Search Documents

  • CIM
    Challenges in Niobium Flotation

    By S. Kelebek, C. Gibson, M. Aghamirian

    "Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil

    Jan 1, 2015

  • SME
    Beacon Hill Station Dewatering Wells and Jet Grouting Program

    By Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson

    Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha

    Jan 1, 2007

  • AIME
    Coal - Basic Study of Internal Vertical Stress Distribution in Confined Bulk Solids

    By W. J. Verner, J. R. Lucas

    Billions of tons of bulk solid materials are processed through our industrial plants each year, and the tonnage is steadily rising. It has been estimated that for every dollar spent in industry as a w

    Jan 1, 1961

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • SME
    Design Aspects Of Underground Rescue Chambers

    By A. D. S. Gillies

    The use of refuge chambers for use in handling underground emergencies is an issue of topical relevance within the US mining industry. Chamber design is of importance to meet some new safety requireme

    Jan 1, 2012

  • AUSIMM
    Borehole Ropeways at No 2 Ore Shaft, Mount Isa Mines Limited

    The No. 2 Ore-shaft, at Mount Isa Mines Limited, involving the use of boreholes as ropeways for the upper portion thereof, constitutes, we believe, a unique feature in hoisting installations. The bore

    Jan 1, 1939

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • AUSIMM
    The Optimisation of Semi-Autogenous and Ball Mill Based Circuits for Mineral Processing by Means of Versatile and Efficient High Pressure Grinding Roll Technology

    By M J. Daniel

    Mineral resources all over the world are often heterogeneous and have variable ore properties and ore grade. As a result the ore processed in concentrating plants varies over the life of mines. Conseq

    Jan 1, 2009

  • SME
    1970s – SME Moves Headquarters From New York

    By William M. Gleason

    The war in Vietnam stretched into another decade, an American President was at the brink of impeachment, the earth was given its own day, twin tower monuments of American ingenuity were completed in N

    Jan 1, 2007

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014

  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Cadia SAG Mill Simulated Charge Behaviour

    By Walter Valery, Peter Radziszewski

    "The NewCrest Cadia operation boasts the largest SAG mill commissioned last June 1998. A request was made to shed some more light on possible SAG mill charge behaviour. Three different software were u

    Jan 1, 1999

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • TMS
    A New Recycle Process of Uranium from Spent Fuel by Selective Sulfurization

    By Nobuaki Sato

    For the recovery of uranium from spent nuclear fuel, sulfide reprocessing process, which consists of voloxidation, selective sulfurization, and magnetic separation or selective dissolution steps, are

    Jan 1, 2006

  • AUSIMM
    Some Rb-Sr Measurements on Granites Near Mount Isa

    Rb-Sr measurements on total-rock samples of granitic rocks from the Mount Isa region have confirmed the existence of two periods of granite-forming activity. The Kalkadoon Granite, together with the E

    Jan 1, 1966

  • NIOSH
    Demonstration Of Remote Mine Seal Construction

    By M. A. Trevits, T. A. Gray, L. M. Crayne, P. Glogowski

    Mine seals can he remotely constructed in underground coal mines through vertical boreholes when direct access to a fire is impossible or considered to he too dangerous. This method has great merit be

  • DFI
    The Effects Of System Components On The Deflection Of MSE Retaining Walls

    By Scott C. Vollmer

    This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str

    Jan 1, 2003

  • AUSIMM
    Air Compressing Machinery

    Apparently there is little inclination on the part of mining engineers to supplant the transmission of power by compressed air with it's formidable rival, electrical transmission. No doubt there

    Jan 1, 1902