Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvement Of Gold Recovery From Gold-copper Ores By Ammoniacal CyanidationBy Tong Deng, Yun Ma
Gold-copper ores have become important gold resources (von Michaelis, 1989), but the gold extraction from such materials posed a challenge due to the detrimental effect of copper species on gold cyani
Jan 1, 1996
-
Freezing to Tanking: Challenges of the City Link Driven TunnelsBy Clive Wilson, Bruce Hutchison, Daniel N. Adams
Two three-lane highway tunnels, 700 and 2900 m long, make up the driven tunnels portion of Melbourne City Link. Tunnel construction, using design-construct delivery, commenced in May 1996. Constructio
Jan 1, 1999
-
Chemical Oxidation Treatment And Heap Leaching Of Refractory Gold OresBy Douglas R. Shaw
The results are discussed herein of laboratory and pilot scale research which has demonstrated some exciting prospects for the exploitation of refractory gold resources by heap leaching. The research
Jan 1, 1996
-
Co-disposal Of Tailings And Mine WasteBy Kevin Phelan, Gary Johnson, Peter Sperring
The vast majority of tailings in the Western Australian Goldfields are deposited in purpose-built storage facilities. At mine-sites with open-pit mining operations there is also the requirement to min
Jan 1, 1995
-
Tunnel Support Loading Caused By Rock FailuresBy J. J. K. Daemen, C. Fairhurst
Two aspects of tunnel support design are considered, and for both particular attention is paid to the influence of rock failure around the tunnel on the loads developed on the supports. 1) In gener
Jan 1, 1997
-
Clays – A Review of 1992 ActivitiesBy K. L. Kayler
Ball clay production in 1991 amounted to about 800 kt (880,000 st), about the same as in 1990. 1992 estimates show a 5% decrease to 750 kt (827,000 st). This decrease continued a trend of reduced prod
Jan 1, 1993
-
Discussion – Engineering to Reduce the Cost of Roof Support in a Coal Mine …- Mining Engineering, Vol. 43, No. 8 pp.1062-1065 – Khair, A. W. and Peng, S. S.By S. Serata
Background Results of the above study in the August 1991 issue of Mining Engineering offer valuable lessons in the solution of cutter-roof problems. The original study plan was initiated by the dis
Jan 1, 1992
-
Report On The Symposium On The Development Of Underground SpaceBy D. C. Willett
INTRODUCTION The Symposium on the Development of Underground Space, held in Seattle, Washington, from October 1 through 3, 1980, was organized by the "Deep Space" subcommittee of the ASCE's Un
Jan 1, 1981
-
Tunneling In A Copper Mine - Portents Of Success From FailureBy Robert D. Talvensaari
It is indeed an honor for White Pine, as a member of the copper mining industry, to participate in this Rapid Excavation Conference. Although our presentation, as the title indicates, is not a success
Jan 1, 1974
-
Offshore Shaft Construction In The North SeaBy J. N. Adamson
The Alcan Smelter project at Lynemouth on the Northumbrian coast draws cooling water for the power station through shafts and tunnels from the North Sea. The sea at this part of the coast is frequentl
Jan 1, 1997
-
Progress Toward Continuous Drill And Blast TunnelingBy Allan T. Fisk, Carl R. Peterson, Robert G. Lundquist
A long recognized goal in high speed tunneling and mining has been the development of a continuous drill and blast excavation capability. Both the advance rate and the economy of drill and blast tunne
Jan 1, 1979
-
Intelligent Data Exchange Based on a Consistent Data ModelBy P. Hornby, S. Henley
INTRODUCTION The project described in this paper is designed to provide a standard and flexible method by which data can be exchanged among different systems and packages in common use for geo- lo
Jan 1, 1996
-
Autoclave Process Development at Lone TreeBy Gary L. Simmons
Aqueous pressure oxidation at low temperature, although desirable from a process engineering and operations point of view, presents unique problems when temperatures approach 160°C (320°F). In develop
Jan 1, 1993
-
Microbial Column Leaching of a Refractory, Carbonaceous Gold OreBy John W. Greene
For the past two years, Tenneco Minerals Company has been evaluating a refractory, pyritic, carbonaceous gold deposit, Results from agitated biological oxidation reactor tests show the gold extraction
Jan 1, 1990
-
Treatment of Arsenopyrite Ores with the Redox ProcessBy Peter A. Dawson, Rod L. Leonard, Karen S. Christensen
An investigation has been completed of the technical and economic feasibility of construction of a processing facility for gold extraction from arsenical tailings, grading nearly 12 g/t, stockpiled ne
Jan 1, 1990
-
Peroxide-Assisted Leach; Three Years of Increasing SuccessBy Juergen Loroesch
Since the introduction of Peroxide Assisted Leach, PAL™, in the gold mining industry three years ago, seven plants in Australia and South Africa have successfully employed this process. Significant i
Jan 1, 1990
-
Roasting at Golden BearBy J. S. McAlpine, J. Matousek, W. Muir, P. Downey, K. Major
The Golden Bear refractory gold ore roasting operation is located at Huddy Lake, in northwestern British Columbia, about BO km northwest of Telegraph Creek (see Figure 1). The mine access road, used f
Jan 1, 1992
-
Cyanide Recovery Pilot Testing And Process DesignBy Michael Botz, Craig McKenzie
Recovery of cyanide from mill tailings can be conducted to lower the overall cost of precious metals extraction, while lowering cyanide concentrations in mill discharges and potentially eliminating th
Jan 1, 1997
-
Discussion - Design of grinding balls - by D.J. Dunn Technical Papers, MINING ENGINEERING, Vol. 41, No. 9 September 1989, pp. 951 -955Dunn has written an excellent paper providing a wealth of advice on what is often the most costly consumable in the mineral processing plant. As he pointed out, grinding media selection and quality co
Jan 1, 1991
-
Stability Assessment Of A Wide Stops Excavation In A Lead-Zinc MineBy P. R. Sheorey, D. Barat, B. Singh
Presented is a stability analysis for a trial stope in a lead-zinc mine. The trial scope would have an excavation width of 20 m with an initial height of 3 m. Filling would commence when the scope was
Jan 1, 1981