    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • NIOSH
    RI 9660 - Evaluation Of Systems To Monitor Blind Areas Behind Trucks Used In Road Construction And Maintenance: Phase 1

    By Todd M. Ruff

    The majority of fatalities that occur in road construction work zones in the United States involve a worker being struck by a piece of construction equipment or other vehicle. The Spokane Research La

    Jan 1, 2004

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • AUSIMM
    Mining Practice at the Zinc Corporation Ltd., Broken Hill

    By Mech B

    This paper gives a general description of mining practice at The Zinc Corporation Ltd., Broken Hill, New South Wales.The basic mining methods are those which have been common in Broken Hill for many y

    Jan 1, 1946

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • DFI
    Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results

    By Walter I. Paniagua

    Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a

    Jan 1, 2007

  • SME
    Fine Copper Grinding Using Metso’s Stirred Media Detritor

    By Graham Davey

    High-speed stirred milling is a relatively new method of grinding in the metalliferous process industries. However, it has been widely used in the industrial mineral field for more than 30 years. Man

    Jan 1, 2004

  • NIOSH
    Water Resistant Enclosure For Extensometer - Objective

    Provide long-term measurement of mine sidewall closure in backfilled stapes subject to flooding. Approach A water resistant extensometer is made by enclosing a rod-actuated transducer in a tel

    Jan 1, 1978

  • DFI
    A Historic Capitol And A Deep Excavation

    By Richard F. Sliwoski

    The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the

    Jan 1, 2006

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The

  • SAIMM
    A Model For Direct Dragline Casting In A Dipping Coal-Seam

    By B. Erdem

    This article introduces a computer model, which emphasizes panel design for draglines deployed in direct side-casting mode. The study covers flat and inclined coal-seam conditions with the dragline op

    Jan 1, 2004

  • CIM
    Ore pass database: Quebec underground metal mines

    By J. -F. Lessard

    Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti

    Jan 1, 2006

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary Displacement

    By Lewis Stansfield

    A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie

    Jan 1, 2000

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • SME
    Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration (5745d634-e632-4178-ad6f-441932595fe2)

    By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar

    There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin

  • SAIMM
    Evaluation of the Spatial Variation of Bvalue

    The estimation of the spatial variation of the b-value of the Gutenberg- Richter relationship is important for both the general interpretation of the mechanism of rock mass response and seismic hazard

    Jan 1, 2014

  • NIOSH
    RI 3116 A Study of the Properties of Texas-New Mexico Polyhalite Pertaining to the Extraction of Potash

    By N. Fragen, H. H. Stroch

    "INTRODUCTION A previous paper by H. H. Storch 4 described. three processes for the production of potassium sulphate from polyhalite (K2S01.MgSO1.2CaS04.2H2o), Since these processes depended upon calc

    Sep 1, 1931

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • SAIMM
    Copper Recovery Using Leach/Solvent Extraction/Electrowinning Technology: Forty Years Of Innovation, 2.2 Million Tonnes Of Copper Annually

    By G. A. Kordosky

    The concept of selectively extracting copper from a low-grade dump leach solution followed by stripping the copper into an acid solution from which electrowon copper cathodes could be produced occurre

    Jan 1, 2002