Search Documents

  • DFI
    Auger Pressure Grouted Displacement Piles: An Acceptable Alternative

    By Osama El-Fiky

    There are many types of deep foundations currently being used in the San Francisco Bay Area, one of the most common being driven precast, prestressed concrete (PC/PS) piles. PC/PS piles are frequently

    Jan 1, 2002

  • AUSIMM
    A Roast-Leach Method for Recovering Valuable Metals from Nickel Refinery Copper Sulphide Precipitates

    Gold, silver and palladium may be separated from the other base metals and sulphur contained in copper sulphide precipitates derived from the Sherritt-Gordon nickel process using a process involving a

    Jan 1, 1982

  • NIOSH
    OFR-111-83 Development Of A Prototype Retrofit Noise Control Treatment For Jumbo Drills

    By Nicholas R. Dixon

    This report summarizes all work performed under Phases I, II and III of U.S. Bureau of Mines Contract H0387006, "Development of a Prototype Retrofit Noise Control Treatment for Jumbo Drills." The nois

    Jan 1, 1982

  • AUSIMM
    Notes on Lake Margaret Hydro-Electric Power Scheme.

    LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and

    Jan 1, 1915

  • IOM3
    Analysis by chemical potential diagram of the oxidation of molten silver selenide

    By G. G. Barbante

    An understanding of the thermodynamics of smelting copper anode slimes is a prerequisite for improvements to the process. During slimes smelting, a silver-copper selenide matte is formed and subsequen

    Jun 21, 1905

  • SAIMM
    Design Of Primary Samplers For Slurries In Concentrators And Statistical Methods For Measuring Components Of Variance In Sampling

    By H. E. Bartlett

    In the operation of some flotation plants treating platinum ores it was found that there were imbalances between the inputs and outputs. The inputs and outputs were sampled as slurries and it was dete

    Jan 1, 2002

  • AUSIMM
    Epithermal Zeolite Deposits in Lacustrine Tuffs, Ngakuru, Taupo Volcanic Zone, New Zealand

    In the Ngakuru area, zeolite deposits occur in late Quaternary lake sediments and ignimbrites. The deposits are associated with sinters, hydrothermal eruption breccias, and quartz-adularia altered fau

    Jan 1, 2002

  • AUSIMM
    Quantity Estimation of Concentrate in Dams

    At the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat

    Jan 1, 1925

  • SME
    Studies On Mechanical Properties And Influence Of Structural Defects Of Cu-Mo Composite Materials Obtained By The PVD Method

    By V. G. Grechanyuk

    The paper presents the mechanical properties of Cu-Mo composite materials depending on the molybdenum content. The influence of structural defects on the mechanical-physical properties of the condensa

    Jan 1, 2008

  • SAIMM
    An effective face support system to minimize rockfalls - Synopsis

    By N. D. L. Burger

    An effective prototype face support system to minimize rockfalls in rockfall-prone mines was developed and patented during a project sponsored by the Mine Health and Safety Council (MHSC). An experime

    Jan 1, 2008

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • SAIMM
    Implementation Of Extra Low Profile (XLP) Mechanized Equipment In Anglo Platinum

    By G. A. Harrison

    The introduction of extra low profile (XLP) mechanized equipment within Anglo Platinum is aligned with the overall New Mining Technologies strategy to focus on continuing modernization of our mining o

    Jan 1, 2006

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • SME
    Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

    By Brain E. Gombos

    The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary

    Jan 1, 2013

  • SME
    2012 Fox Conference Turns Its Focus To International Projects

    For the first time in its history, the George A. Fox Conference let its focus venture away from the friendly confines of the East Coast of the United States to spend part of the one-day conference loo

    Jan 1, 2012

  • SAIMM
    Control Of Strong Ground Motion Of Mining-Induced Earthquakes By The Strength Of The Seismogenic Rock Mass

    By A. McGarr

    The shear stress t that can be sustained by the rock mass in the environs of a mining-induced earthquake controls the near-fault peak ground velocity v of that event according to v=0.25(ß/G)t, where ß

    Jan 1, 2002

  • SME
    The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance Tunnel

    By Jamal Rostami, Ebrahim Farrokh

    Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co

    Jan 1, 2007

  • AUSIMM
    Mining and Ore-Treatment at the Talisman Mine, Karangahake, NZ

    THE Talisman mine is situated on the Waitawheta (pronounced Wytaffetta) river just above its junction with the Chinemuri (pronounced Chinnemurre) river near Karangahake, NZ. The explored reef-bearing

    Jan 1, 1912

  • DFI
    Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980

    By William J. Rothschild

    Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers

    Jan 1, 1984

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989