Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                     Radium Hospital Project In Oslo, Norway Radium Hospital Project In Oslo, NorwayBy Wojciech Szczepiński, Dominik Gächter In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau Oct 1, 2021 
- 
                     Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey Soil Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey SoilBy Murad Y. Abu-Farsakh This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me Jan 1, 2018 
- 
                     Capitol Complex Phase 1 Expansion Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par 
- 
                     EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1 EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1By EFFC/DFI Concrete Task Group Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif Jan 1, 2016 
- 
                     Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test Data Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test DataBy Ramin Motamed, Joseph A. W. Toth Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte Jan 1, 2018 
- 
                     Increase In Shear Modulus By Soil Mix And Jet Grout Methods Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc Jan 1, 2008 
- 
                     The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban EnvironmentBy James E. Parkes The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station Jan 1, 2011 
- 
                     Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM) Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann "Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve Jan 1, 2017 
- 
                     Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland Examples Of The Use Of Temporary Works Soil Nailing In The UK And IrelandBy Martin J. Pedley The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c Jan 1, 2000 
- 
                     Current Pile Foundation Practice In Taiwan ? Synopsis Current Pile Foundation Practice In Taiwan ? SynopsisBy Za-Chieh Moh This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize Jan 1, 1996 
- 
                     Complex Piling Works At London Blackfriars Station Complex Piling Works At London Blackfriars StationBy Jamie D. McEwan To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui Jan 1, 2011 
- 
                     The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded Jan 1, 1996 
- 
                     Pile Driving Dilemma: Reducing Noise, Vibrations Pile Driving Dilemma: Reducing Noise, VibrationsBy Michael D. Justason "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de Jan 1, 2012 
- 
                     Linking the Installation Response of Screw Piles to Soil Strength and Ultimate Capacity Linking the Installation Response of Screw Piles to Soil Strength and Ultimate CapacityBy James P. Hambleton, Sam A. Stanier A perceived advantage of screw-type foundations is the ability infer aspects of foundation performance from quantities measured or observed during installation, especially the installation torque. A p Jan 1, 2019 
- 
                     The Deep Cut-Off at the Walter F. George Dam The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow Jan 1, 2014 
- 
                     Drilled Shaft Difficulties and a Micropile Solution Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were Jan 1, 2018 
- 
                     Holding Back The Watchung Mountains Holding Back The Watchung MountainsBy Ryan C. Linthicum A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains Jan 1, 2003 
- 
                      
- 
                     Low Strain Integrity Testing Of Deep Foundations ? Introduction Low Strain Integrity Testing Of Deep Foundations ? IntroductionBy Jay A. Berger Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me Jan 1, 1990 
- 
                     Differing Site Conditions Differing Site ConditionsBy James J. Tansey A Deep Foundations Institute meeting with the University of Michigan at Ann Arbor in March of 1984 featured legal rights under Differing Site Conditions. A workshop conducted by the authors and Gerard Jan 1, 1985 
