Search Documents

  • NIOSH
    RI 5928 A Rapid Twist Test For Determining Hot-Forming Temperatures Of Steels ? Summary

    By C. S. Tout

    While investigating methods for determining the best temperatures for hot-working experimental stainless steels, the Bureau of Mines Albany Metallurgy Research Center developed a machine in which hot-

    Jan 1, 1962

  • SME
    Recent Developments In Dense Medium Cyclone Circuit Design – Preprint

    By L. Watters, R. Terry, D. Placha

    Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si

    Feb 24, 1997

  • AIME
    Preliminary Production Report From the Bureau of Mines

    A record $18.7 billion worth of metals, non- metals and fuels was produced in the U.S. during 1962, according to a year-end estimate from the USBM. The 1962 total value, based on preliminary statistic

    Jan 2, 1963

  • SAIMM
    Activity of chromium oxide in CaO-SiO2based slags at 1873 K

    By K. Morita, N. Sano

    Thermodynamic properties of chromium oxides in molten slags are very important for optimization of stainless steel refining processes as well as reduction processes of chromium ores. The solubility of

    Jan 1, 2004

  • CIM
    Sustainable standards for the mining and metallurgical industry of the 21st century

    By D. J. Kemp

    The 20th century saw changes in the mining and metallurgical industry not only technically but also in social and environmental expectations. As projects continue to become larger their visibility rai

    Jan 1, 2005

  • SAIMM
    Laboratory scale modelling of an ilmenite roaster

    By J. A. Beukes, M. Marais

    TICOR South Africa is a new titanium feed stock producer. In the Ticor South Africa plant the ilmenite feed to the smelter plant is roasted to enhance its magnetic properties. This allows for the magn

    Jan 1, 2003

  • NIOSH
    IC 9199 Mining And Reclamation Of A Central Florida Forested Wetland: A Case Study

    By James R. Boyle

    The Bureau of Mines initiated a program to address short-and long-term objectives of wetlands restoration as a option for reclamation of lands mined for phosphate. The short-term objectives were to id

    Jan 1, 1988

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • AUSIMM
    Study on the Interaction Mechanism of Flotation Reagents and Rare-Earths-Bearing Phosphate Ore

    Study on the Interaction Mechanism of Flotation Reagents and Rare-Earths-Bearing Phosphate Ore

    Sep 13, 2010

  • NIOSH
    OFR-13-74 Solutions To Problems Of Pollution Associated With Mining In Northern Idaho

    By Dale R. Ralston

    This investigation was divided into two major phases. Phase I of the study was an examination of the occurrence and production of acid water within the Bunker Hill Mine in northern Idaho. The second p

    Jan 1, 1973

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • CIM
    Analyzing Shovel Tooth Wear Patterns with an Automated Machine Vision System

    By Matthew A. Baumann

    Tooth-wear on mining shovels requires continuous monitoring. Worn teeth impede excavation performance, increase energy usage, and increase the risk of lost or broken teeth and adapters. A machine-visi

    Nov 1, 2011

  • SAIMM
    A Fluid Dynamics Simulation Of Chromium Recovery From AOD Slags During Reduction With Ferrosilicon Additions

    By Z. Lin, M. Isac, R. I. L. Guthrie

    The kinetic and thermodynamic efficiencies of chromium recovery from the slag in an AOD process during the slag de-oxidation period with ferrosilicon is a complex process affected by slag basicity, te

    Jan 1, 2004

  • NIOSH
    OFR-100-75 Hazard Analysis Of Underground Coal Mine Haulage Systems ? 1. Summary

    By Herman O. Ankenbruck

    Analyses of statistical data indicate that haulage accidents are one of the largest sources of injuries and fatalities in underground coal mines, and that the rate of accidents in transportation has b

    Jan 1, 1975

  • SME
    St. Peter Sandstone Mineral Resource Evaluation, Missouri

    By J. G. Davis

    The St. Peter Sandstone is typically a well-sorted, friable, ultra-pure, fine- to medium-grained, quartzose sandstone with silica content higher than 99 weight percent in places. The sand grains are w

    Feb 27, 2013

  • NIOSH
    OFR-113D-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume V: Mine Safety Management Case Studies

    By R. V. Ramani

    One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability o mine safety management personnel to apply analytical techniques to Injury experience data and to

    Jan 1, 1993

  • CIM
    The Boseto Copper Project

    By Brad Sampson

    Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History

    May 1, 2010

  • CIM
    Tailings Disposal at Kidd Creek Mines Ltd.

    By T. J. Yeomans

    "The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi

    Jan 1, 1986

  • SAIMM
    Observations Of Behaviour Of Oxide Inclusions At Molten Slag/Steel Interfaces

    By Y. Wang, S. Sridhar, B. Coletti, G. N. Shannon, S. Vantilt

    The final removal of inclusions in the ladle, tundish, and mold in a continuous casting process involves the kinetic steps of liquid film drainage, interface rupture, and absorption of the inclusion i

    Jan 1, 2004

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre