Search Documents

  • AUSIMM
    Tungsten Carbide in Mining

    By Gunderson C. T

    The use of carbide tipped integral drill steels and detachable bits is discussed in relation to the means of drilling or cutting employed. It is stressed that only by correct use can the full value of

    Jan 1, 1958

  • AIME
    Forthcoming Meetings Of Societies (08ac6c1d-d53b-43c5-b006-35e9aa092afd)

    Organization Place Date 1919 American Society of Civil Engineers..: Twin Cities, Minn. June 17-20 American Society of Mechanical Engineers Detroit, Mich. June 17-20 American Institute of Chemical E

    Jan 6, 1919

  • SAIMM
    New Opportunities - Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces

    By M. Hopf, E. Rossouw

    Keywords: Pyrometallurgy, furnace, copper coolers, freeze lining, monitoring, Saveway The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallu

    Jan 1, 2006

  • SME
    Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer Settler

    By B. Gigas, M. Preston, M. Giralico

    Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability

    Jan 1, 2004

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • AUSIMM
    Paper No. 170. Fine Grinding Test: Tube Mill And Grinding Pans. Broken Hill South Mine.

    IN December, 1905, a Forwood down-wheeler grinding pan (5 ft dialmter), and similar in design to those in use on the Kalgoorlie goldfields, was installed for experimental work in connection with fine

    Jan 1, 1909

  • AUSIMM
    Mine Hygiene at the North Mount Lyell Mine

    THE North Mount Lyell Mine is situated on the southern side of Mount Lyell at an altitude of 1750 ft. above sea-level. The average rainfall is 117 in., and there are generally several light falls of s

    Jan 1, 1927

  • CIM
    Climate Change: Framing The Challenge; Strategic Approaches for the Mining Industry

    By Henry Stoch

    It?s a green, green world ? Public concern about the impact of human activities on the environment and the roles that businesses play in that impact is rising. What?s happened in the last few months

    May 1, 2008

  • SAIMM
    Strategic long-term planning at Anglo Platinum - Synopsis

    By G. L. Smith

    This paper consolidates the key elements of seven contributions, on strategic long-term planning, to two of the three international conferences on Strategic versus Tactical approaches in Mining held o

    Jan 1, 2009

  • SME
    Safety Control Systems Used In A Hydrogen-Fueled Mine Vehicle

    By Chelsea Woodward

    The Spokane Research Laboratory of the National Institute for Occupational Safety and Health has demonstrated a prototype hydrogen-fueled mining vehicle as an alternative to diesel equipment in underg

    Jan 1, 2006

  • AIME
    Anthony F. Lucas Gold Metal

    In 1936 the Institute established the Anthony F. Lucas Gold Medal, which will be awarded from time to time "for distinguished achievement in improving the technique and practice of finding and produci

    Jan 1, 1937

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • SAIMM
    Noxious gas emissionss from the closed iron mines to the built-up areas on the surface

    By D. Grabowski, Z. Pokryszka

    ABSTRACT: Some residential areas of the iron basin of Lorraine (in the North-East of France) are affected by noxious gas emissions (under oxygenated, carbon dioxide loaded and radon loaded gas mixture

    Jan 1, 2003

  • CIM
    Leadership in Maintenance Best Practices - The Mining Experience

    Leadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o

    Aug 1, 2013

  • SAIMM
    Book news

    1. Book reviews Stainless Steels '84. London, Institute of Metals, 1985. £39 (U.K.), US$62 (elsewhere) Reviewer: J.B. Oalton Process engineering of size reduction: bal miling, by LG. Austin, R

    Jan 1, 1986

  • SME
    The Origins Of Public Concern With Taconite And Human Health: Reserve Mining And The Asbestos Case

    By Michael E. Berndt

    Asbestos first became an issue to Minnesota?s iron industry when it was revealed that mineral fibers similar to those in Reserve Mining?s tailings were being found in drinking water for several commun

    Jan 1, 2007

  • NIOSH
    OFR-126-77 Inherently Safe Mining Systems (Continuous) Phase III

    By D. D. Hamilton

    The ISMS program provided for the development and demonstration of equipment modifications in both conventional and continuous coal mining systems. This report describes activities during the demonstr

    Jan 1, 1976

  • AUSIMM
    The Discovery of the Nam San Copper-gold Deposit, Phu Kham, Laos

    By K J. F Logan, P W. Leaman, B A. Tucker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Nam San copper-gold deposit was discovered in 2011 and is a likely blind extension of t

    Mar 18, 2015

  • AUSIMM
    Sulphide Vein Formation During Metamorphism of The Nairne Pyrite Deposit

    Two structurally and mineralogically distinct sulphiderich veins cross-cutting the disseminated sulphides of the Nairne Pyrite Member appear to be products of local remobilization of sulphides under f

    Jan 1, 1969

  • AUSIMM
    The Surface Plant at the Zinc Corporation Mine, Broken Hill

    (This paper reviews the reasons for and the principles followed in designing and constructing complete new surface works at the mine of the Zinc Corporation Limited, Broken Hill, New South Wales, and

    Jan 1, 1940