Search Documents

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • SME
    Tunnel Boring Machine Development

    By Martin Herrenknecht

    Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u

    Jan 1, 2008

  • CIM
    Obtaining Maximum Value from Metallurgical Projects - Avoid Throwing it Away

    By A. Eltringham

    Operations downstream of mining and beneficiation are still being subjected to increasing scrutiny as highly capitalized projects have been either slow to achieve their targets or have actually failed

    Jan 1, 2011

  • AUSIMM
    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Sep 13, 2010

  • ISEE
    The Effect of Confinement on Ground Vibration Amplitude

    By Jay Rodgers

    There has been a longstanding acceptance that burden plays a major role in the magnitude of ground vibration amplitudes generated from surface blasting. Much of the data that this belief is based upon

    Jan 1, 2003

  • SME
    King County’s Project Delivery Approach for the Brightwater Project

    By William W. Edgerton, Calvin Locke

    INTRODUCTION King County, Washington operates a regions wastewater treatment system that provides treatment to 18 cities and 16 sewer districts in the greater Seattle metropolitan area. The system

    Jan 1, 2005

  • DFI
    Large Diameter Machine Bored Piles In Australia

    By W. J. Kingwell

    Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of

    Jan 1, 1989

  • CIM
    The use of wetlands for effluent polishing at Placer Dome, Campbell Mine

    By Benoit Bissonnette, David Gelderland

    "The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi

    Jan 1, 2003

  • CIM
    Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history

    By A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham

    "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph

    Jan 1, 1987

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By Denis Thibodeau

    his paper describes a study of an altered mining extraction and the resulting Rockmass response at VALE?s Creighton Mine. Typically, the deep mining zones have strict stope extraction guidelines to

    May 1, 2013

  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004

  • RMCMI
    2008 Safety Awards

    Producers with Zero Reportables 2007!: ?New Horizon Mine, Western Fuels Colorado LLC ?Isaacs Run HWM, ICG ADDCAR Systems, LLC ?Savage Mine, Westmoreland Savage Corporation ?South Hallsville No 1

    Jan 1, 2008

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001

  • AUSIMM
    Evaluation of Irregular Deposits

    There are circumstances where the ordinary techniques of experimental variography in geostatistics û now in common use despite their recent origin û are not quite successful. This paper describes a ne

    Jan 1, 1984

  • NIOSH
    RI 3510 Cushioned Blasting - 1. Orienting Studies ? Introduction (188eae2f-cdfb-404f-98a5-422217b3dec2)

    By A. R. T. Denues

    The Explosives Division of the Bureau of Mines, United States Department of the Interior, is investigating cushioned blasting at the Explosives Testing Station, Bruceton, Pa. The general interests of

    Jan 1, 1940

  • NIOSH
    RI 3510 Cushioned Blasting - 1. Orienting Studies ? Introduction

    By A. R. T. Denues

    The Explosives Division of the Bureau of Mines, United States Department of the Interior, is investigating cushioned blasting at the Explosives Testing Station, Bruceton, Pa. The general interests of

    Jan 1, 1940

  • NIOSH
    IC 6123 Graphite - Part III - Utilization Of Graphite ? Introduction

    By Paul M. Tyler

    The outstanding trend in the graphite market is the fast-growing demand for cheaper qualities of graphite and the declining consumption of the more expensive varieties. The manufacture of graphite, cr

    Jan 1, 1929

  • AUSIMM
    Presidential Address (d5ebea7f-aa5b-44e8-8852-0e1790fcdc7e)

    Mr. Murray said: Having recently returned from a visit to America, it may be of interest to members to hear something from me of the mining fields and metallurgical works which I had the opportunity o

    Jan 1, 1927

  • RMCMI
  • RMCMI