Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United StatesBy M. Karmis
mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co
Jan 1, 1987
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian CoalfieldBy David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Extended Cut Out Distances In Continuous Miner Sections In South African CollieriesBy Ismet Canbulat
The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and
Jan 1, 2000
-
Highwall Monitoring to Combat Rockfall Accidents at Opencast CollieriesBy John Latilla
Following its introduction on underground collieries, the mandatory Code of Practice to Combat Rockfall Accidents (CoP) was applied to all opencast operations of lngwe Collieries (the South African di
Jan 1, 2002
-
Roof Instability of Longwall Face at Ikeshima CollieryBy Kikro Matsui
Longwall mining 1s more productive in comparison to other methods but requires particular conditions for its effective use This paper relates to longwall roof instability at Ikeshima Colliery In order
Jan 1, 1997
-
Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving MiningBy Wenbing Guo
Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and
Jan 1, 2011
-
Load Transfer Mechanics In Fully-Grouted Roof BoltsBy Maynard O. Serbousek
The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b
Jan 1, 1984
-
Formation of Face Headings Using Stress Relief at Asfordby MineBy John Cassie
The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la
Jan 1, 1997
-
The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in ChinaBy Jiacheng Wang
The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la
Jan 1, 2011
-
Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface StructuresBy Yi You
A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term
Jan 1, 1997
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine
Jan 1, 1998
-
Impact Of Horizontal Load On Shield SupportsBy Thomas M. Barczak
A theoretical evaluation of the impact of horizontal load on shield support capacity is made from a static rigid body analysis of the shield structure. Parameters affecting horizontal support resistan
Jan 1, 1984
-
Roof Bolting Application In Longwall Mining In Indonesia And JapanBy Herryal Anwar
The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that
Jan 1, 1999
-
Mining-Induced Stress Measurement With Hydraulic Borerole Pressure CellsBy Paul A. Lu
This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t
Jan 1, 1984
-
Calculating the Mining-Induced Horizontal Deformation IndicesBy Krzysztof Tajdus
In Europe, horizontal strain is a primary parameter for estimating building hazard resistance. Other measured indices, like curvature, are less important, since in most cases of European excavation de
Jan 1, 2011
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Remote Detection Of Abandoned Mine Workings Using Radio Imaging Method TechniquesBy James G. Schotsch
Unmapped abandoned mines are hazards for under¬ground mines, surface mines and surface structures. The Radio Imaging Method (RIM) provides a cross borehole technique to remotely detect abandoned mine
Jan 1, 1990
-
The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal SeamBy Rodger Fry
All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an
Jan 1, 1984
-
Problems in "Void" Detection in Coal Mine Water HazardsBy Francis Kendorski
One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe
Jan 1, 2004