Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • CIM
    Milestones in the Mining Industry in Canada

    By John A. Allan

    Introduction There are times when meditation on the past is worth while. Too often does it happen that in the busy routine there appears t9 be little time for reflection, and little good or benefit t

    Jan 1, 1933

  • CIM
    A Mathematical Model of The Hydrocyclone Classifier

    By L. R. Plitt

    A series of experiments were carried out in an effort to develop a universally applicable mathematical model of the hydrocyclone classifier. The design and operating variables studied were: cyclone di

    Jan 1, 1976

  • CIM
    Magnesia from Canadian Brucite

    By M. F. Goudge

    BRUCITE associated with highly metamorphosed Precambrian limestone was discovered in the vicinity of Rutherglen in northern Ontario by the writer during field work on the limestones of that district i

    Jan 1, 1940

  • CIM
    Hot Workability of Mg Alloys ? Insights from Al Alloys

    By H. J. McQueen

    The irregular history of Mg wrought products is briefly described. The temperature and strain rate dependence of microstructural evolution, flow stress and ductility of Mg alloys in hot working, are d

    Jan 1, 2006

  • CIM
    Converting the Key Lake Mill Process for McArthur River Ore

    "The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri

    Jan 1, 2001

  • CIM
    Cerro Verde Concentrator ? Four Years Operating HPGRs

    By S. Koski

    The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper an

    Jan 1, 2012

  • CIM
    Mineral resource + engineering, economic and legal feasibility = ore reserve

    By M. Vallée

    Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio

    Jan 1, 2000

  • CIM
    Grinding Circuit Improvements at Barrick Cortez Gold Mine

    By James R. Wickens, David La Rosa, Robert E. McIvor, Adrian Dance

    "The comminution circuit at Barrick Cortez Gold Mine uses an open circuit primary jaw crusher followed by a standard SABC grinding circuit. The grinding circuit incorporates a 26’Ø x 11’ SAG mill, an

    Jan 1, 2009

  • CIM
    Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake

    By Peter A. Cain, John C. Folinsbee

    "A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the

    Jan 1, 1966

  • CIM
    Developments in Coal Mining -1969

    "The outlook for Eastern Canada is decreased coal production and for Western Canada increased production. The market for Western coal is expected to reach 40 million tons per year in metallurgical and

    Jan 1, 1970

  • CIM
    Observations and Numerical Back Analysis of an Excavation in the Queenston Mudstone

    By M. A. Perras, M. S. Diederichs

    "The Niagara Tunnel Project (NTP) is a 10.1 km long water-diversion tunnel in Niagara Falls, Ontario, which was excavated by a 14.4 m diameter tunnel boring machine. The excavated rock types included

    Jan 1, 2015

  • CIM
    Development Methods and Equipment at Lake Shore Mines, Limited

    By G. J. Birnie

    Introduction The preparation of the following paper has been undertaken in the belief that a description of the development methods and equipment used at Lake Shore, at the present time, will prove

    Jan 1, 1950

  • CIM
    Rebâtir, réparer et protéger les équipements industriels de l?usure

    By Iann Bouchard

    Introduction à l?abrasion et l?érosion Avec le temps, tout solide va éroder et user les métaux les plus durs; de plus, la Corrosion va aussi laisser une couche mince et faible d?oxydation qui sera ra

    Feb 1, 2008

  • CIM
    The Application of Crushers and Screens in the Mining Industry: More Art than Science

    By Fernando Romero Lage

    "Crushing and screening theory and application has remained fairly consistent in the last 50 years. The application of such equipment is guided by varied formulaic conventions and rules that due to th

    Jan 1, 2010

  • CIM
    Relationships between Structure and Mechanical Properties in a Die-Cast Am6ob Magnesium Alloy Component

    By J. P. Weiler

    The increasing use of high-pressure die-cast magnesium alloys in the automobile industry requires a better understanding of the mechanical properties, the microstructure, and particularly, the relatio

    Jan 1, 2006

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    The Lignite Deposit at Onakawana, Moose River Basin, Ontario

    By W. S. Dyer

    The lignite deposit at Onakawana on the Abitibi river is of particular interest at the present time, since the Ontario Government has recently decided to proceed with the extension of the Temiskaming

    Jan 1, 1930

  • CIM
    Leaching Characteristics of a Low-Grade Nickel-Bearing Ore Upgraded on the Falcon Concentrator

    By M. B. Shongwe, R. K. K. Mbaya, C. K. Thubakgale, P. Mendonidis

    "A low-grade nickel-bearing ore was pre-concentrated on a SB40 laboratory model Falcon Concentrator. Three size fractions, -212+125, -125+75 and -75 µm were tested with the intent to upgrade the nicke

    Jan 1, 2017

  • CIM
    Urban mining — Recycling gypsum waste in Vancouver

    By J. A. McCamley

    Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps

    Jan 1, 2004