Search Documents

  • AUSIMM
    Computers - Overcoming the Phobia: Understanding Resources - Effective Mine Planning - Increased Profit

    By M Bourke

    Modern computers and software provide powerful tools for the geologist to construct reliable models of geological resources, and the mining engineer to produce accurate and workable mine plans. Over t

    Jan 1, 1999

  • SME
    Optimal Orebody Reconstruction And Visualisation

    The authors summarise the development and recent advances in the reconstruction and visualisation of three-dimensional objects from point data and describe applications to the reconstruction of orebod

    Jan 1, 2002

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • AIME
    Certain Types of Defects in Copper Wire Caused by Improper Dies and Drawing Practice

    By H. C. Jennison

    Two distinct types of defects occur at times in copper wire as a result of the use of dies of improper design or undesirable wire-drawing practice. The conditions under which these defects may be prod

    Jan 1, 1930

  • AIME
    The Effect Of Water On The Mechanical Properties And Microstructures Of Granitic Rocks At High Pressures And High Temperatures

    By Ove Alm

    Wet and dry specimens of three rocks of approximately granitic composition were deformed at different experimental conditions. These experiments were carried out in order to study the extent to which

    Jan 1, 1982

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • IMMS
    The Benthic Impact Experiment (BIE): A Study Of Environmental Impacts Of Manganese-Nodule Mining On The Abyssal Seafloor

    By Dwight D. Trueblood

    The Benthic Impact Experiment (BIE) is designed to address the effects of sediment redeposition prior to the commencement of commercial mining. The experiment is being conducted in collaboration with

    Jan 1, 1992

  • DFI
    Bore Pile Stabilization Issues in Offshore Marine Works

    By Nuno Cruz, Saúl Rodríguez

    "When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work

    Jan 1, 2017

  • CIM
    Data Acquisition from an Industrial Zinc Flotation Circuit

    By A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda

    "The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis

    Jan 1, 1991

  • ISEE
    IDENTITY THEFT Possibilities and Consequences

    By Paul Downing

    Identity Theft Outline • What Are MY Chances??? • Types Of Thefts • Sources Of Theft Info • Stolen Identity vs. Background Checks • Information/Data Safeguards • Corporate Data Handling • Reclaiming Y

    Jan 1, 2006

  • SAIMM
    Reduction Of Chromite Ore At Different Flow Rates Of Inert Gas

    By Dolly Chakraborty, S. Ranganathan, S. N. Sinha

    Pre-reduction of chromite outside the submerged-arc furnace (SAF) can significantly lower the specific power consumption in the SAF process. Conventional processes for the pre-reduction of the ore ope

    Jan 1, 2007

  • ABM
    Adequação Do Procom(N2) Do Laminador De Tiras A Frio #2 Da Csn Para Comunicação Com O Novo Sistema De Controle De Processo (N1)

    By Flaviano Galdino

    Com a implantação do projeto de digitalização do Nível 1 no laminador de tiras a frio da CSN - Companhia Siderúrgica Nacional, a CSN modernizou o obsoleto controle de processo. Com essa modernização,

    Jul 30, 2018

  • SME
    A Roof Quality Index For Stone Mines Using Borescope Logging

    By John Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has collected pillar and span data at 34 stone mines in 10 states to develop pillar and roof span design guidelines for underground st

    Jan 1, 2009

  • CIM
    Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities

    By Godfrey MacDonald

    "The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East

    Jan 1, 1997

  • TMS
    Robotic Automation Of The Fire Assay Process For Rapid Quantitative Measurement Of Platinum Group Elements In Mineral Concentrator Plants

    By Keith S. McIntosh

    The fire assay process for the quantitative recovery of platinum group elements (PGE?s) prior to subsequent analysis traditionally is a time-consuming process. Samples derive from various ore types an

    Jan 1, 2006

  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • SME
    Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings

    By K. E. Wood, K. J. DiRocco, L. A. Becker

    The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat

    Jan 1, 2005

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2013

  • SME
    Mineralogy and upgrading ability of Mejel valley zircon ore

    By SH. Shahsavari, H. Akbari, M. Noaparast, M. Oliazadeh

    Mejel valley zircon ore in Iran is located in north part of Iran and was sampled to evaluate its concentration. The aim of this project was to define the mineralogy of this zone and separating zircon

    Jan 1, 2005