Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting Techniques to Control Roof Failure in an Underground Limestone Mine

    By Mike Koehler

    An underground mine that produces aggregate limestone was in operation for approximately eight years when geological changes resulted in dangerous rock falls. The roof in the mine was not bolted; ther

    Jan 1, 2002

  • ISEE
    Benefits of Hercduct in Construction Blasting

    By Thomas C. Jones

    The purpose of this paper is to disseminate new information for nonelectric blasting in trenching and construction work. The presentation is not designed or intended to discredit conventional electric

    Jan 1, 1984

  • ISEE
    The Application of GPS Positioning and Drill Monitoring Technology

    By Carl Hendricks

    AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of

    Jan 1, 2002

  • ISEE
    Fragment Size Distribution Assessment Using a Digital Image Based Measurement System

    By Mark S. Stagg, Stephen A. Rholl, Steven G. Grannes

    A method of determining the fragment size distribution of rock quarry muckpiles using photographic and digital-image processing techniques has been developed by the Bureau of Mines. To assess the frag

    Jan 1, 1993

  • ISEE
    Precision-Scale High-Explosive Water Shock Experiments

    By Charles E. Joachim, Christo V. Lunderman, Charles R. Wdch

    The U.S. Army Engineer Waterways Experiment Station (WES) recently conducted a series of precision-scale water shock experiments which consisted of the detonation of several 8-gram, 10-gram, and 12-gr

    Jan 1, 1998

  • ISEE
    Unusual Accidents Caused by ESD

    By James G. Stuart

    For precise control and timing of a blast, people use electric detonators. Most of these contain a fine metal “bridgewire,” that heats to the required burning temperature when electric current passes

    Jan 1, 2005

  • ISEE
    Backstoping with Millisecond Delay Timing at the Sunshine Mine, Kellogg, Idaho

    By Dale Nies

    In the past, cap and fuse has been the only economical and efficient initiation system capable of providing sequential timing, ease of loading and hookup, and unlimited borehole number for backstope r

    Jan 1, 1989

  • ISEE
    Safety Assessment of Hot Emulsion Matrix (Evaluation with large fallhammer test device and DDT test method)

    By Kunihisa Katsuyama, Yuji Ogata, Takuya Taguchi, Toshinori Arikiri, Yuji Wada, Kiyoshi Hashizume

    The impact sensitivity of hot emulsion matrices was examined to investigate the safety assessment in the emulsifying equipment which forms the emulsion matrix in a water-in-oil type emulsion explosive

    Jan 1, 1997

  • ISEE
    Strategy, Innovation and Change - Challenging the Future at the Gregg River Mine

    By Rick W. Bellenie, Ronald L. Woolf

    The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.

    Jan 1, 1994

  • ISEE
    Emulsion Performance Evaluation

    By R W. Givens

    This paper discusses emulsion performance and characteristics. Also presented are pattern design equations by a weight strength method, a "Q" factor method, and a coupled energy powder factor (CEPF) m

    Jan 1, 1989

  • ISEE
    Blasting with Used Oil/Diesel Blend at Echo Bay Minerals - McCoy/Cove Mine

    By Sally Lynn Zadra

    "In May, 1994, Echo Bay Minerals - McCoy/Cove Mine petitioned for approval to recycle used oil formanufacturing ANFO. Recycling oil in this way will result in a cost savings for the minesite as well a

    Jan 1, 1996

  • ISEE
    Controlled Blasting Methods for Excavation of Rock and Concrete in Critical Locations

    By Gordon Revey

    In construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blasting, contracto

    Jan 1, 2001

  • ISEE
    The Development of a Low Shock Energy Ammonium Nitrate Based Explosive (719231f0-e844-434c-a59b-03c7b4557859)

    By Jaki M. Wilson, Neville T. Moxon

    The detonation pressure of ANFO can be significantly reduced by the addition of low density materials such as polystyrene, bagasse, sawdust or perlite. Laboratory and field test results have shown tha

    Jan 1, 1989

  • ISEE
    Mine Closure For Public Safety While Creating Endangered Species Habitat

    By Dale Ramsey

    Located in the Chestnut Ridge Mountains of Southwestern Pennsylvania, the Casparis mine named for the founder Kenneth Casparis operated from 1916 until the early 1950. producing crushed stone for cons

    Jan 1, 2006

  • ISEE
    Evaluation of Safety Against Lightning in MBS

    By Koichi Kurokawa, Takeo Ueda, Masahi Nakano, Yoji Tasaki

    A lightning strike generates several 10kA and several billion volts, and earth currents generated by lightning is dangerous to some underground and all surface blasting operations. In order to evaluat

    Jan 1, 1988

  • ISEE
    Blast Evaluation at the Minntac Mine

    By Jack Eloranta

    This paper describes a method of evaluating shot performance through the use of available mine- data. The mine had already been monitoring the following parameters for other purposes: drill penetratio

    Jan 1, 1993

  • ISEE
    Application of Air Decking to Blasting - Finding from Numerical Modelling

    By P. D. Katsabanish

    Air decking applications are examined using numerical modelling and the AutodynTM code. The mechanism of damage is illustrated and discussed. Air decking is shown to provide advantages over stemming w

    Jan 1, 2005

  • ISEE
    The Application of the Super Video Camera and VCR Equipment with Editing Capabilities to the Analysis of Commercial Blasting Operations

    By Floyd W. Crump

    New technology in video equipment, such as Super Video Tapes, Super Video Camera Recorders equipped with high speed electronic shutters, and VCR's with editing capabilities make it possible to resolve

    Jan 1, 1991

  • ISEE
    Improved Methods of Blasting Concrete for Welland Canal Rehabilitation

    By Ray Jambakhsh, Craig Copping

    The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contract

    Jan 1, 1994

  • ISEE
    Overbreak Control in the White Pine Underground Mine

    By Virgil J. Stachura, Larry R. Fletcher, Matthew N. Plis

    Falls of ground remain a leading cause of fatalities and injuries in underground mines. In response to this situation, the Bureau of Mines conducted a series of experiments in the White Pine room-and-

    Jan 1, 1989