Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Plant Audit (97ca6ee7-2dc9-4753-846d-b993abc1472c)By A. J. Neale, B. C. Flintoff
"In most mineral processing operations the term audit is usually reserved for the exercise of checking financial records and/ or safety practices. While these activities are time consuming, no one dis
Jan 1, 1991
-
Conservation of Natural GasBy George R. Elliott
Introduction The pages that follow present a brief chronological survey of views which have been held, and of legislation enacted, for the regulation of the natural gas and oil industry in the Turner
Jan 1, 1934
-
Modelling Secondary Crushing Plants for Teaching Purposes and Operator TrainingBy J. A. Meech, R. J. Tucker
"A dynamic computer model has been developed to simulate the operation of ore crushing plants. The model was created in a general form to allow imitation of a wide variety of secondary crushing circui
Jan 1, 1985
-
Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter ModernizationBy J. Suarez Condezo, E. Herrera Alarcon
The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show
Jan 1, 2007
-
Petroleum Possibilities of Nova ScotiaBy Donald J. MacNeil
THE opinion, based upon geological knowledge, that certain areas within the Province of Nova Scotia might yield commercial quantities of petroleum, is not new. It dates back to at least 1864, when the
Jan 1, 1945
-
In-Mine Measurements and Analysis of Ground Movements while Crossing a Geologic Fault Using a Longwall Mining MethodBy Joseph Hirschi, Behrooz Abbasi, Harrold Gurley, Yoginder P. Chugh
"The research goal was to assess if analytical tool/s can be developed to quantify displacements around a geological fault as longwall face moves toward it and past it. A company was faced with crossi
Jan 1, 2015
-
Development of the Rainy River Gold Project and Processing PlantBy Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016
-
The Development of Ultrafine Grained Steels through Thermomechanical ProcessingBy P. D. Hodgson, G. L. Kelly, H. Beladi
"The formation of ultrafine ferrite by strain induced transformation is assessed using rolling and hot torsion experiments. These experiments are used to examine the impact of thermomechanical process
Jan 1, 2004
-
Waste Management and Energy Savings through Extraction of Valuable Metals: Copper, Nickel and Cobalt from Sulphidic Tailings of Golgohar Iron Mine, IranBy M. Askari, A. Ahmadi
"This study was conducted to establish the possible application of bioleaching in the pilot scale to recover valuable metals from the sulfidic tailings of Golgohar Iron Mine (Kerman, Iran). Using biol
Jan 1, 2017
-
Fine Grinding of a Sparsely Disseminated Sulphide OreBy Augustine O. Orumwense, Micheline Boisclair
"The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ
Jan 1, 2008
-
Premier MineBy E. G. Langille
"The Premier mine; owned by Silbak Premier Mines; Limited; is 14 miles from Stewart at the head of Portland canal. Development of the property began in 1918; and since chat time a very large amount of
Jan 1, 1954
-
Calibration of On-Stream X-Ray AnalyzersBy Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly
"Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont
Jan 1, 1996
-
Choosing a SAG Mill to Achieve Design PerformanceBy Sami Hindstrom, Travis Orser, John Starkey
"A great deal of effort has been expended in the last 11 years by the authors and others to identify the correct power required to grind ore in a SAG mill, by developing ore hardness variability funct
Jan 1, 2003
-
Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)By G. McIsaac
"This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore
Jan 1, 2005
-
Long-term planning of an underground mine using mixed-integer linear programmingBy G. McIsaac
This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z
Sep 1, 2005
-
The Briquetting of Alberta CoalsBy W. A. Lang
"I.-IntroductionAn attempt bas been made in this paper to provide a basis for appraisal of the future of the coal briquetting industry in Alberta by outlining the processes used for briquetting variou
Jan 1, 1950
-
Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine LifeBy Kathy S. Kalenchuk
Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas
Jun 1, 2012
-
Traitement d'une magnétite titanifère pour produire la fonte, le pentoxyde de vanadium et le rutile synthétiqueBy Ivan Malinsky, Gérard Castonguay
"On a développé un procédé qui donne une fonte (2,3% C, 0,07% V) du V2O5 (99%) et un rutile synthétique (94% TiO2) à partir d'un minerai, dont les réserves au Québec sont importantes. Le procédé
Jan 1, 1983
-
-
A Numerical Modeling Method for Predicting Pit Slope Deformation and Failure Caused By Underground Mining under an Open-PitBy Gang Mei, Nengxiong Xu, Yanlin Zhang
After open-pit mining finishes, an iron mine with steeply inclined ore-bodies will generally transform to underground mining. Non-pillar sublevel caving method, with horizontal slice mining from up to
Jan 1, 2015