation method vs.

    Jan 1, 2011

  • ISEE
    The Didcot Demolition

    By R. Alford

    In the modern world of demolition safety is paramount and unnecessary or unquantifiable risks are not accepted (FasterCapital, 2024) and all risks must be kept As Low As Reasonably Practicable (ALARP)

    Jan 21, 2025

  • ISEE
    Blasting Seismographs: Transfer Functions, Standards and Accuracy

    "In this work a blasting seismograph was tested on a vibration shaker controlled by a single-point laser Doppler vibrometer (LDV). A total of 43 tests were made to measure the transfer properties(tran

    Jan 1, 2017

  • ISEE
    Changes Contained In Amended ATF P 5400.7, Also known as the "Orange Book"

    By ATF Publications

    The following is a summary of the changes that were incorporated into the new Federal Explosives Regulations, 27 CFR Part 55, dated 9/2000. However, in light of the recent events of September 2001, a

    Jan 1, 2002

  • ISEE
    Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta’s West End CSO Tunnel Project

    By Adam Stremcha, John MacGregor

    Initial planning called for 3 separate drop shafts and 3 separate vent shafts to be pulled back from the excavated tunnel with a large diameter raise bore machine. With time constraints and the raise

    Jan 1, 2010

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    A New Method to Calculate the Frequency Associated with the Peak Particle Velocity of the Vector Sum

    By Ruilin Yang

    The vector sum peak particle velocity (PPV) of blast vibrations describes the blast vibration intensity more completely than the PPV of a single component waveform. It is more logical to use a vector

    Jan 1, 2015

  • ISEE
    Improving Drilling and Blasting By Using TQM and Appropriate IT

    By John Hutchings

    Drilling and blasting is a clearly delineated work process, which has well defined inputs and outputs. Drilling and blasting is also a process with a number of steps each of which has measurable outco

    Jan 1, 2004

  • ISEE
    The Use of Computer Based Blasting Models in Mine Feasibility Analyses (d77e0f44-d5f8-4a76-8875-d772b7b19692)

    By George Boucher, Simon Williams, Neil McBride

    "The aim of these analyses was to utilise the latest available production information for the Wandoooperation to determine the optimal blasting parameters, costing’information and predicted results(fr

    Jan 1, 1998

  • ISEE
    History of the Development and Use of Bulk Loaded Explosives, from Black Powder to Emulsions (4e042d52-81d4-408b-9ff9-49bce6caf7ef)

    By Robert B. Hopler

    Emplacing explosives in the borehole by bulk methods is utilized today for about 35% of all of the explosives used in the United States. Although different from today's methods, some bulk emplacement

    Jan 1, 1992

  • ISEE
    Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method

    By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada

    The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac

    Jan 1, 1996

  • ISEE
    3000t Controlled Chamber Standing Shot

    By He Guangyi

    Combining living examples, the paper introduces the controlled chamber standing shot of more than 3000t explosives initiated at one time with Nonel under complicated circumstances and the experience o

    Jan 1, 1998

  • ISEE
    Continuing Improvements in Longhole Stoping at the Bulyanhulu Mine

    By P. O'Connell, J. Lever, C. Clemence

    The Bulyanhulu Mine, Tanzania is constantly trialing ideas for improvements in the drill and blast process. The project work has resulted in a large number of choices in explosive type and charging me

    Jan 1, 2006

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023

  • ISEE
    Blasting in the New Mellinnium: Are We Learning from Mistakes

    By Steve Dillingham

    There are some blasters and blasting companies that just seem to have better safety reputations than others. This is in spite of the fact that they are essentially doing the same type of work under si

    Jan 1, 2003

  • ISEE
    Blasting in the New Mellinnium: Reactive Versus Proactive SafetyYou Decide

    By Steve Dillingham

    Change occurs all of the time. In fact, it’s fair to say that change is a constant. Sometimes the change is inconsequential, but sometimes the change impacts us d i rectly and severely. Take regulatio

    Jan 1, 2003

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Development of charging machine for cartridged explosives

    By Minoru Kawamura, Shinya Tanaka

    In Japan, a cartridged emulsion explosive is generally used for tunneling. The workers are compelled to approach the face on charging the explosives into the drill hole with the tamping rod. Therefore

    Jan 1, 2008

  • ISEE
    ROCSCAN: A Multipurpose Geomechanics Instrument

    By D Frantzos, J J. Cotter, H Tammemagi, J B. Codrington, J Kaasalainen, A C. Webster

    "Exploshres Technologies International (ED) is developing an instrument called ROCSCAN which isplanned to have broad application in both blasting and rock mechanics. The purpose of this paper is to ou

    Jan 1, 1989