Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f
Jan 1, 2013
-
Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Errata (5268ac87-18a9-458e-b334-4f72060324e3)Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'
Jan 1, 1994
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) MethodBy Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
Unified Specifications for Soil-Mixed Seepage Cutoff WallsBy Wayne S. Smith, Erik James, Jose R. Gomez
"Soil mixed seepage cutoff walls are increasingly being used in levee and dam modification projects nationwide. An important aspect of their overall quality depends greatly on the language included in
Jan 1, 2016
-
Verification of Installation and Performance of ACIP Piles for BridgesBy W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
Design of Pile Foundations in Liquefiable, Laterally Spreading GroundsBy Arash Khosravifar
One of our research thrusts at Portland State University (PSU) centers on developing design guidelines for pile foundations in liquefiable, laterally spreading grounds. This research has been primaril
Nov 1, 2023
-
Application Of Deep Foundation Structures To Great Bridges In VietnamBy Cau T. Bui
Thanks to Doi-moi (renovation) policy, many great bridges were constructed in Vietnam to meet demands of her booming economy in the recent decade and deep foundation structures were the only alternati
Jan 1, 2008
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Dynamic Lateral Response Of A Full-Scale Pile GroupBy Kyle M. Rollins
To improve our understanding of lateral resistance of pile groups, a series of lateral load tests were performed on a full-scale pile group using both static and dynamic loads. The pile group consiste
Jan 1, 2002
-
Pile Driving Hammers In Centrifuge Modelling - SynopsisBy Daniel Levacher
Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install
Jan 1, 1996
-
Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving PermitsBy Alan Christopherson
Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med
Jan 1, 2013
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
CPT Role in Rigid Inclusion Design and Quality AssuranceBy Jesus Gomez, Mary Nodine
Rigid inclusions are widely used in the U.S. as a ground improvement tech- nique, particularly for industrial, low- rise and highway applications with poor subsurface conditions, where control of sett
May 1, 2023
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Effect of Free Standing Height on Rock Socketed Pile under Lateral LoadBy Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan
"Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o
Jan 1, 2015
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice ArenaBy John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011