Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Aeration induced moisture reduction of iron oreBy J Guo, K Williams, S Caldwell, W Chen
Mining is increasingly occurring near or below the water table. This has led to a higher rate of handling problems associated with increased moisture and increased adhesion, which lead to a higher rat
Jul 24, 2017
-
Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mineBy D. Ouellet, G. Gagnon, B. Simser, V. Falmagne
The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli
Jan 1, 2004
-
Magnetic, Gravity and Radiometric Surveys of the Waihi-Waitekauri Region, New ZealandBy C A. Locke, J Cassidy, J L. Mauk
The Waihi-Waitekauri region hosts numerous low-sulfidation epithermal deposits that both outcrop and occur at depth. Zones of intense hydrothermal alteration enclose the Au-Ag bearing quartz vein depo
Jan 1, 2003
-
25th International Conference On Ground Control In Mining - Identifying Moisture Sensitive Roof Rocks In Coal MinesBy David C. Oyler, Hakan Gurgenli, Gregory M. Molinda
Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M
-
Design And Instrumentation Of A Large Reverberation ChamberBy Roy C. Bartholomae, Jeffrey Shawn Peterson
1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci
-
RI 5259 Estimate Of Known Recoverable Reserves Of Coking Coal In Logan County, W. Va. ? ConclusionsBy William H. Tavenner
1. The 1952 Annual Report of the West Virginia Department of Mines lists nine beds that arc being mined in Logan County, of which the Cedar Grove and Chilton are the most important. The Cedar Grove gr
Jan 1, 1956
-
Professional Project Management in Mine ConstructionBy F. G. Crack, R. V. Ramani, R. L. Frantz
Management for mine construction and development differs from that needed for routine mine production and maintenance. An integrated approach to managing mine development projects must consider contra
Jan 7, 1982
-
OFR-47-77 Reducing The Operator Sound Level Of A Mining Service Vehicle - A Demonstration ProjectBy G. G. Huggins
A demonstration project has been completed to reduce the operator sound level of an underground service vehicle, a personnel dispatch wagon, to go dB(A) or less. The program objective was to implement
Jan 1, 1975
-
Institute of Metals Division - The Effects of Cold Work on the Alloy Cu3AuBy J. B. Coher, M. B. Bever
COLD work destroys long-range order, as was first observed by Dehlinger and Graf.1 Dahl2 showed that the mechanical disordering caused by cold work produces changes in those properties that are affec
Jan 1, 1961
-
Reuse of Waste in Civil Construction and other applicationsBy Paloma Camargos, Saulo De Rezende
In the pursuit of sustainable development, the mining industry is constantly evolving, recognizing the importance of utilizing all extracted materials. Nexa addresses waste management in the mining in
Sep 29, 2023
-
Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element SimulationBy Ahmad F. Souri, Murad Abu-Farsakh
"In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re
Jan 1, 2017
-
The Transition From Open Pit To Underground Mining: An Unusual Slope Failure Mechanism At PalaboraBy Hao Li, Allan Moss, Richard K. Brummer
At the Palabora Mine, the transition to caving 400 m below the bottom of the 800 m deep pit resulted in a slope failure of the North wall that began in 2003, and is still mobile. This failure can be
Jan 1, 2006
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility TunnelBy Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In BostonBy J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
The Seven Steps To Foundation RetrofitBy Javier Rodriguez
Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves
Jan 1, 2006
-
-
A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing OperationsBy D Tuazon, M Powell, M Ziemski, G D. Corder
Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and
Jul 10, 2012
-
Stratigraphic, Mineralogical and Physical Variations at Waikato - North Head, South Auckland: Preliminary ResultsBy D Pastars, J L. Mauk
Located at the southern end of the Awhitu
Jan 1, 2001
-
Physico-chemical properties and transition metal complex formation in alkali pyrosulphate and hydrogen sulphate meltsBy H. Hamma, R. Fehrmann, M. Gaune-Escard, G. Hatem, S. B. Rasmussen, K. M. Eriksen
The molten salts M2S2O7and MHSO4, the binary molten salt systems M2S2O7-MHSO4and the molten salt-gas systems M2S2O7-V2O5and M2S2O7-M2SO4-V2O5(M = Na, K, Rb, Cs) in O2, SO2and Ar atmospheres have been
Jan 1, 2004
-
Friday Morning Session, April 26 1940 - MinutesBy Open-Hearth Steel
I received a telegram yesterday from Mr. J. H. Nead saying that he regretted circumstances had come up which prevent his attending the meeting, but that arrangements have been made and Mr. T. S. Washb
Jan 1, 1940