Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drivability Of Piles By VibrationBy Don C. Warrington
This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving
Jan 1, 1989
-
On Driven Piles In Coralline Deposits: A Selected Case From The Red Sea Coast Of Saudu ArabiaBy Waddah Akili
At an offshore site along the Red Sea coast of Saudi Arabia, marine structures were supported on tubular steel piles driven into coral and coral contaminated sands and silts. Surprises and disappointm
-
Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987
-
Vertical Load Sharing of Piled Raft with Grid-Form Deep Mixing WallsBy J. Hamada, K. Yamashita, Y. Shigeno, T. Tanikawa
"This paper offers a case history of piled raft foundation in soft ground supporting a twelve-story building in Tokyo. To increase bearing capacity of the soft soil as well as a countermeasure of liqu
Jan 1, 2015
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
What Causes Piles To Penetrate - IntroductionBy George G. Goble
In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en
Jan 1, 1995
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The ProjectBy D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Ground Improvement by Dry Concrete ColumnsBy Tatiana Tronda
"The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati
Jan 1, 2016
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of ShanghaiBy Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban DevelopmentsBy Abid Adekunte
"Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa
Jan 1, 2017
-
PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation SubcontractorsBy Alexander Filotti, Richard Kalson
"1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti
Jan 1, 2017
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
2D Analysis Of The Seismic Behavior Of Inclined MicropilesBy Seyyed Mehdi Radeghi Mehrjou
The current work investigates the behavior of inclined micropiles under seismic loads. The dynamic finite element method (FEM) was employed. Rayleigh damping was applied to the soil, and elastic beam
Sep 1, 2022
-
Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, CaliforniaBy Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa
"The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un
Jan 1, 2015
-
Soil-Cement Columns For Building FoundationsBy Osamu Taki
The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are
Jan 1, 1992
-
Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality ControlBy Rudolph P. Frizzi
Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou
Jan 1, 2005
-
Is the use of Residual Strength Justified in Excavation Support Design?By George Aristorenas, Carlos Englert, Jesús Gómez
"Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de
Jan 1, 2015