RI 5805 Development Of A 10,000-Ampere Cell For Electrorefining Titanium ? SummaryBy F. P. Haver
The Federal Bureau of Mines developed a 10,000-ampere cell to determine the economic feasibility of producing high-purity electrolytic titanium from mill scrap or offgrade sponge. Operating variables
Jan 1, 1961
-
Slope Optimization At Escondida Norte Open PitBy Manuel Rapiman, Ricardo Sepulveda
The feasibility study of Escondida Norte (ENorte), recommended a slope angle design for the Final Pit. But, according to the experience obtained with the slope adjacent to the West wall of ENorte, in
Jan 1, 2006
-
Land Rehabilitation at Golden Cross, Eight Years After Mine ClosureBy D Crequer
Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents
Jan 1, 2006
-
The Occurrence of Gold in the Broken Hill LodeThe smelting of the Broken Hill lead concentrates at the Broken Hill Asso,ciated Smelters produced, among other products, approximately 4,900 ounces of gold and 8,800,000 ounces of silver during the y
Jan 1, 1940
-
Teleoperated Cutting and Haulage For Thin Coal SeamsBy A. J. Kwitowski
Remote control is usually associated with deep mine, continuous mining machines. This is because thin-seam operation precludes an onboard operator's compartment or the mine has approval to conduc
Jan 1, 1992
-
Continuous Improvement And Teamwork Are The Keys To Success At Phoenix MineBy Scott Ellenbecker
The formation in Newmont Mining?s Phoenix Mine near Battle Mountain, NV contains high levels of abrasive quartzite as well as gold, copper and silver. Newmont started mining operations at Phoenix (for
Jan 1, 2009
-
Reliability of Timing Sequence Network for Multiple Blast HolesBy Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
Applying the Concept of Difficulty of Tunnelling to Brazilian CasesBy Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore
"This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in
Jan 1, 2017
-
Seal Slab Prestressed Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
SPOC Project Software and ManualBy R. F. Pilgrim
"This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a
Jan 1, 1986
-
Producing – Equipment, Methods and Materials - Deformable Diverting Agent for Improved Well StimulationBy D. S. Pye, J. P. Gallus
Successful hydraulic pressure treatment of oil and gas wells that have long producing intervals, multiple pay zones, fluid thief zones, or natural or induced fractures has long been a serious problem
Jan 1, 1970
-
Advances in Thickener Flocculant DeliveryBy A R. Heath, I Arbuthnot
Feed slurries are typically flocculated in a thickenerÆs feedwell to increase the settling rate, underflow density and overflow clarity. High molecular weight polymeric flocculants are normally used,
Jul 15, 2013
-
Use Of Large Diameter And Long Steel Pipe Piles In Japan ? SynopsisBy K. Kawakami
In Japan, pile foundations have been used extensively for buildings, bridges and port facilities. A large number of steel pipe piles were first used in the 1960's and the amount of steel used in
Jan 1, 2010
-
Metallogenic evolution of the Scandinavian CaledonidesBy F. M. Vokes, P. M. Ihlen
Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. Ore deposition was related to three major stages: continental rifting and
Jun 19, 1905
-
Securing Rail Infrastructure in RomaniaBy Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
The Gosowong Goldfield – A World-class Epithermal Gold-silver District in IndonesiaBy A Harris, N Fitzpatrick, F MacCorquodale
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Gosowong epithermal Au-Ag deposits, located on the island of Halmahera, North Maluku Pr
Mar 18, 2015
-
Annual Report of the Woman's AuxiliaryANNUAL meeting of the Woman's Auxiliary of the American Institute of Mining and Metal-lurgical Engineers convened on Tuesday morn-ing, Feb. 20, the president, Mrs. H. W. Hardinge, presiding. Pres
Jan 4, 1923
-
Erosion/Corrosion Effects on the Design and Maintenance of a Potash RefineryBy J. Davis, M. G. Reading
"INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t
Jan 1, 1983
-
Engineered Membrane Separation® (EMS®) Systems for Hydrometallurgical ApplicationsBy Larry A. Lien
"A brief summary of the different membrane separation options currently available to the mining industry will be presented and discussed. The processes described involve operating membrane plants on t
Jan 1, 2010
-
Cliffs And Associates Limited Circored® Iron PlantBy E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl
The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro
Jan 1, 2002