Search Documents

  • AUSIMM
    Triboelectrostatic Producing Ultra-Clean Coal

    Triboelectrostatic Producing Ultra-Clean Coal

    Sep 13, 2010

  • SAIMM
    Keynote Address: Melting of platinum group metal concentrates in South Africa

    By J. Nell

    An overview is given of the matte melting process used for the beneficiation of South African Platinum Group Metal (PGM) ores. Most producers use six-electrode furnaces to melt the concentrate and Pie

    Jan 1, 2004

  • CIM
    Social Implications of Mining Operations on Nearby Communities - A Case Study

    By Steven Townend

    Mining-related activities have been known to create a challenging operating environment for mining companies located in close proximity to communities. Issues such as noise, vibrations from mining ope

    May 1, 2011

  • NIOSH
    Emerging Technologies Control Respirable Dust Exposures For Continuous Mining And Roof Bolting Personnel

    By D. E. Pollock, T. W. Beck, J. A. Organiscak

    This work presents the findings from a number of NIOSH studies evaluating the impacts of emerging technologies that may reduce dust exposures for continuous mining and roof bolting personnel. These t

  • SAIMM
    Application Of Openrisk At Open Cast Coal Mines

    By L. Munsamy, B. J. Madden

    OpenRisk, an open cast risk rating system, takes into account relative differences in the importance of hazards, as experienced on each mine as a result of different combinations of geotechnical facto

    Jan 1, 2006

  • ISEE
    Evaluation of Optical Sizing Methods

    By Russell Carter, Tom Barkley

    "Optimization of blasting is hampered by the lack of inexpensive methods of measuringblast results. Optical methods of size analysis have the potential of creating abreakthrough in size analysis and i

    Jan 1, 1999

  • SAIMM
    Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman Dam

    By M. Shahabi, M. Kashfi

    This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of

    Jan 1, 2003

  • CIM
    Computer Control Strategy

    By R. J. McLeod

    "CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr

    Jan 1, 1973

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • SAIMM
    Numerical simulation of jointed block mass under uniaxial stress condition

    By K. S. Rao, R. P. Tiwari, V. K. Shrivastava

    ABSRACT: In this paper numerical simulation of jointed block mass behaviour obtained in an experimental study has been presented. Singh et al. (2002) conducted extensive tests on the jointed model mat

    Jan 1, 2003

  • SME
    Design And Testing Of Multi-Channel Borehole Geophone Array

    By E. C. Westman, F. J. Shreve

    This paper presents the design and construction of a multi-channel geophone array that improves tomographic imaging capabilities in both surface and underground mines. Especially important in the des

    Jan 1, 2002

  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Creep of Mg-Alloys

    By W. Blum

    Progress made in improving the creep resistance of Mg alloys is reviewed with the emphasis on microstructural interpretation. Experimental results on the increase of creep strain with time at constant

    Jan 1, 2006

  • NIOSH
    Limestone Mining – Is It Noisy Or Not?

    By D. R. Babich, E. R. Bauer

    National Institute for Occupational Safety and Health (NIOSH) researchers are conducting a cross-sectional survey of equipment noise and worker noise exposures in the mining industry. Surface and und

  • SME
    Phased Approach to Stormwater Tunnel Rehabilitation

    By Todd Wanless

    This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel

    Jan 1, 2008

  • AIME
    St. Louis Paper - Oil Fields of Russia (with Discussion)

    By T. G. Madgwick, A. Beeby Thompson

    FoR more than 2500 years, natural gas issues in the Surakhany district of the Apsheron peninsula were the object of pilgrimages by fire worshippere and Hindoos from Burma and India. Even as late as 18

    Jan 1, 1921

  • IIMP
    Gerenciamiento integrado de informaciones geológicas

    By Frederic Vanderoost

    Actualmente, el manejo adecuado de las informaciones geológicas en el sector minero optimiza recursos y maximiza resultados. En ese sentido, el presente texto señala la implantación de un conjunto de

    Aug 25, 2002

  • AIME
    The Use Of Nodulized Ore In The Blast Furnace. (1d9c5e40-a295-40d6-9332-f495be17d151)

    Discussion of the paper of Robert Henry Lee, presented at the New York Meeting, October, 1913, and printed in Bulletin No. 82, October, 1913, pp. 2515 to 2522. J. E. JOHNSON, JR., New York, N. Y.:-Th

    Jan 12, 1913

  • SME
    Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project

    By Pratoomkhuan N. Lertsgoon

    A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study

    Jan 1, 2003