Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
String Loading at ValeBy Jennifer Paukula, Steven Lindsay, S. Joon Kim
String loading is the placement of a bead or ‘string’ of emulsion along the lower edge of a development drill hole. The loading hose extraction rate controls the amount of emulsion placed in each dril
Jan 1, 2012
-
Pneumatic Loading of ANFO UndergroundBy J J. F Smith
The application of pneumatically loaded ANFO for underground mining has continued to increase year by year since the technique was first developed and introduced underground during the early 1960's. I
Jan 1, 1982
-
Production Blasting and the Development of Open Pit Slopes (8e693b17-abb0-4b98-9d31-35dc00c5ce79)By John P. Ashby
Production blasting is a process of destruction of rock masses in order that ore may be extracted. Many open pit operations are faced with the apparently conflicting requirements of providing large qu
Jan 1, 1980
-
Building and Structural Blasting in HungaryBy Sandor Nagy
The Explosive and Blasting Department of the Hungarian Mining Research Institute is responsible for the research and development of industrial applications of explosives. Appropriate explosives techno
Jan 1, 1977
-
Blasting Factors Influence the Choice of Blasthole Size for QuarryingBy N L. Thomas
Hole size affects many factors which directly influence fragmentation in the muckpile and hence, the cost effectiveness of the entire operation. These factors include production capability, explosives
Jan 1, 1986
-
The Application of Pumpable Emulsions in Narrow Reef StopingBy Selwyn Pearton
Pumpable emulsion explosives have been available to surface and underground massive mining operations for decades and through their unique properties offer significant advantages through improved safe
Jan 1, 2015
-
A Delay Sequencing Blasting SystemBy D O. Tan Sky
This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show
Jan 1, 1980
-
Blasting Accidents in MiningBy Michael A. Peltier, Dennis V. D'Andreal, Larry R. Fletcher
Accident data obtained from the Mine Safety and Health Administration (MSHA) were analyzed by the Bureau of Mines to determine the most frequent causes of blasting accidents in U.S. mining and to exam
Jan 1, 1987
-
Reinforced Concrete Structure Failure Mechanisms Resulting from Explosively-Induced OverpressureBy Dale Preece, Vanessa Berg
This paper presents a two-pronged vulnerability analysis approach for treating minimally reinforced concrete (RC) structures subjected to explosive events. This work was motivated by a heightened inte
Jan 1, 2004
-
An Engineering Model for Predicting Rubble Motion During BlastingBy J T. Schamaun
Recent applications of explosives and blasting agents to rubble rock have led to requirements for more elaborate design and analysis methods. In most blasting uses, it is necessary not only to fractur
Jan 1, 1983
-
Streamlining Processes, Increasing Security, Productivity, and Process Transparency by Using Digital Logistics Solutions within the Supply Chain of Civil ExplosivesBy Frank Hirthammer
Over the past few years, development and implementation of digital logistics solutions has convinced users of many additional advantages of this technology. Barcode labeling and reading increases the
Jan 1, 2018
-
Some Aspects of Design and Evaluation of Perimeter Control Blasting in Fractured and Weathered RockBy Andrew F. McKown
Overbreak and damage to rock walls at the perimeter of rock excavation can lead to safety problems due to rock falls and additional costs due to a] extra mucking, b] extra concrete or shotcrete to bac
Jan 1, 1984
-
Evaluation of Velocity of Detonation of Permitted ExplosivesBy R R. Singh, U K. Dey, S K. Roy
"Commercial explosives being a heterogeneous mixture of many chemical compounds in prefixed proportion, their velocity of detonation (VOD) may vary from batch to batch, due to variations in the propor
Jan 1, 2007
-
CO Migration from Trench Blasting in Amherst, New YorkBy Marcia Harris, Richard Mainiero
The New York State Department of Transportation recently commenced highway widening and drainage improvement projects in Clarence and Amherst, NY. Drainage improvements including the installation of s
Jan 1, 2004
-
Blast Preconditioning – A Development and Operational ChallengeBy Jeff Gore, Jack Dermody, David Gribble, Brett Macaulay, Bart Sharpe, Paul Klaric, Paul Thornley, Ben DeVries
Optimal Fragmentation in Block Caving is difficult to achieve as it is generally defined by the rock mass itself and the way in which the cave is initiated. The lower portion of the cave has even less
Jan 1, 2013
-
Ground Preparation Planning for Surface Mine Excavating PracticeBy Malcolm Scoble
The estimation of digging, ripping and blasting requirements in advance of mine production is a difficult task. The characteristics of the superficials and rock mass govern the type and intensity of g
Jan 1, 1985
-
Journal: 20th Annual Photo Contest / Boiler HouseBy Ryan Redyke, Jared Redyke
The demolition of an old power plant boiler house in Parsons, Kansas calls for the use of some linear shaped charges. The steel is thick and the structure is heavy but gravity can be a blaster’s best
Jan 1, 2015
-
Improving the Amount of Material Cast at Highvale Mine Using Electronic DetonatorsBy Robert Slivinski, Kyle Hobbs, Michael Stern, John Willox, Brad Jewson
Prairie Mines & Royalty Ltd. produces over 12 million tonnes annually of thermal coal for TransAlta’s Sundance and Keephills power stations from the Highvale Mine. This opencast mine is next to a lake
Jan 1, 2008
-
The Use of Seismic Measurements to Determine the Blastability of RockBy R R. Dimock
A goal of all mine operators is to optimize the breakage of the inplace rock to achieve maximum excavating efficiency. The use of the seismograph at Kennecott Copper Corporation's Nevada Mines Divisio
Jan 1, 1976
-
Using Digital Electronic Detonator of Blasting LS and LDT BuildingsBy Zheng Deming, Li Hongwei, Lei Zhan, Dai Chunyang
This paper introduces the application of a digital electronic detonator in the demolition blasting of largescale (LS) and long delay time (LDT) frame-shear structure buildings. The whole building to b
Jan 1, 2019