Search Documents

  • AUSIMM
    An Investigation Into The Conditions of Preparation of Cemented Tungsten Carbide

    By Greenwood J. N

    This work was commenced at a time when information on the manufacture of cemented tungsten carbide was urgently needed in Australia. Much information of a general type has been published, but many of

    Jan 1, 1942

  • SME
    Geology Of The Biwabik Iron Formation And Duluth Complex

    By Mark A. Jirsa

    The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp

    Jan 1, 2007

  • NIOSH
    OFR-4(2)-72 Industrial Engineering Study Of Hazards Associated With Underground Coal Mine Production - Volume II - Data And Charts ? I. Introduction

    Presented in this volume are the basic mining techniques and production operations associated with underground bituminous coal mining. Chapter 2, "Multiflow Process Charts", presents, in sketch fo

    Jan 1, 1971

  • AUSIMM
    The International Network for Acid Prevention (INAP) ù Addressing a Global Need

    INAP was formed in 1998 by a number of major mining companies, with a view to sharing acid rock drainage knowledge and experience, and to coordinate global research on the management of sulfidic mine

    Jan 1, 2003

  • SAIMM
    Annual Report - For The Year Ended 30th June 2006

    Council for 2005/2006 President W.H. van Niekerk President-elect R.P.H. Willis Vice-presidents Senior R.G.B. Pickering Junior A.M. Garbers-Craig Immediate Past-president F.M.G.

    Jan 1, 2006

  • SME
    Copper Prices Help Arizona’s Mining Industry

    By William R. Yernberg

    SME’s Arizona Conference was held at the Doubletree Hotel at Reid Park in Tucson on Dec. 5and 6, 2004. The annual conference is organized by the Arizona Conference Board of Directors, which represent

    Jan 1, 2005

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand

    By I Hustwick

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. Waikato North Head 30 km south of Auckland supplies ironsand con

    Jan 1, 1990

  • NIOSH
    RI 3264 Smelting In The Lead Blast Furnace - Handling Zinciferous Charges. XV. - Slags From The Trail Blast Furnaces ? Acknowledgments

    By G. L. Oldright

    The data presented in this paper were collected at the smelter of the Consolidated Mining & Smelting Co. of Canada, Ltd., Trail (Tadanac), British Columbia. Many thanks are due to S. G. Blaylock, vice

    Jan 1, 1934

  • NIOSH
    RI 7347 Selection Of Anode Materials And Operating Conditions For Electro Winning Beryllium

    By D. A. Keefe, O&apos

    The electrowinning of beryllium from beryllium oxide (BeO) using a molten-salt electrolyte composed of 56 LiF-37 BeF2-7 BeO (mole-percent) was investigated. Anodes made of porous carbon were found to

    Jan 1, 1970

  • ISEE
    Tunnel Lining Removal and Excavation by Controlled Blasting

    By Jeff Hammer, John McGregor

    "The Twin Tunnels, originally constructed in 1964, have become a major choking point for trafficheading up to and returning from the Colorado high country along the I-70 corridor. To increase traffic

    Jan 1, 2016

  • SAIMM
    Reduction Behaviour Of The Akanvaara Chromites Of Northern Finland

    By J. Härkki, R. Hiltunen

    The Akanvaara intrusion (surface area 50-55 km2) in Savukoski, Northern Finland, hosts 23 distinct monocumulate layers of small euhedral chromite crystals enclosed in a silicate matrix. These chromiti

    Jan 1, 2004

  • TMS
    Laboratory Test Work and Plant Trials for Milling and Flotation of Slow Cooled Copper Slag

    By Alberto Oalvez, Lucya Yunus, Pengfii Tan

    "Laboratory flotation tests of slow cooled converter slag have showed that 92.5% copper recovery at the copper cut-off grade of 24 - 25 % can be achieved by using a 50:50 ratio of DSP330 and SIBX (sod

    Jan 1, 2012

  • AIME
    Reservoir Engineering – General - A Dynamic Programming Model of the Cyclic Steam Injection Process

    By R. G. Bentsen, D. A. T. Donohue

    The cyclic steam injection process has become the most widely applied and most successful thermal recovery technique in use today.1-4 Normally, steam stimulation is repeated several times during the l

    Jan 1, 1970

  • SME
    Coal 1988

    By M. L. Mellish

    The year 1988 unexpectedly turned out to be a good year for the US coal industry. In fact, it was a third consecutive year of record coal production. Accord¬ing to preliminary Energy Information Admin

    Jan 1, 1989

  • TMS
    Preparation Of Fibrous Ni-Co Alloy Precursor Articles By Modified Coprecipitation Method

    By Zhang Chuanfu

    Keywords: modified coprecipitation method, Ni-Co alloy powders, solid-solution oxalate, growth mechanism Homogeneous solid-solution oxalates of Ni2+ and Co2+ ions were synthesized by modified copre

    Jan 1, 2005

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • NIOSH
    RI 7496 Oxidation Of Cobalt-Nickel-Aluminum Alloys At 1,351° To 1,429° K

    By Robert M. Doerr

    The research objective was to determine the effect of aluminum alloy additions on the oxidation behavior of cobalt-nickel alloys. Thirty high-purity alloys were reacted with 02 at 0.5 atm at 1,351°, 1

    Jan 1, 1971

  • IOM3
    Contrasting structural controls on gold mineralization along the Eldorado shear zone, Zimbabwe

    By P. E. J. Pitfield, S. D. G. Campbell

    The regional shear zone runs along or near the southern margin of the Chinhoyi greenstone belt. It hosts four of the seven mines in the southern part of the belt with recorded production above 100 kg

    Apr 1, 1996

  • CIM
    Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy Plant

    By P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters

    The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo

    Jan 1, 2019

  • AIME
    Minerals Beneficiation - Winning Metallic Values from Leach Solutions by Sorption Processes

    By W. V. Long, D. H. Reynolds, R. B. Bhappu

    Equilibrium distribution coefficients were determined for some monovalent and polyvalent ions for several absorbing and exchanging media as functions of pH and initial ion concentration. Among ions st

    Jan 1, 1967