Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunnel Boring at Stillwater’s East Boulder ProjectBy Clayr Alexander
Stillwater Mining Co. (SMC) is engaged in developing, extracting, processing and refining palladium, platinum and associated metals (PGM)from the J-M Reef. This geological formation is located in Sti
Jan 1, 1999
-
Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground DepositBy C. Deutsch
Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells
Jan 1, 2007
-
Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line ConditionsBy J. D. Miller, C. L. Lin
Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l
Jan 1, 2001
-
The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. MetroBy Carl G. Bock
INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven
Jan 1, 1976
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
A century of mining safety and health research A century of mining safety and health research A century of mining safety and health researchBy John A. Breslin
The year 2010 will mark the 100th anniversary of the beginning of the research efforts by the U.S. government to improve the health and safety of miners working in the United States. This research
Jan 1, 2010
-
Industrial Minerals 2001Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committee
Jan 1, 2002
-
WMATA Use Of The New Austrian Tunneling Method For Lining And SupportBy Larry H. Heflin
The Washington Metropolitan Area Transit Authority's Wheaton Station and tunnel design was completed and offered for bid in the Spring of 1983. The format was unique to the Authority: a four part
Jan 1, 1985
-
Oilwell Cementing: What Is Next?By A. Mahmoudkhani
Primary cementing is the process of placing cement in the annulus between the casing and the formations exposed to the wellbore. Portland cement was first used in 1903 in the Lopoc Field in California
Jan 1, 2012
-
Exploration remains hotAs metal prices fluctuated over the years, so too have the fortunes of many of those mining in Canada?s Yukon province. With a rich mining history that dates back to the Klondike gold rush of 1896 to
Jan 1, 2010
-
New York Subway Caverns and Crossovers—A Tale of Trials and TribulationsBy Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005
-
Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143By N. Merriam
This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo
Feb 24, 1997
-
Alternative Final Cavern Linings For The East Side Access Transit ProjectBy Colin Barratt
The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and
-
Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)By S. Ersayin
In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im
Jan 1, 2008
-
Tunnel Excavation Grand Coulee Third Power PlanBy D. J. Duck
INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos
Jan 1, 1997
-
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, ColombiaBy Ludger Suarez-Burgoa
At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod
Jan 1, 2008
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Geology Of The Biwabik Iron Formation And Duluth ComplexBy Mark A. Jirsa
The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp
Jan 1, 2007
-
Targeting and Prioritizing Safety Interventions in West Virginia – Preprint 97-51By J. M. Dean, R. L. Grayson, R. C. Althouse, M. J. Klishis, G. L. Winn
Using powerful database management software, nested-field analysis and microanalysis of narratives have been made of West Virginia accident data, resulting in a new approach for targeting and prioriti
Feb 24, 1997
-
Development of the Design Build Philosophy—Tren Urbano to Second Avenue SubwayBy Chris Bennett, Drupad Desai, Kirit Mevawala
INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg
Jan 1, 2005