Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Bottle Creek Au/Ag Deposit Ore Resource Calculation Procedures

    By Moeller T

    The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa

    Jan 1, 1987

  • AUSIMM
    Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wear

    By S Slouka

    Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a

    Oct 12, 2022

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product

    By Woodcock J. T, Zhu T, Sparrow G. J

    A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su

    Jan 1, 1991

  • AUSIMM
    Key insights for the successful implementation of proximity detection and collision avoidance technology for reducing vehicle interaction risk – a surface technology provider perspective

    By C Hoffmann

    Given that each year, 30–40 per cent of mining industry deaths are attributable to failures of vehicle interaction controls (EMESRT, 2023), the mining industry is now armed with a growing body of know

    Apr 16, 2024

  • AUSIMM
    Hydrothermal Alteration Zonation and Fluid Chemistry of the Southern Ridge and North Deposits at Mt Tom Price

    By S G. Hagemann, M E. Barley

    The Mt Tom Price deposit is a world-class high-grade hematite deposit in the Hamersley Province of Western Australia with an original resource of 900 Mt of almost pure hematite, averaging 63.9 wt per

    Jan 1, 2005

  • AUSIMM
    A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During Sealing

    By A Mackay

    As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b

    Jul 1, 2013

  • AUSIMM
    Geometallurgy Data Management – A Significant Consideration

    By V Liebezeit

    Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands

    Sep 5, 2011

  • AUSIMM
    A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal Mine

    By A Patwardhan, M M. Alam, K K. Thatavar

    A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-

    Jan 1, 2005

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013

  • AUSIMM
    Integrating Blastholes into Exploration Data to Improve Coal Recovery and Modelling

    By H Stedman

    Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c

    Aug 18, 2014

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    Application of Turbo Pulp Lifter in Greenfield Operation - Mirabela SantaRita Nickel Operation

    By A Moreira, A B. De Souza, S Latchireddi, E Faria

    Material transport plays a significant role in the efficiency of horizontal grinding mills - autogenous (AG)/semi-autogenous (SAG)/ball mills. The magnitude of benefits that can be achieved with effic

    Oct 29, 2012

  • AUSIMM
    Competitiveness of Australian Coal in Relation to Transport Distance

    By Gillies A. D S

    Rail, port and shipping charges represent 30 to 50 per cent of landed costs for Australian coal mines selling to Asia. This proportion is higher for sales to Europe, yet it is in Europe where Austra

    Jan 1, 1994

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    The New Iron and Steelmaking Process at New Zealand Steel

    This paper describes the new iron and steelmaking process recently commissioned at NZ Steel. Ironsand mined and concentrated at Waikato North head is slurry pumped 18 km to the company's Glenbroo

    Jan 1, 1986

  • AUSIMM
    Megablasts – Enabling Technologies in BHP Billiton Iron Ore

    By B Green

    With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed

    Aug 24, 2015

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    A Review of Recent Developments in the Process Mineralogy of Gold

    In reviewing recent developments in the process mineralogy of gold it is convenient to distinguish between visible (>0.1 pm) and invisible gold (1 - 2 pm in size in polished section; these can scan

    Jan 1, 1992