  • ISEE
    Quality-Assurance (to ISO-9001 Level) for Quarry Blasting in the Urban Environment

    By Wilfrid Comeau

    This paper deals with the concept of a Quality-Assurance Manual, to the ISO-9001 Level, for quarry blasting in the urban environment. A case history of the incident, which led to its development, is p

    Jan 1, 2003

  • ISEE
    Construction Up Raises with TH perforation

    By Iván Aguirre Palacios, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, mining operations seek to be competitive in the market. To achieve this, one of the relevant factors is to maintain and improve the productivity of the extractive processes, mainly the load

    Jan 26, 2026

  • ISEE
    200 Blasting in the New Millennium - The Cold Hard Facts About Winter Driving for Blasters

    By Ann Barron

    For millions of people, cold weather is a fact of line – and one that can make a major challenge out of just getting to work. But for those working in the blasting industry, a number of obstacles are

    Jan 1, 2004

  • ISEE
    The Advantages of Recycled Oil in Blasting, a Refreshing Approach

    By Joseph Daly

    This is the detailed evaluation of the establishment and implementation of an ‘oil recycle plant’ located on site at Boggabri Mine NSW, (Australia); its production, its use and its value. Also discuss

    Jan 1, 2014

  • ISEE
    Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) Pipeline

    By John Babcock, Bryan C. Smith

    In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab

    Jan 1, 2019

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    Risk Criteria for Quantitative Risk Assessment

    By John Meuth, Brandon Fryman, P. E. Hoffman, Joshua Ph. D., P. E. Calnan, Josh Ph. D.

    Quantitative Risk Assessment (QRA) can be specifically tailored for use by the commercial explosives industry to calculate risk to employees and the public from commercial explosives facilities and op

    Jan 1, 2019

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • ISEE
    The Evolution of Mining and Drilling and Blasting Practices in Ghana

    By Stanton Johnson

    Africa has a long history of mining and has been one’of the world’s greatest sources of gold and other mineral resources since the days of the Egyptian pharaohs. Mining in Africa has been dominated by

    Jan 1, 1998

  • ISEE
    Environmentally Motivated Tracking of Geologic Layer Movement During Bench Blasting Using Discrete Element Methods

    By Dale S. Preece

    The blast-induced movement and final location of geologic layers that may cause environmental problems can be predicted using discrete element methods. This prediction capability can be used by mine o

    Jan 1, 1994

  • ISEE
    Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast Hole

    By Lifent Li, Jhon Silva-Castro

    Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init

    Jan 1, 2015

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis Davidsavor, David Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

  • ISEE
    Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.

    By Robert Hopler

    As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par

    Jan 1, 2006

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders

    By Daniel Hauer

    In considering the cost of rock excavation, but little attention has been given to the economical handling and breaking up of boulders. Very few records seem to have been kept as to the cost of such w

    Jan 1, 2006

  • ISEE
    Lightning Detection Technology and Early Warning Systems for Thunderstorms, Including Applications

    By William C. Geitz

    "Lightning has always posed a serious threat to blasting operations, especially wkhin the mining and construction industries and operations involving the manufacture, transport, storage and handling o

    Jan 1, 1991

  • ISEE
    Study on Safe Criterion of Blasting Excavating Oil-Gas Pipeline Ditches

    By Qi Shifu, Guo Tao, Liu Haoquan, Yao Chaogui, Zheng Li

    Abstract: To excavate oil-gas pipeline ditches in a rocky region or area the explosive method is needed. When a parallel ditch is to be dug by blasting near or in the vicinity of an existing pipeline,

    Jan 1, 2014

  • ISEE
    Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced Seismic

    By Wenbo Lu

    A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua

    Jan 1, 1999

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003

  • ISEE
    A Methodology to Control Peak Particle Velocity Levels at Multiple Locations by use of Electronic Detonators

    By W. J. Birch, D. Leckenby, R. Farnfield

    The use of electronic detonators to improve fragmentation is becoming universally accepted. However their use in limiting peak particle vibrations levels is still in its infancy. Most of which is anec

    Jan 1, 2007

  • ISEE
    Laser Initiation of Explosives (For Use in Conventional Electric, Nonelectric and Electronic Detonators)

    By Don Novotny, Dana Spencer

    In this workshop our intent is quite simple; that is that we will introduce a relatively new technology that may have applications in blasting applications. This technology is the laser initiation of