Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modelling of Geomechanics and Geoecological State of Massif in Region of Large-Scale Mining Work with Using of Supercomputer TechnologyBy O. Konovalov, M. Zhuravkov
In report the results of performance of research works on building up of the connected geoecological and geomechanical monitoring system for modelling and study of a state of mining massif in a region
Jan 1, 2005
-
Benefits Analysis Of Expert Control SystemsBy A. Broussaud, J. D. McKay
Benefits analysis of adaptive Expert control systems operating at plants in Africa and the United States are presented. Proper statistical tools and techniques are discussed. Technical and practical
Jan 1, 2001
-
Singapore’s Deep Tunnel Sewerage System—Experiences and ChallengesBy Richard F. Flanagan, Robert H. Marshall
The Republic of Singapore’s Public Utilities Board is implementing the Deep Tunnel Sewerage System Project. The project’s deep tunnel component, 48 km of deep, large diameter sewer tunnels has been su
Jan 1, 2007
-
112th National Western Mining Conference attracts heavyweightsThe 112th Annual National Western Mining Conference (NWMC) hosted by the Colorado Mining Association (CMA) drew some political heavyweights, if by voice only, into the fray of two of the hottest topic
Jan 4, 2010
-
Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control ProblemsBy K. Saikiran, A. R. Nalla
Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat
Jan 1, 2000
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Gas Mitigation In The Mill Creek TunnelBy R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
Capillary Cover Design For Leach Pad ClosureBy K. Burke, G. Zhan, A. Mayer
A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil
Jan 1, 2001
-
Evaluation Of Mechanical Excavation Systems For Oil Shale MiningBy Robert H. Robinson, Levent Ozdemir, Russell J. Miller
The paper summarizes an investigation into the applicability of mechanical excavation to oil shale mining; identifies available machine types that are best suited to various aspects of the mining oper
Jan 1, 1983
-
A Model For The Adsorption Of Hydrolysable Cations On Silica - Preprint 09-131By S. Vivek
An atomic force microscope (AFM) was used to measure the surface forces between silica surfaces immersed in solutions of hydrolysable cations and/or sodium oleate. Hydrophobic forces were observed at
Jan 1, 2009
-
Investigation of Stability of an Unconventional Water-Obstruction Gate Pillar with a Curved Boundary in Mining Inclined Ultra-Thick Coal SeamsBecause of complex geological environments, a number of coal reserves occur in inclined or dipping coal seams in certain parts of the world. Longwall top coal caving using split-level a singleentry pa
Jan 7, 2020
-
Discussion - Copper and Its Byproducts Technical Papers, MINING ENGINEERING, vol. 35, No. 4, April 1983, p. 343-347By M. Lonoff
G. Campbell The paper by M. Lonoff looks at the importance of byproduct prices on copper production. The paper develops several interesting points on this topic, but there are some points in the theo
Jan 11, 1983
-
GIS and Bauxite Mining in JamaicaBy Jim Baumann
Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin
Jan 1, 2002
-
Vernal Mine: 19 Years Without a Lost-Time AccidentBy John B. Spencer
Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An
Jan 1, 2004
-
Adeco As An Alternative To NATM: How It Works, WHY It WorksBy Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
North American Tunneling Conference Drives ValueThe theme of the 2012 North American Tunneling conference (NAT) was ?Tunneling: Driving Value.? This theme best reflects where the tunneling and underground construction industry is to-day. Major ad
Jan 1, 2012
-
Comparison Of Mine Ventilation Simulation SoftwareVentilation network modeling in mine planning dates back at least three decades, but it is not widely accepted and/or practiced until the last decade, thanks to the advent of modern computers with the
Jan 1, 2012
-
An Innovation In Machine TunnelingBy J. Donovan Jacobs
Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con
Jan 1, 1974
-
Maintenance Contract on Cat 785 Trucks Works Well at Round MountainBy J. B. Rasmussen
As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle
Jan 1, 1991
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011